Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential New Launch Source: rera.ka

Mahindra Blossom RERA Details - PRM/KA/RERA/1251/446/PR/171225/008348 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Mahindra Blossom under registration PRM/KA/RERA/1251/446/PR/171225/008348 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/171225/008348
  • Project Name MAHINDRA BLOSSOM
  • Project Type Mixed Development
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 31 October 2030
  • Documents 81 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 January 2026 Expected commencement of civil works and foundation on site.
Original Completion 31 October 2030 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

MAHINDRA LIFESPACE DEVELOPERS LIMITED
Registered Address C2, IBC Knowledge Park Gate, IBC Knowledge Park, Bannerghatta Main Road,Sadduguntepalya ,Bengaluru South ,Bengaluru Urban-560029
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address KATHA NO. 5120, MUNICIPAL NO. 363, SY NO. 149 & 150, PATTANDUR AGRAHARA VILLAGE , K R PURAM HOBLI, WARD NO.83, E PID NO. 3958103673 , Bengaluru East , Bengaluru Urban, Karnataka - 560066

RERA Coordinates

Latitude, Longitude 12.98641, 77.752588
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. PRJ/6159/25-26
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 16 December 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Wing A 0 30 0 112 Residential 87.3 29 112
Wing B 0 30 0 163 Residential 87.3 29 163
Wing C 1 30 0 110 Residential 87.3 29 110
Wing D 1 29 0 108 Residential 87.3 28 108
Wing E 1 29 0 133 Residential 87.3 28 133
Wing F 1 28 0 107 Residential 84.3 27 107
RETAIL 0 3 0 0 Commercial 7.65 1 2

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 5
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
COMMERCIAL 0 units
  • Wing A
  • Wing B
  • Wing C
  • Wing D
  • Wing E
  • Wing F
  • RETAIL
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 1 BHK 39.02 A0101
GF 1 BHK 39.02 A0102
GF 1 BHK 39.02 A0104
1 3 BHK 121.52 A0201
1 2 BHK+S 105.44 A0202
2 4 BHK 138.24 A0301
2 3 BHK+S 122.26 A0302
2 4 BHK 138.24 A0304
3 4 BHK 138.24 A0401
3 3 BHK+S 122.26 A0402
3 3 BHK 118.73 A0403
3 4 BHK 138.24 A0404
4 4 BHK 138.24 A0501
4 3 BHK+S 122.26 A0502
4 4 BHK 140.84 A0503
4 4 BHK 138.24 A0504
5 4 BHK 138.24 A0601
5 3 BHK+S 122.26 A0602
5 4 BHK 140.84 A0603
5 4 BHK 138.24 A0604
6 4 BHK 138.24 A0701
6 3 BHK+S 122.26 A0702
6 4 BHK 140.84 A0703
6 4 BHK 138.24 A0704
7 4 BHK 138.24 A0801
7 3 BHK+S 122.26 A0802
7 4 BHK 140.84 A0803
7 4 BHK 138.24 A0804
8 4 BHK 138.24 A0901
8 3 BHK+S 122.26 A0902
8 4 BHK 140.84 A0903
8 4 BHK 138.24 A0904
9 4 BHK 138.24 A1001
9 3 BHK+S 122.26 A1002
9 4 BHK 140.84 A1002
9 4 BHK 138.24 A1004
10 4 BHK 138.24 A1101
10 3 BHK+S 122.26 A1102
10 4 BHK 140.84 A1103
10 4 BHK 138.24 A1104
11 4 BHK 138.24 A1201
11 3 BHK+S 122.26 A1202
11 4 BHK 140.84 A1203
11 4 BHK 138.24 A1204
12 4 BHK 138.24 A1301
12 3 BHK+S 122.26 A1302
12 4 BHK 140.84 A1303
12 4 BHK 138.24 A1304
13 4 BHK 138.24 A1401
13 3 BHK+S 122.26 A1402
13 4 BHK 140.84 A1403
13 4 BHK 138.24 A1404
14 4 BHK 138.24 A1501
14 3 BHK+S 122.26 A1502
14 4 BHK 140.84 A1503
14 4 BHK 138.24 A1504
15 4 BHK 138.24 A1601
15 3 BHK+S 122.26 A1602
15 4 BHK 140.84 A1603
15 4 BHK 138.24 A1604
16 4 BHK 138.24 A1701
16 3 BHK+S 122.26 A1702
16 4 BHK 140.84 A1703
16 4 BHK 138.24 A1704
17 4 BHK 138.24 A1801
17 3 BHK+S 122.26 A1802
17 4 BHK 140.84 A1803
17 4 BHK 138.24 A1804
18 4 BHK 138.24 A1901
18 3 BHK+S 122.26 A1902
18 4 BHK 140.84 A1903
18 4 BHK 138.24 A1904
19 4 BHK 138.24 A2001
19 3 BHK+S 122.26 A2002
19 4 BHK 140.84 A2003
19 4 BHK 138.24 A2004
20 3 BHK 121.33 A2101
20 2 BHK+S 105.44 A2102
20 4 BHK 140.84 A2103
20 4 BHK 138.24 A2104
21 4 BHK 138.24 A2201
21 3 BHK+S 122.26 A2202
21 4 BHK 140.84 A2203
21 4 BHK 138.24 A2204
22 4 BHK 138.24 A2301
22 3 BHK+S 122.26 A2302
22 4 BHK 140.84 A2303
22 4 BHK 138.24 A2304
23 4 BHK 138.24 A2401
23 3 BHK+S 122.26 A2402
23 4 BHK 140.84 A2403
23 4 BHK 138.24 A2404
24 4 BHK 138.24 A2501
24 3 BHK+S 122.26 A2502
24 4 BHK 140.84 A2503
24 4 BHK 138.24 A2504
25 4 BHK 138.24 A2601
25 3 BHK+S 122.26 A2602
25 4 BHK 140.84 A2603
25 4 BHK 138.24 A2604
26 4 BHK 138.24 A2701
26 3 BHK+S 122.26 A2702
26 4 BHK 140.84 A2703
26 4 BHK 138.24 A2704
27 4 BHK 138.24 A2801
27 3 BHK+S 122.26 A2802
27 4 BHK 140.84 A2803
27 4 BHK 138.24 A2804
28 4 BHK 138.24 A2901
28 3 BHK+S 122.26 A2902
28 4 BHK 140.84 A2903
28 4 BHK 138.24 A2904
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Balance Sheet FY 24 25.Pdf
Fd 2 Balance Sheet FY 23 24.Pdf
Fd 3 Balance Sheet FY 22 23.Pdf
Fd 4 Profit And Loss FY 24 25.Pdf
Fd 5 Profit And Loss FY 23 24.Pdf
Fd 6 Profit And Loss FY 22 23.Pdf
Fd 7 Not Available.Pdf
Fd 8 MLDL ITR Ack AY 23 24.Pdf
Fd 9 MLDL ITR Ack AY 22 23.Pdf
Fd 10 Directors Report FY 24 25.Pdf
Fd 11 Directors Report FY 23 24.Pdf
Fd 12 Directors Report FY 22 23.Pdf
Fd 13 Cash Flow FY 24 25.Pdf
Fd 14 Cash Flow FY 23 24.Pdf
Fd 15 Cash Flow FY 22 23.Pdf
Fd 16 Auditors Report FY 24 25.Pdf
Fd 17 Auditors Report FY 23 24.Pdf
Fd 18 Auditors Report FY 22 23.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Photo 1 Project Photo
Photo 2 Project Photo
Od 1 HAL NOC.PDF
Od 2 Pattandur Agrahara ADLR.Pdf
Od 3 STP DETAIL DRAWINGS Signed By Engineer.Pdf
Od 4 Survey Sketch.Pdf
Od 5 Construction Cost - Mahindra Blossom.Pdf
Od 6 CLU Order.Pdf
Od 7 CDP Demarcation.Pdf
Od 8 Village Map Demarcation.Pdf
Od 9 Location Demarcation.Pdf
Od 10 NAME CHANGE (Alembic To Shreno Ltd).Pdf
Od 11 MR No 23 1988-1989.Pdf
Od 12 Affidavit - Mortgage - MLDL.Pdf
Od 13 CLU Order New.Pdf
Od 14 Clarification On Sales Mahindra Blossom.Pdf
Od 15 Title Deed.Pdf
Od 16 Sy No 149 Survey Details.Pdf
Od 17 Sy No 150 Survey Details.Pdf
Od 18 A Khata Certificate.Pdf
Od 19 Common Area Details - Mahindra Blossom.Pdf
Od 20 Carpet Area Mahindra Blossom Updated V1.Pdf
Ed 1 16-12-2025
Ed 2 16-12-2025
Ed 3 16-12-2025
Ed 4 16-12-2025
Ed 5 16-12-2025
Ed 6 16-12-2025
Ed 7 16-12-2025
Ed 8 16-12-2025
Ed 9 16-12-2025
Ed 10 16-12-2025
Ed 11 16-12-2025
Ed 12 16-12-2025
Ed 13 16-12-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank KOTAK MAHINDRA BANK
Account Number (RERA) 6311536115
IFSC KKBK0008066
Branch Address MG Road, Bengaluru
Country/City