residential New Launch Source: rera.ka

Sumadhura Elysium RERA Details - PRM/KA/RERA/1251/446/PR/220526/008677 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sumadhura Elysium under registration PRM/KA/RERA/1251/446/PR/220526/008677 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/220526/008677
  • Project Name Sumadhura Elysium Phase-I
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 31 December 2029
  • Documents 93 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 April 2026 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2029 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

SUMADHURA BUILDWELL PRIVATE LIMITED
Registered Address Sy No 14 & 158 ,Pattandur Agrahara Village KR Puram Hobli ,Bengaluru East ,Bengaluru Urban-560066
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address 55/1(P),55/2A1(P),55/2A2,55/2C(P),56/1,57/5,58(P),59/2A(P),59/3A,60/1C, 110(P), , PANATHUR VILLAGE VARTHUR HOBLI , Bengaluru East , Bengaluru Urban, Karnataka - 560087

RERA Coordinates

Latitude, Longitude 12.928718383177406, 77.71169455112364
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. GBA/BECC/0004/25-26
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 24 February 2026

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
LYRA (WING-E) 2 19 0 224 Residential 57.6 18 112
LYRA (WING-F) 2 18 0 228 Residential 57.6 18 114
LYRA (WING-G) 2 19 0 186 Residential 57.6 18 93

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
3 BHK 0 units
4 BHK 0 units
  • LYRA (WING-E)
  • LYRA (WING-F)
  • LYRA (WING-G)
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 Regal 3 BHK 113.34 E-001
-1 Regal 3 BHK 118.64 E-002
-1 Elite 4 BHK 135.82 E-003
-1 Elite 3 BHK 111.20 E-004
-1 Regal 3 BHK 117.34 E-005
GF Regal 3 BHK 113.34 E-101
GF Regal 3 BHK 118.64 E-102
GF Elite 4 BHK 135.82 E-103
GF Elite 3 BHK 111.20 E-104
GF Regal 3 BHK 117.34 E-105
1 Regal 3 BHK 113.34 E-201
1 Regal 3 BHK 118.64 E-202
1 Elite 4 BHK 135.82 E-203
1 Elite 3 BHK 111.20 E-204
1 Regal 3 BHK 117.34 E-205
1 Elite 3 BHK 111.20 E-206
2 Regal 3 BHK 113.34 E-301
2 Regal 3 BHK 118.64 E-302
2 Elite 4 BHK 135.82 E-303
2 Elite 3 BHK 111.20 E-304
2 Regal 3 BHK 117.34 E-305
2 Elite 3 BHK 111.20 E-306
3 Regal 3 BHK 113.34 E-401
3 Regal 3 BHK 118.64 E-402
3 Elite 4 BHK 135.82 E-403
3 Elite 3 BHK 111.20 E-404
3 Regal 3 BHK 117.34 E-405
3 Elite 3 BHK 111.20 E-406
4 Regal 3 BHK 113.34 E-501
4 Regal 3 BHK 118.64 E-502
4 Elite 4 BHK 135.82 E-503
4 Elite 3 BHK 111.20 E-504
4 Regal 3 BHK 117.34 E-505
4 Elite 3 BHK 111.20 E-506
5 Regal 3 BHK 113.34 E-601
5 Regal 3 BHK 118.64 E-602
5 Elite 4 BHK 135.82 E-603
5 Elite 3 BHK 111.20 E-604
5 Regal 3 BHK 117.34 E-605
5 Elite 3 BHK 111.20 E-606
6 Regal 3 BHK 113.34 E-701
6 Regal 3 BHK 118.64 E-702
6 Elite 4 BHK 135.82 E-703
6 Elite 3 BHK 111.20 E-704
6 Regal 3 BHK 117.34 E-705
6 Elite 3 BHK 111.20 E-706
7 Regal 3 BHK 113.34 E-801
7 Regal 3 BHK 118.64 E-802
7 Elite 4 BHK 135.82 E-803
7 Elite 3 BHK 111.20 E-804
7 Regal 3 BHK 117.34 E-805
7 Elite 3 BHK 111.20 E-806
8 Regal 3 BHK 113.34 E-901
8 Regal 3 BHK 118.64 E-902
8 Elite 4 BHK 135.82 E-903
8 Elite 3 BHK 111.20 E-904
8 Regal 3 BHK 117.34 E-905
8 Elite 3 BHK 111.20 E-906
9 Regal 3 BHK 113.34 E-1001
9 Regal 3 BHK 118.64 E-1002
9 Elite 4 BHK 135.82 E-1003
9 Elite 3 BHK 111.20 E-1004
9 Regal 3 BHK 117.34 E-1005
9 Elite 3 BHK 111.20 E-1006
10 Regal 3 BHK 113.34 E-1101
10 Regal 3 BHK 118.64 E-1102
10 Elite 4 BHK 135.82 E-1103
10 Elite 3 BHK 111.20 E-1104
10 Regal 3 BHK 117.34 E-1105
10 Elite 3 BHK 111.20 E-1106
11 Regal 3 BHK 113.34 E-1201
11 Regal 3 BHK 118.64 E-1202
11 Elite 4 BHK 135.82 E-1203
11 Elite 3 BHK 111.20 E-1204
11 Regal 3 BHK 117.34 E-1205
11 Elite 3 BHK 111.20 E-1206
12 Regal 3 BHK 113.34 E-1301
12 Regal 3 BHK 118.64 E-1302
12 Elite 4 BHK 135.82 E-1303
12 Elite 3 BHK 111.20 E-1304
12 Regal 3 BHK 117.34 E-1305
12 Elite 3 BHK 111.20 E-1306
13 Regal 3 BHK 113.34 E-1401
13 Regal 3 BHK 118.64 E-1402
13 Elite 4 BHK 135.82 E-1403
13 Elite 3 BHK 111.20 E-1404
13 Regal 3 BHK 117.34 E-1405
13 Elite 3 BHK 111.20 E-1406
14 Regal 3 BHK 113.34 E-1501
14 Regal 3 BHK 118.64 E-1502
14 Elite 4 BHK 135.82 E-1503
14 Elite 3 BHK 111.20 E-1504
14 Regal 3 BHK 117.34 E-1505
14 Elite 3 BHK 111.20 E-1506
15 Regal 3 BHK 113.34 E-1601
15 Regal 3 BHK 118.64 E-1602
15 Elite 4 BHK 135.82 E-1603
15 Elite 3 BHK 111.20 E-1604
15 Regal 3 BHK 117.34 E-1605
15 Elite 3 BHK 111.20 E-1606
16 Regal 3 BHK 113.34 E-1701
16 Regal 3 BHK 118.64 E-1702
16 Elite 4 BHK 135.82 E-1703
16 Elite 3 BHK 111.20 E-1704
16 Regal 3 BHK 117.34 E-1705
16 Elite 3 BHK 111.20 E-1706
17 Regal 3 BHK 113.34 E-1801
17 Regal 3 BHK 118.64 E-1802
17 Elite 4 BHK 135.82 E-1803
17 Elite 3 BHK 111.20 E-1804
17 Regal 3 BHK 117.34 E-1805
17 Elite 3 BHK 111.20 E-1806
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 BS FY 2024-25 SBPL.Pdf
Fd 2 BS FY 2023-24 SBPL.Pdf
Fd 3 NOT APPLICABLE.Pdf
Fd 4 P&L FY 2024-25 SBPL.Pdf
Fd 5 P&L FY 2023-24 SBPL.Pdf
Fd 6 NOT APPLICABLE.Pdf
Fd 7 IT ACK 2024-25 SBPL.Pdf
Fd 8 IT Ack FY 2023-24 SBPL.Pdf
Fd 9 NOT APPLICABLE.Pdf
Fd 10 NOT APPLICABLE.Pdf
Fd 11 NOT APPLICABLE.Pdf
Fd 12 NOT APPLICABLE.Pdf
Fd 13 Cash Flow 2024-25.Pdf
Fd 14 Cash Flow 2023-24.Pdf
Fd 15 NOT APPLICABLE.Pdf
Fd 16 Audit Report 2024-25 -.Pdf
Fd 17 Audit Report - FY 23-24.Pdf
Fd 18 NOT APPLICABLE.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Od 1 Demarked Site Location In CDP Map.Pdf
Od 2 Demarked Site Location In Google Map.Pdf
Od 3 Demarked Site Location In Village Map.Pdf
Od 4 Aminities & Common Area Detail Certified By Engineer.Pdf
Od 5 Estimated Cost Of Construction Certified By The Engineer-Elysium.Pdf
Od 6 Land Cost Calculation Sheet As Per The Guidance Value(Self-Attested Copy) Elysium 0001.Pdf
Od 7 STP Drawing As Per KSPCB Norms Certified By Engineer.Pdf
Od 8 DP Approved Plan Elysium.Pdf
Od 9 NOC DP Work Order Elysium.Pdf
Od 10 01 Site Plan-Elysium.Pdf
Od 11 02 GF (Kyra&Lyra) Plan-Elysium.Pdf
Od 12 03 1st BF Plan-Elysium.Pdf
Od 13 04 2nd BF Plan-Elysium.Pdf
Od 14 05 GF &1st F Plan LYRA (Wing-E)-Elysium.Pdf
Od 15 06 2nd To18th And Terrace Floor Plan LYRA (Wing-E)-Elysium.Pdf
Od 16 07 GF &1st F Plan LYRA (Wing-F)-Elysium.Pdf
Od 17 08 2nd To18th And Terrace Floor Plan LYRA (Wing-F)-Elysium.Pdf
Od 18 09 GF &1st F Plan LYRA (Wing-G)-Elysium.Pdf
Od 19 10 2nd To18th And Terrace Floor Plan LYRA (Wing-G)-Elysium.Pdf
Od 20 11 Section & Elevation Tower-LYRA-Elysium.Pdf
Od 21 Certificate Reg CE Eng Self Attested.Pdf
Od 22 Aadhar Chartered Engineer.Pdf
Od 23 SALE DEED - 1236-2023-24 55-2A1,55-2C,55-2A2.Pdf
Od 24 SALE DEED 3443-2006-07 59-2A.Pdf
Od 25 SALE DEED 3457-2006 59-2A.Pdf
Od 26 SALE DEED 7833-2005-06 55-2A1 & 55-2C.Pdf
Od 27 SALE DEED 10092-2006-07 59-3A.Pdf
Od 28 SALE DEED 18590-2006-07 55-1.Pdf
Od 29 SALE DEED 19724-2005-06 58.Pdf
Od 30 Sale Deed No1235-23-24 110.Pdf
Od 31 Bifercation Details Elysium.Pdf
Ed 1 15-05-2026
Ed 2 15-05-2026
Ed 3 15-05-2026
Ed 4 15-05-2026
Ed 5 15-05-2026
Ed 6 15-05-2026
Ed 7 15-05-2026
Ed 8 15-05-2026
Ed 9 15-05-2026
Ed 10 15-05-2026
Ed 11 15-05-2026
Ed 12 15-05-2026
Ed 13 15-05-2026
Ed 14 15-05-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank KOTAK MAHINDRA BANK
Account Number (RERA) 8947712017
IFSC KKBK0000422
Branch Address Lavelle Road Bangalore
Country/City