Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

SSVD Serenity RERA Details - PRM/KA/RERA/1251/446/PR/130625/007829 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for SSVD Serenity under registration PRM/KA/RERA/1251/446/PR/130625/007829 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/130625/007829
  • Project Name SSVD SERENITY
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 30 June 2029
  • Documents 38 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 06 June 2025 Expected commencement of civil works and foundation on site.
Original Completion 30 June 2029 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

SRI SAI VENKATESHWARA DEVELOPERS
Registered Address No. 182, 5th Main Road, Nandha Kumar Layout,Arehalli, Uttarahalli, Near Ramdev Medicals ,Bengaluru South ,Bengaluru Urban-560061
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy. No. 100, Khata No. 1188/100, Seeghehalli Village , Bidarahalli Hobli , Bengaluru East , Bengaluru Urban, Karnataka - 560049

RERA Coordinates

Latitude, Longitude 13.009322, 77.759488
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BDA/EAST/49/2024-25
Authority BDA - Bangalore Development Authority
Approved Date 15 January 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
SSVD SERENITY 1 6 0 62 Residential 14.98 5 56

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • SSVD SERENITY
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 95.69 001
GF 2 BHK 67.63 002
GF 3 BHK 95.69 003
GF 3 BHK 95.69 004
GF 3 BHK 83.15 005
GF 3 BHK 90.58 006
GF 3 BHK 86.58 007
GF 2 BHK 80.45 008
1 3 BHK 95.69 101
1 2 BHK 67.63 102
1 3 BHK 95.69 103
1 3 BHK 95.69 104
1 2 BHK 67.63 105
1 3 BHK 95.69 106
1 3 BHK 89.46 107
1 2 BHK 63.45 108
1 3 BHK 83.15 109
1 3 BHK 90.58 110
1 3 BHK 90.58 111
1 3 BHK 88.91 112
2 3 BHK 95.69 201
2 2 BHK 67.63 202
2 3 BHK 95.69 203
2 3 BHK 95.69 204
2 2 BHK 67.63 205
2 3 BHK 95.69 206
2 3 BHK 89.46 207
2 2 BHK 63.45 208
2 3 BHK 83.15 209
2 3 BHK 90.58 210
2 3 BHK 90.58 211
2 3 BHK 88.91 212
3 3 BHK 95.69 301
3 2 BHK 67.63 302
3 3 BHK 95.69 303
3 3 BHK 95.69 304
3 2 BHK 67.63 305
3 3 BHK 95.69 306
3 3 BHK 89.46 307
3 2 BHK 63.45 308
3 3 BHK 83.15 309
3 3 BHK 90.58 310
3 3 BHK 90.58 311
3 3 BHK 88.91 312
4 3 BHK 95.69 401
4 2 BHK 67.63 402
4 3 BHK 95.69 403
4 3 BHK 95.69 404
4 2 BHK 67.63 405
4 3 BHK 95.69 406
4 3 BHK 89.46 407
4 2 BHK 63.45 408
4 3 BHK 83.15 409
4 3 BHK 90.58 410
4 3 BHK 90.58 411
4 3 BHK 88.91 412
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 ITR 23-24.Pdf
Fd 2 ITR 22-23.Pdf
Fd 3 ITR 21-22.Pdf
Fd 4 ITR 23-24.Pdf
Fd 5 ITR 22-23.Pdf
Fd 6 ITR 21-22.Pdf
Fd 7 ITR ACK.Pdf
Fd 8 ITR ACK.Pdf
Fd 9 ITR ACK.Pdf
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Noc 3 KSPCB( Annexure - 97 )
Photo 1 Project Photo
Od 1 Esitmation Sheet.Pdf
Od 2 Village MAP.Pdf
Od 3 STP Drawing - Certified By Eng.Pdf
Ed 1 31-05-2025
Ed 2 31-05-2025
Ed 3 31-05-2025
Ed 4 31-05-2025
Ed 5 31-05-2025
Ed 6 31-05-2025
Ed 7 31-05-2025
Ed 8 31-05-2025
Ed 9 31-05-2025
Ed 10 31-05-2025
Ed 11 31-05-2025
Ed 12 31-05-2025
Ed 13 31-05-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank STATE BANK OF INDIA
Account Number (RERA) 44025549342
IFSC SBIN0016222
Branch Address Girinagara 3rd Phase, Bengaluru
Country/City