Vikyath Signature RERA Details - PRM/KA/RERA/1251/446/PR/060324/006674 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Vikyath Signature under registration PRM/KA/RERA/1251/446/PR/060324/006674 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/060324/006674
  • Project Name VIKYATH SIGNATURE
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 31 December 2030
  • Documents 104 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 25 December 2023 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2030 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

VIKYATH PROPERTIES PVT LTD
Registered Address SNO 151,152, KNO 25/1, N0 2, VIKYATH IRIS BUILDING,BASAVANAPURA,, K R PURAM, Bengaluru ,Bengaluru East ,Bengaluru Urban-560036
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Survey No. 26/1 and 26/2 , Situated at Kurudu Sonnenahalli Village,Bidarahalli Hobli,Bangalore Taluk , Bengaluru East , Bengaluru Urban, Karnataka - 560049

RERA Coordinates

Latitude, Longitude 13.013515, 77.732875
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. 37/2023-24
Authority BDA - Bangalore Development Authority
Approved Date 24 November 2023

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
TOWER--A 1 9 0 140 Residential 23.99 7 140
TOWER-B 1 9 0 175 Residential 23.99 7 175

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • TOWER--A
  • TOWER-B
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 97.18 A101
GF 3 BHK 85.38 A102
GF 3 BHK 85.38 A103
GF 3 BHK 85.38 A104
GF 3 BHK 91.24 A105
GF 3 BHK 97.56 A106
GF 2 BHK 62.99 A107
GF 2 BHK 70.57 A108
GF 2 BHK 70.57 A109
GF 3 BHK 94.95 A110
GF 2 BHK 68.58 A111
GF 2 BHK 72.03 A112
GF 2 BHK 72.03 A113
GF 2 BHK 68.66 A114
GF 3 BHK 91.24 A115
GF 3 BHK 97.56 A116
GF 3 BHK 86.16 A117
GF 3 BHK 86.16 A118
GF 3 BHK 86.16 A119
GF 3 BHK 94.95 A120
1 3 BHK 97.18 A201
1 3 BHK 85.38 A202
1 3 BHK 85.38 A203
1 3 BHK 85.38 A204
1 3 BHK 91.24 A205
1 3 BHK 97.56 A206
1 2 BHK 62.99 A207
1 2 BHK 70.57 A208
1 2 BHK 70.57 A209
1 3 BHK 94.95 A210
1 2 BHK 68.58 A211
1 2 BHK 72.03 A212
1 2 BHK 72.03 A213
1 2 BHK 68.66 A214
1 3 BHK 91.24 A215
1 3 BHK 97.56 A216
1 3 BHK 86.16 A217
1 3 BHK 86.16 A218
1 3 BHK 86.16 A219
1 3 BHK 94.95 A220
2 3 BHK 97.18 A301
2 3 BHK 85.38 A302
2 3 BHK 85.38 A303
2 3 BHK 85.38 A304
2 3 BHK 91.24 A305
2 3 BHK 97.56 A306
2 2 BHK 62.99 A307
2 2 BHK 70.57 A308
2 2 BHK 70.57 A309
2 3 BHK 94.95 A310
2 2 BHK 68.58 A311
2 2 BHK 72.03 A312
2 2 BHK 72.03 A313
2 2 BHK 68.66 A314
2 3 BHK 91.24 A315
2 3 BHK 97.56 A316
2 3 BHK 86.16 A317
2 3 BHK 86.16 A318
2 3 BHK 86.16 A319
2 3 BHK 94.95 A320
3 3 BHK 97.18 A401
3 3 BHK 85.38 A402
3 3 BHK 85.38 A403
3 3 BHK 85.38 A404
3 3 BHK 91.24 A405
3 3 BHK 97.56 A406
3 2 BHK 62.99 A407
3 2 BHK 70.57 A408
3 2 BHK 70.57 A409
3 3 BHK 94.95 A410
3 2 BHK 68.58 A411
3 2 BHK 72.03 A412
3 2 BHK 72.03 A413
3 2 BHK 68.66 A414
3 3 BHK 91.24 A415
3 3 BHK 97.56 A416
3 3 BHK 86.16 A417
3 3 BHK 86.16 A418
3 3 BHK 86.16 A419
3 3 BHK 94.95 A420
4 3 BHK 97.18 A501
4 3 BHK 85.38 A502
4 3 BHK 85.38 A503
4 3 BHK 85.38 A504
4 3 BHK 91.24 A505
4 3 BHK 97.56 A506
4 2 BHK 62.99 A507
4 2 BHK 70.57 A508
4 2 BHK 70.57 A509
4 3 BHK 94.95 A510
4 2 BHK 68.58 A511
4 2 BHK 72.03 A512
4 2 BHK 72.03 A513
4 2 BHK 68.66 A514
4 3 BHK 91.24 A515
4 3 BHK 97.56 A516
4 3 BHK 86.16 A517
4 3 BHK 86.16 A518
4 3 BHK 86.16 A519
4 3 BHK 94.95 A520
5 3 BHK 97.18 A601
5 3 BHK 85.38 A602
5 3 BHK 85.38 A603
5 3 BHK 85.38 A604
5 3 BHK 91.24 A605
5 3 BHK 97.56 A606
5 2 BHK 62.99 A607
5 2 BHK 70.57 A608
5 2 BHK 70.57 A609
5 3 BHK 94.95 A610
5 2 BHK 68.58 A611
5 2 BHK 72.03 A612
5 2 BHK 72.03 A613
5 2 BHK 68.66 A614
5 3 BHK 91.24 A615
5 3 BHK 97.56 A616
5 3 BHK 86.16 A617
5 3 BHK 86.16 A618
5 3 BHK 86.16 A619
5 3 BHK 94.95 A620
6 3 BHK 97.18 A701
6 3 BHK 85.38 A702
6 3 BHK 85.38 A703
6 3 BHK 85.38 A704
6 3 BHK 91.24 A705
6 3 BHK 97.56 A706
6 2 BHK 62.99 A707
6 2 BHK 70.57 A708
6 2 BHK 70.57 A709
6 3 BHK 94.95 A710
6 2 BHK 68.58 A711
6 2 BHK 72.03 A712
6 2 BHK 72.03 A713
6 2 BHK 68.66 A714
6 3 BHK 91.24 A715
6 3 BHK 97.56 A716
6 3 BHK 86.16 A717
6 3 BHK 86.16 A718
6 3 BHK 86.16 A719
6 3 BHK 94.95 A720
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Balance Sheet 23-24.Pdf
Fd 2 Balancesheet 22-23.Pdf
Fd 3 BALANCESHEET 21-22.Pdf
Fd 4 Profit And Loss 23-24.Pdf
Fd 5 Profit And Loss 22-23.Pdf
Fd 6 PROFIT And LOSS 21-22.Pdf
Fd 7 Audit Report 23-24.Pdf
Fd 8 Auditor Report 22-23.Pdf
Fd 9 Audit Report 21-22.Pdf
Fd 10 Audit Report 23-24.Pdf
Fd 11 Auditor Report 22-23.Pdf
Fd 12 Audit Report 21-22.Pdf
Fd 13 Audit Report 23-24.Pdf
Fd 14 Auditor Report 22-23.Pdf
Fd 15 Audit Report 21-22.Pdf
Fd 16 ITR 23-24.Pdf
Fd 17 ITR 22-23.Pdf
Fd 18 ITR 21-22.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 8 SEIAA( Annexure - 100 )
Photo 1 Project Photo
Od 1 Akarband.Pdf
Od 2 Acre Guidance Value .Pdf
Od 3 Hissa Pody Copy.Pdf
Od 4 JDA.Pdf
Od 5 Sy No 26 GPA .Pdf
Od 6 COMPLETE RTC.Pdf
Od 7 Elevation.Pdf
Od 8 FLOOR PLAN.Pdf
Od 9 Ground Floor Plan.Pdf
Od 10 WORK ORDER.Pdf
Od 11 Terrace Floor Plan.Pdf
Od 12 Stabilitiy Certificate.Pdf
Od 13 Thamaiah To Muddamma Sale Deed .Pdf
Od 14 Village Map Marked.Jpeg
Od 15 Latitude And Longitude.Jpeg
Od 16 REMMITENCE CHALLAN (1).Pdf
Od 17 All Title Deed).Pdf
Ed 1 03-02-2024
Ed 2 03-02-2024
Ed 3 03-02-2024
Ed 4 03-02-2024
Ed 5 03-02-2024
Ed 6 03-02-2024
Ed 7 03-02-2024
Ed 8 03-02-2024
Ed 9 03-02-2024
Ed 10 03-02-2024
Ed 11 03-02-2024
Ed 12 03-02-2024
Ed 13 03-02-2024
Ed 14 03-02-2024
Ed 15 03-02-2024
Ed 16 03-02-2024
Ed 17 03-02-2024
Ed 18 03-02-2024
Ed 19 03-02-2024
Ed 20 03-02-2024
Ed 21 03-02-2024
Ed 22 03-02-2024
Ed 23 03-02-2024
Ed 24 03-02-2024
Ed 25 21-02-2024
Ed 26 21-02-2024
Ed 27 21-02-2024
Ed 28 21-02-2024
Ed 29 21-02-2024
Ed 30 21-02-2024
Ed 31 21-02-2024
Ed 32 21-02-2024
Ed 33 21-02-2024
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Axis Bank
Account Number (RERA) 924020009016960
IFSC UTIB0003665
Branch Address Ayyapa Nagar
Country/City