Casagrand Flamingo RERA Details - PRM/KA/RERA/1251/310/PR/041023/006307 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Casagrand Flamingo under registration PRM/KA/RERA/1251/310/PR/041023/006307 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/041023/006307
  • Project Name CASAGRAND FLAMINGO
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 15 September 2026
  • Documents 83 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 October 2023 Expected commencement of civil works and foundation on site.
Original Completion 15 September 2026 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

CASA GRANDE GARDEN CITY BUILDERS PRIVATE LIMITED
Registered Address Salma Biz house, No.34/1, 4th Floor, Meanee Avenue Road,Opp to Lake side Hospital, Ulsoor Road, Near Ulsoor Lake ,Bengaluru South ,Bengaluru Urban-560042
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy No 50, Haralukunte Village , Begur Hobli , Bengaluru South , Bengaluru Urban, Karnataka - 560068

RERA Coordinates

Latitude, Longitude 12.901501, 77.645712
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/CC/1530/23-24
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 27 September 2023

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
CASAGRAND FLAMINGO 2 14 1 288 Residential 42.45 13 218

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
  • CASAGRAND FLAMINGO
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3BHK-3T 99.43 AG01
-1 3BHK-3T 99.43 AG02
-1 3BHK-3T 99.43 AG03
-1 3BHK-3T 99.43 AG04
-1 3BHK-3T 108.63 AG05
-1 2BHK-2T 78.67 AG06
-1 2BHK-2T 78.67 AG07
-1 3BHK-3T 108.63 AG08
-1 3BHK-3T 108.63 AG09
-1 3BHK-3T 110.55 AG11
-1 3BHK-3T 99.43 A101
-1 3BHK-3T 99.43 A102
-1 3BHK-3T 99.43 A103
GF 3BHK-3T 99.43 A104
GF 3BHK-3T 108.63 A105
GF 2BHK-2T 78.67 A106
GF 2BHK-2T 78.67 A107
GF 3BHK-3T 108.63 A108
GF 3BHK-3T 108.63 A109
GF 3BHK-3T 110.55 A111
GF 3BHK-3T 99.43 A201
GF 3BHK-3T 99.43 A202
GF 3BHK-3T 99.43 A203
GF 3BHK-3T 99.43 A204
GF 3BHK-3T 108.63 A205
GF 2BHK-2T 78.67 A206
1 2BHK-2T 78.67 A207
1 3BHK-3T 108.63 A208
1 3BHK-3T 108.63 A209
1 3BHK-3T 111.74 A210
1 3BHK-3T 110.55 A211
1 3BHK-3T 99.43 A301
1 3BHK-3T 99.43 A302
1 3BHK-3T 99.43 A303
1 3BHK-3T 99.43 A304
1 3BHK-3T 108.63 A305
1 2BHK-2T 78.67 A306
1 2BHK-2T 78.67 A307
1 3BHK-3T 108.63 A308
1 3BHK-3T 108.63 A309
1 3BHK-3T 111.74 A310
1 3BHK-3T 110.55 A311
2 3BHK-3T 99.43 A401
2 3BHK-3T 99.43 A402
2 3BHK-3T 99.43 A403
2 3BHK-3T 99.43 A404
2 3BHK-3T 108.63 A405
2 2BHK-2T 78.67 A406
2 2BHK-2T 78.67 A407
2 3BHK-3T 108.63 A408
2 3BHK-3T 108.63 A409
2 3BHK-3T 111.74 A410
2 3BHK-3T 110.55 A411
2 3BHK-3T 99.43 A501
2 3BHK-3T 99.43 A502
2 3BHK-3T 99.43 A503
2 3BHK-3T 99.43 A504
2 3BHK-3T 108.63 A505
3 2BHK-2T 78.67 A506
3 2BHK-2T 78.67 A507
3 3BHK-3T 108.63 A508
3 3BHK-3T 108.63 A509
3 3BHK-3T 111.74 A510
3 3BHK-3T 110.55 A511
3 3BHK-3T 99.43 A601
3 3BHK-3T 99.43 A602
3 3BHK-3T 99.43 A603
3 3BHK-3T 99.43 A604
3 3BHK-3T 108.63 A605
3 2BHK-2T 78.67 A606
3 2BHK-2T 78.67 A607
3 3BHK-3T 108.63 A608
3 3BHK-3T 108.63 A609
3 3BHK-3T 111.74 A610
4 3BHK-3T 110.55 A611
4 3BHK-3T 99.43 A701
4 3BHK-3T 99.43 A702
4 3BHK-3T 99.43 A703
4 3BHK-3T 99.43 A704
4 3BHK-3T 108.63 A705
4 2BHK-2T 78.67 A706
4 2BHK-2T 78.67 A707
4 3BHK-3T 108.63 A708
4 3BHK-3T 108.63 A709
4 3BHK-3T 111.74 A710
4 3BHK-3T 110.55 A711
4 3BHK-3T 99.43 A801
4 3BHK-3T 99.43 A802
4 3BHK-3T 99.43 A803
4 3BHK-3T 99.43 A804
5 3BHK-3T 108.63 A805
5 2BHK-2T 78.67 A806
5 2BHK-2T 78.67 A807
5 3BHK-3T 108.63 A808
5 3BHK-3T 108.63 A809
5 3BHK-3T 111.74 A810
5 3BHK-3T 110.55 A811
5 3BHK-3T 99.43 A901
5 3BHK-3T 99.43 A902
5 3BHK-3T 99.43 A903
5 3BHK-3T 99.43 A904
5 3BHK-3T 108.63 A905
5 2BHK-2T 78.67 A906
5 2BHK-2T 78.67 A907
5 3BHK-3T 108.63 A908
5 3BHK-3T 108.63 A909
6 3BHK-3T 111.74 A910
6 3BHK-3T 110.55 A911
6 3BHK-3T 99.43 A1001
6 3BHK-3T 99.43 A1002
6 3BHK-3T 99.43 A1003
6 3BHK-3T 99.43 A1004
6 3BHK-3T 108.63 A1005
6 2BHK-2T 78.67 A1006
6 2BHK-2T 78.67 A1007
6 3BHK-3T 108.63 A1008
6 3BHK-3T 108.63 A1009
6 3BHK-3T 111.74 A1010
6 3BHK-3T 110.55 A1011
6 3BHK-3T 99.43 A1101
6 3BHK-3T 99.43 A1102
6 3BHK-3T 99.43 A1103
7 3BHK-3T 99.43 A1104
7 3BHK-3T 108.63 A1105
7 2BHK-2T 78.67 A1106
7 2BHK-2T 78.67 A1107
7 3BHK-3T 108.63 A1108
7 3BHK-3T 108.63 A1109
7 3BHK-3T 111.74 A1110
7 3BHK-3T 110.55 A1111
7 3BHK-3T 99.43 A1201
7 3BHK-3T 99.43 A1202
7 3BHK-3T 99.43 A1203
7 3BHK-3T 99.43 A1204
7 3BHK-3T 108.63 A1205
7 2BHK-2T 78.67 A1206
7 2BHK-2T 78.67 A1207
7 3BHK-3T 108.63 A1208
8 3BHK-3T 108.63 A1209
8 3BHK-3T 111.74 A1210
8 3BHK-3T 110.55 A1211
8 3BHK-3T 99.43 A1301
8 3BHK-3T 99.43 A1302
8 3BHK-3T 99.43 A1303
8 3BHK-3T 99.43 A1304
8 3BHK-3T 108.63 A1305
8 2BHK-2T 78.67 A1306
8 2BHK-2T 78.67 A1307
8 3BHK-3T 108.63 A1308
8 3BHK-3T 108.63 A1309
8 3BHK-3T 111.74 A1310
8 3BHK-3T 110.55 A1311
8 4BHK-4T 144.47 BG01
8 3BHK-3T 99.43 BG02
9 4BHK-4T 142.55 BG03
9 4BHK-4T 144.47 B101
9 3BHK-3T 99.43 B102
9 4BHK-4T 142.55 B103
9 4BHK-4T 144.47 B201
9 3BHK-3T 99.43 B202
9 4BHK-4T 142.55 B203
9 3BHK-3T 119.64 B204
9 3BHK-3T 117.16 B205
9 4BHK-4T 144.47 B301
9 3BHK-3T 99.43 B302
9 4BHK-4T 142.55 B303
9 3BHK-3T 119.64 B304
9 3BHK-3T 117.16 B305
9 4BHK-4T 144.47 B401
9 3BHK-3T 99.43 B402
10 4BHK-4T 142.55 B403
10 3BHK-3T 119.64 B404
10 3BHK-3T 117.16 B405
10 4BHK-4T 144.47 B501
10 3BHK-3T 99.43 B502
10 4BHK-4T 142.55 B503
10 3BHK-3T 119.64 B504
10 3BHK-3T 117.16 B505
10 4BHK-4T 144.47 B601
10 3BHK-3T 99.43 B602
10 4BHK-4T 142.55 B603
10 3BHK-3T 119.64 B604
10 3BHK-3T 117.16 B605
10 4BHK-4T 144.47 B701
10 3BHK-3T 99.43 B702
10 4BHK-4T 142.55 B703
11 3BHK-3T 119.64 B704
11 3BHK-3T 117.16 B705
11 4BHK-4T 144.47 B801
11 3BHK-3T 99.43 B802
11 4BHK-4T 142.55 B803
11 3BHK-3T 119.64 B804
11 3BHK-3T 117.16 B805
11 4BHK-4T 144.47 B901
11 3BHK-3T 99.43 B902
11 4BHK-4T 142.55 B903
11 3BHK-3T 119.64 B904
11 3BHK-3T 117.16 B905
11 4BHK-4T 144.47 B1001
11 3BHK-3T 99.43 B1002
11 4BHK-4T 142.55 B1003
11 3BHK-3T 119.64 B1004
12 3BHK-3T 117.16 B1005
12 4BHK-4T 144.47 B1101
12 3BHK-3T 99.43 B1102
12 4BHK-4T 142.55 B1103
12 3BHK-3T 119.64 B1104
12 3BHK-3T 117.16 B1105
12 4BHK-4T 144.47 B1201
12 3BHK-3T 99.43 B1202
12 4BHK-4T 142.55 B1203
12 3BHK-3T 119.64 B1204
12 3BHK-3T 117.16 B1205
12 4BHK-4T 144.47 B1301
12 3BHK-3T 99.43 B1302
12 4BHK-4T 142.55 B1303
12 3BHK-3T 119.64 B1304
12 3BHK-3T 117.16 B1305
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Common Areas Lifts % not reported Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported
Sub Structure Upto Plinth Level % not reported Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported
Sup Structure Rcc Or Ms Framed Structure % not reported Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported
Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported
Sup Structure Railing And Grill Fixing % not reported Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported
Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported
Finishing Works Elevation Work % not reported Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported
Internal Infrastructure Sewage And Drainage System % not reported Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported
Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported
External Infrastructure Water Supply % not reported External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported
External Infrastructure Electricity Supply Transformer And Substation % not reported External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported
External Infrastructure Storm Water Drains % not reported External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported
External Infrastructure Fire Protection And Fire Safety Requirements % not reported External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported
External Infrastructure Street Lighting % not reported Amenities Electricity % not reported Amenities Smart Home Automation % not reported
Amenities Cctv Surveillance % not reported Amenities Club House % not reported Amenities Community Hall % not reported
Amenities Outdoor Sports Facility % not reported Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported
Amenities Gym % not reported Amenities Parks % not reported Amenities Power Backup % not reported
Amenities Piped Gas % not reported Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported
Common Areas Staircases % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Blalance Sheet 2021-22.Pdf
Fd 2 Balance Sheet 2020-21.Pdf
Fd 3 Balance Sheet 2019-20.Pdf
Fd 4 Profit And Loss 2021-22.Pdf
Fd 5 Profit And Loss 2020-21.Pdf
Fd 6 Profit And Loss 2019-20.Pdf
Fd 7 Directors Report 2021-22.Pdf
Fd 8 Financials 2020-21.Pdf
Fd 9 Director'S Report 2019-20.Pdf
Fd 10 Cashflow Statement 2021-22.Pdf
Fd 11 Cashflow Statement 2020-21.Pdf
Fd 12 Cash Flow 2019-20.Pdf
Fd 13 Audit Report For March 22.Pdf
Fd 14 Audit Report 2020-21.Pdf
Fd 15 Auditor'S Report 2019-20.Pdf
Fd 16 ITR ACK 2021-22.Pdf
Fd 17 ITR For 2020-21.Pdf
Fd 18 ITR For 2019-20.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 7 KSPCB( Annexure - 99 )
Noc 9 BSNL( Annexure - 101 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 HSR Guideline Value.Pdf
Od 2 HSR - AAI NOC.Pdf
Od 3 HSR - Single Plot Sketch.Pdf
Od 4 MOEF NOC With Fee Paid Receipt.Pdf
Od 5 CDP Master Extract.Pdf
Od 6 HSR - Single Plot BDA Approved Copy.Pdf
Od 7 Location Demarcation.Pdf
Od 8 Village Map Demarcation.Pdf
Od 9 HSR STP DEMARCATION.PDF
Od 10 Sl No 44 - Tippany.Pdf
Od 11 Sl No 46-Akarband.Pdf
Od 12 Sl No 7 Sale Deed - BNG(U)-BLR(S) 8302 Of 2002-2003.Pdf
Od 13 Sl No 8 - MR -17-02-03.Pdf
Od 14 Sl No 10 -MR No-12-2003-04.Pdf
Od 15 Sl No 11 - Rectification Deed BAS-1-12098 Of 2004-05.Pdf
Od 16 Sl No 12-Confirmation Deed BTM-1-02478 Of 2021-22.Pdf
Od 17 STP Design.Pdf
Od 18 FLAMINGO- Const Cost Break Up.Pdf
Od 19 Zonal Copy Nala Buffer.Pdf
Od 20 Bandi Daari Shifting Document.Pdf
Od 21 Financials Provisional 2022-23.Pdf
Od 22 FLAMINGO -Amenities.Pdf
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 57500001173658
IFSC HDFC0001268
Branch Address EMPIRE INFANTRY ROAD
Country/City