Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential New Launch Source: rera.ka

Sobha One Residences RERA Details - PRM/KA/RERA/1250/304/PR/080526/008637 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sobha One Residences under registration PRM/KA/RERA/1250/304/PR/080526/008637 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1250/304/PR/080526/008637
  • Project Name ONE RESIDENCES AT SOBHA ONE WORLD Ph2 W3 and 4
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Rural
  • Taluka Hosakote
  • Original Completion 30 November 2032
  • Documents 149 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 18 August 2026 Expected commencement of civil works and foundation on site.
Original Completion 30 November 2032 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

SOBHA LIMITED
Registered Address Sobha Limited Bangalore 560103 ,Sarjapur-Marthahalli Outer Ring Road,Bellandur Post ,Bengaluru East ,Bengaluru Urban-560103
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address SY.NO. 27, 31/1, 31/2, 31/3, 31/4, 33/1, 33/2, 36/1 66/1, 66/2, 66/4, 67(P), 68/1(P), 69/1(P) of , Amanidoddakere Village, Kasaba Hobli , Hosakote , Bengaluru Rural, Karnataka - 562114

RERA Coordinates

Latitude, Longitude 13.058182, 77.775577
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. STRRPA/TP/CC/652/2025-26/318
Authority Satellite Town Ring Road Planning Authority
Approved Date 07 May 2026

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Wing 03 3 47 0 265 Residential 146.5 46 265
Wing 04 3 47 0 265 Residential 146.5 46 265

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
  • Wing 03
  • Wing 04
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
1 3 BHK 89.19 3021
1 3 BHK 89.19 3022
1 3 BHK 89.19 3023
1 3 BHK 89.19 3024
1 2 BHK 60.23 3025
1 2 BHK 60.23 3026
2 3 BHK 89.19 3031
2 3 BHK 89.19 3032
2 3 BHK 89.19 3033
2 3 BHK 89.19 3034
2 2 BHK 60.23 3035
2 2 BHK 60.23 3036
3 3 BHK 89.19 3041
3 3 BHK 89.19 3042
3 3 BHK 89.19 3043
3 3 BHK 89.19 3044
3 2 BHK 60.23 3045
3 2 BHK 60.23 3046
4 3 BHK 89.19 3051
4 3 BHK 89.19 3052
4 3 BHK 89.19 3053
4 3 BHK 89.19 3054
4 2 BHK 60.23 3055
4 2 BHK 60.23 3056
5 3 BHK 89.19 3061
5 3 BHK 89.19 3062
5 3 BHK 89.19 3063
5 3 BHK 89.19 3064
5 2 BHK 60.23 3065
5 2 BHK 60.23 3066
6 3 BHK 89.19 3071
6 3 BHK 89.19 3072
6 3 BHK 89.19 3073
6 3 BHK 89.19 3074
6 2 BHK 60.23 3075
6 2 BHK 60.23 3076
7 3 BHK 89.19 3081
7 3 BHK 89.19 3082
7 3 BHK 89.19 3083
7 3 BHK 89.19 3084
7 2 BHK 60.23 3085
7 2 BHK 60.23 3086
8 3 BHK 89.19 3091
8 3 BHK 89.19 3092
8 3 BHK 89.19 3093
8 3 BHK 89.19 3094
8 2 BHK 60.23 3095
8 2 BHK 60.23 3096
9 3 BHK 89.19 3101
9 3 BHK 89.19 3102
9 3 BHK 89.19 3103
9 3 BHK 89.19 3104
9 2 BHK 60.23 3105
9 2 BHK 60.23 3106
10 3 BHK 89.19 3111
10 3 BHK 89.19 3112
10 3 BHK 89.19 3113
10 3 BHK 89.19 3114
10 2 BHK 60.23 3115
10 2 BHK 60.23 3116
11 3 BHK 89.19 3121
11 3 BHK 89.19 3122
11 3 BHK 89.19 3123
11 3 BHK 89.19 3124
11 2 BHK 60.23 3125
11 2 BHK 60.23 3126
12 3 BHK 89.19 3131
12 3 BHK 89.19 3132
12 3 BHK 89.19 3133
12 3 BHK 89.19 3134
12 2 BHK 60.23 3135
12 2 BHK 60.23 3136
13 3 BHK 89.19 3141
13 3 BHK 89.19 3142
13 3 BHK 89.19 3143
13 3 BHK 89.19 3144
13 2 BHK 60.23 3145
13 2 BHK 60.23 3146
14 3 BHK 89.19 3151
14 3 BHK 89.19 3152
14 3 BHK 89.19 3153
14 3 BHK 89.19 3154
14 2 BHK 60.23 3155
14 2 BHK 60.23 3156
15 3 BHK 89.19 3161
15 3 BHK 89.19 3162
15 3 BHK 89.19 3163
15 3 BHK 89.19 3164
15 2 BHK 60.23 3165
15 2 BHK 60.23 3166
16 3 BHK 89.19 3171
16 3 BHK 89.19 3172
16 3 BHK 89.19 3173
16 3 BHK 89.19 3174
16 2 BHK 60.23 3175
16 2 BHK 60.23 3176
17 3 BHK 89.19 3181
17 3 BHK 89.19 3182
17 3 BHK 89.19 3183
17 3 BHK 89.19 3184
17 2 BHK 60.23 3185
17 2 BHK 60.23 3186
18 3 BHK 89.19 3191
18 3 BHK 89.19 3192
18 3 BHK 89.19 3193
18 3 BHK 89.19 3194
18 2 BHK 60.23 3196
19 3 BHK 89.19 3201
19 3 BHK 89.19 3202
19 3 BHK 89.19 3203
19 3 BHK 89.19 3204
19 2 BHK 60.23 3205
19 2 BHK 60.23 3206
20 3 BHK 89.19 3211
20 3 BHK 89.19 3212
20 3 BHK 89.19 3213
20 3 BHK 89.19 3214
20 2 BHK 60.23 3215
20 2 BHK 60.23 3216
21 3 BHK 89.19 3221
21 3 BHK 89.19 3222
21 3 BHK 89.19 3223
21 3 BHK 89.19 3224
21 2 BHK 60.23 3225
21 2 BHK 60.23 3226
22 3 BHK 89.19 3231
22 3 BHK 89.19 3232
22 3 BHK 89.19 3233
22 3 BHK 89.19 3234
22 2 BHK 60.23 3235
22 2 BHK 60.23 3236
23 3 BHK 89.19 3241
23 3 BHK 89.19 3242
23 3 BHK 89.19 3243
23 3 BHK 89.19 3244
23 2 BHK 60.23 3245
23 2 BHK 60.23 3246
24 3 BHK 89.19 3251
24 3 BHK 89.19 3252
24 3 BHK 89.19 3253
24 3 BHK 89.19 3254
24 2 BHK 60.23 3255
24 2 BHK 60.23 3256
25 3 BHK 89.19 3263
25 3 BHK 89.19 3264
25 2 BHK 60.23 3265
25 2 BHK 60.23 3266
26 3 BHK 89.19 3271
26 3 BHK 89.19 3272
26 3 BHK 89.19 3273
26 3 BHK 89.19 3274
26 2 BHK 60.23 3275
26 2 BHK 60.23 3276
27 3 BHK 89.19 3281
27 3 BHK 89.19 3282
27 3 BHK 89.19 3283
27 3 BHK 89.19 3284
27 2 BHK 60.23 3285
27 2 BHK 60.23 3286
28 3 BHK 89.19 3291
28 3 BHK 89.19 3292
28 3 BHK 89.19 3293
28 3 BHK 89.19 3294
28 2 BHK 60.23 3296
29 3 BHK 89.19 3301
29 3 BHK 89.19 3302
29 3 BHK 89.19 3303
29 3 BHK 89.19 3304
29 2 BHK 60.23 3305
29 2 BHK 60.23 3306
30 3 BHK 89.19 3311
30 3 BHK 89.19 3312
30 3 BHK 89.19 3313
30 3 BHK 89.19 3314
30 2 BHK 60.23 3315
30 2 BHK 60.23 3316
31 3 BHK 89.19 3321
31 3 BHK 89.19 3322
31 3 BHK 89.19 3323
31 3 BHK 89.19 3324
31 2 BHK 60.23 3325
31 2 BHK 60.23 3326
32 3 BHK 89.19 3331
32 3 BHK 89.19 3332
32 3 BHK 89.19 3333
32 3 BHK 89.19 3334
32 2 BHK 60.23 3335
32 2 BHK 60.23 3336
33 3 BHK 89.19 3341
33 3 BHK 89.19 3342
33 3 BHK 89.19 3343
33 3 BHK 89.19 3344
33 2 BHK 60.23 3345
33 2 BHK 60.23 3346
34 3 BHK 89.19 3351
34 3 BHK 89.19 3352
34 3 BHK 89.19 3353
34 3 BHK 89.19 3354
34 2 BHK 60.23 3355
34 2 BHK 60.23 3356
35 3 BHK 89.19 3361
35 3 BHK 89.19 3362
35 3 BHK 89.19 3363
35 3 BHK 89.19 3364
35 2 BHK 60.23 3365
35 2 BHK 60.23 3366
36 3 BHK 89.19 3371
36 3 BHK 89.19 3372
36 3 BHK 89.19 3373
36 3 BHK 89.19 3374
36 2 BHK 60.23 3375
36 2 BHK 60.23 3376
37 3 BHK 89.19 3381
37 3 BHK 89.19 3382
37 3 BHK 89.19 3383
37 3 BHK 89.19 3384
37 2 BHK 60.23 3385
37 2 BHK 60.23 3386
38 3 BHK 89.19 3391
38 3 BHK 89.19 3392
38 3 BHK 89.19 3393
38 3 BHK 89.19 3394
38 2 BHK 60.23 3396
39 3 BHK 89.19 3401
39 3 BHK 89.19 3402
39 3 BHK 89.19 3403
39 3 BHK 89.19 3404
39 2 BHK 60.23 3405
39 2 BHK 60.23 3406
40 3 BHK 89.19 3411
40 3 BHK 89.19 3412
40 3 BHK 89.19 3413
40 3 BHK 89.19 3414
40 2 BHK 60.23 3415
40 2 BHK 60.23 3416
41 3 BHK 89.19 3421
41 3 BHK 89.19 3422
41 3 BHK 89.19 3423
41 3 BHK 89.19 3424
41 2 BHK 60.23 3425
41 2 BHK 60.23 3426
42 3 BHK 89.19 3431
42 3 BHK 89.19 3432
42 3 BHK 89.19 3433
42 3 BHK 89.19 3434
42 2 BHK 60.23 3435
42 2 BHK 60.23 3436
43 3 BHK 89.19 3441
43 3 BHK 89.19 3442
43 3 BHK 89.19 3443
43 3 BHK 89.19 3444
43 2 BHK 60.23 3445
43 2 BHK 60.23 3446
44 3 BHK 89.19 3451
44 3 BHK 89.19 3452
44 3 BHK 89.19 3453
44 3 BHK 89.19 3454
44 2 BHK 60.23 3455
44 2 BHK 60.23 3456
45 3 BHK 89.19 3461
45 3 BHK 89.19 3462
45 3 BHK 89.19 3463
45 3 BHK 89.19 3464
45 2 BHK 60.23 3465
45 2 BHK 60.23 3466
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Fd 7 ITR AY 2025-26.Pdf
Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Fd 1 Financials FY 2024-25.Pdf
Fd 2 Balance Sheet Mar 2024.Pdf
Fd 3 Balance Sheet Mar 2023.Pdf
Fd 4 Financials FY 2024-25.Pdf
Fd 5 Profit Loss Statement Mar 2023.Pdf
Fd 6 Profit Loss Statement Mar 2023.Pdf
Fd 8 ITR Ack AY 2024 25.Pdf
Fd 9 ITR AY 2023 24.Pdf
Fd 10 Financials FY 2024-25.Pdf
Fd 11 DR 2023 24.Pdf
Fd 12 DR 2022 23.Pdf
Fd 13 Financials FY 2024-25.Pdf
Fd 14 Cash Flow Mar 2024.Pdf
Fd 15 Cash Flow Mar 2023.Pdf
Fd 16 Financials FY 2024-25.Pdf
Fd 17 Auditors Report FY 2023 2024.Pdf
Fd 18 Auditors Report Mar 2023.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Photo 4 Project Photo
Photo 5 Project Photo
Photo 6 Project Photo
Photo 7 Project Photo
Od 1 Development Plan.Pdf
Od 2 Development Plan Letter.Pdf
Od 3 Clarification On Sales Ph2.Pdf
Od 4 Area Demarcation PHASE 02.Pdf
Od 5 1 Land Cost Calculation Attested All Phases.Pdf
Od 6 2 AREA BIFURCATION DETAILS.Pdf
Od 7 3 ADLR Sketch.Pdf
Od 8 4 CDP Demarcation.Pdf
Od 9 5 Village Map Demarcation.Pdf
Od 10 Litigation Affidavit-Ph 2 W 3 & 4.Pdf
Od 11 6 Amenities Details.Pdf
Od 12 7 Common Area Details.Pdf
Od 13 8 Water Source With Borewell Photos.Pdf
Od 14 9 SDL To Sobha Limited.Pdf
Od 15 Eng Estimation Summary Ph2.Pdf
Ed 37 08-05-2026
Od 16 Hissa Tippani Sy No 27 31 33 36 68.Pdf
Od 17 Akarbandh Sy No 27 31 33 36 66 68 69.Pdf
Od 18 Atlas Sy No 36 65 66 68.Pdf
Od 19 1 Sobha-Syno174-2 4 6 & 8 Opinion.Pdf
Od 20 2 Sobha-Syno65-1 2 3 4 Opinion.Pdf
Od 21 3 Sobha-Syno62-1 2 3 4 & 5 Opinion.Pdf
Od 22 4 Sobha-Syno60-1 2 3 4 & 5 Opinion.Pdf
Od 23 5 Sobha-Syno59-1 2 3 Opinion.Pdf
Od 24 6 Sobha-Syno56-3 4 5 And 6 Opinion.Pdf
Od 25 7 Sobha-Syno35-1 2 3 Opinion.Pdf
Od 26 8 Sobha-Syno31-1 2 3 & 4 Opinion.Pdf
Od 27 9 Sobha-Syno21-1A 1B 2 3 And 4 Opinion.Pdf
Od 28 10 Sobha-Syno22-2 Opinion.Pdf
Od 29 11 Sobha-Syno26 Opinion.Pdf
Od 30 12 Sobha-Syno27 Opinion.Pdf
Od 31 13 Sobha-Syno32 Opinion.Pdf
Od 32 14 Sobha-Syno33-1-2 & 3 Opinion.Pdf
Od 33 15 Sobha-Syno36-1 & 2 Opinion.Pdf
Od 34 16 Sobha-Syno50 Opinion.Pdf
Od 35 17 Sobha-Syno52-1 Opinion.Pdf
Od 36 18 Sobha-Syno54-1-2 & 3 Opinion.Pdf
Od 37 19 Sobha-Syno57-3A-3B & 3C Opinion.Pdf
Od 38 20 Sobha-Syno58 Opinion.Pdf
Od 39 21 Sobha-Syno61-1 & 3 Opinion.Pdf
Od 40 22 Sobha-Syno173-1 Opinion.Pdf
Ed 1 08-05-2026
Ed 2 08-05-2026
Ed 3 08-05-2026
Ed 4 08-05-2026
Ed 5 08-05-2026
Ed 6 08-05-2026
Ed 7 08-05-2026
Ed 8 08-05-2026
Ed 9 08-05-2026
Ed 10 08-05-2026
Ed 11 08-05-2026
Ed 12 08-05-2026
Ed 13 08-05-2026
Ed 14 08-05-2026
Ed 15 08-05-2026
Ed 16 08-05-2026
Ed 17 08-05-2026
Ed 18 08-05-2026
Ed 19 08-05-2026
Ed 20 08-05-2026
Ed 21 08-05-2026
Ed 22 08-05-2026
Ed 23 08-05-2026
Ed 24 08-05-2026
Ed 25 08-05-2026
Ed 26 08-05-2026
Ed 27 08-05-2026
Ed 28 08-05-2026
Ed 29 08-05-2026
Ed 30 08-05-2026
Ed 31 08-05-2026
Ed 32 08-05-2026
Ed 33 08-05-2026
Ed 34 08-05-2026
Ed 35 08-05-2026
Ed 36 08-05-2026
Ed 38 08-05-2026
Ed 39 08-05-2026
Ed 40 08-05-2026
Ed 41 08-05-2026
Ed 42 08-05-2026
Ed 43 08-05-2026
Ed 44 08-05-2026
Ed 45 08-05-2026
Ed 46 08-05-2026
Ed 47 08-05-2026
Ed 48 08-05-2026
Ed 49 08-05-2026
Ed 50 08-05-2026
Ed 51 08-05-2026
Ed 52 08-05-2026
Ed 53 08-05-2026
Ed 54 08-05-2026
Ed 55 08-05-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Axis Bank
Account Number (RERA) 925020033650713
IFSC UTIB0001541
Branch Address MG Road
Country/City