Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

SM Art Apartments RERA Details - PRM/KA/RERA/1251/446/PR/290722/005113 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for SM Art Apartments under registration PRM/KA/RERA/1251/446/PR/290722/005113 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/290722/005113
  • Project Name SM ART
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 15 December 2026
  • Documents 92 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 20 May 2022 Expected commencement of civil works and foundation on site.
Original Completion 15 December 2026 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

S & M DEVELOPERS
Registered Address SY NO- 47\1,47\4, 49\6 & 49\8 NEAR SOBHA DREAM ACRES, ,BALAGERE MAIN ROAD,BALAGERE VILLAGE, VARTHUR HOBLIE,BANGALORE-560087 ,Bengaluru East ,Bengaluru Urban-560087
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address SY NO- 47\1,47\4, 49\6 & 49\8,NEAR SOBHA DREAM ACRES , BALAGERE MAIN ROAD,BALAGERE VILLAGE VARTHUR HOBLIE , Bengaluru East , Bengaluru Urban, Karnataka - 560087

RERA Coordinates

Latitude, Longitude 12.936414, 77.724353
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Addl.Dir/JDNORTH/0070/21-22
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 11 May 2022

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
SM ART A 0 23 1 139 Residential 22.0 21 126
SM ART B 1 23 0 186 Residential 22.0 21 168

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
  • SM ART A
  • SM ART B
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 2 BHK 903 101
GF 3 BHK 960 102
GF 3 BHK 967 103
GF 2 BHK 872 104
GF 2 BHK 853 105
GF 3 BHK 984 106
1 2 BHK 903 201
1 3 BHK 960 202
1 3 BHK 967 203
1 2 BHK 872 204
1 2 BHK 853 205
1 3 BHK 984 206
2 2 BHK 903 301
2 3 BHK 960 302
2 3 BHK 967 303
2 2 BHK 872 304
2 2 BHK 853 305
2 3 BHK 984 306
3 2 BHK 903 401
3 3 BHK 960 402
3 3 BHK 967 403
3 2 BHK 872 404
3 2 BHK 853 405
3 3 BHK 984 406
4 2 BHK 903 501
4 3 BHK 960 502
4 3 BHK 967 503
4 2 BHK 872 504
4 2 BHK 853 505
4 3 BHK 984 506
5 2 BHK 903 601
5 3 BHK 960 602
5 3 BHK 967 603
5 2 BHK 872 604
5 2 BHK 853 605
5 3 BHK 984 606
6 2 BHK 903 701
6 3 BHK 960 702
6 3 BHK 967 703
6 2 BHK 872 704
6 2 BHK 853 705
6 3 BHK 984 706
7 2 BHK 903 801
7 3 BHK 960 802
7 3 BHK 967 803
7 2 BHK 872 804
7 2 BHK 853 805
7 3 BHK 984 806
8 2 BHK 903 901
8 3 BHK 960 902
8 3 BHK 967 903
8 2 BHK 872 904
8 2 BHK 853 905
8 3 BHK 984 906
9 2 BHK 903 1001
9 3 BHK 960 1002
9 3 BHK 967 1003
9 2 BHK 872 1004
9 2 BHK 853 1005
9 3 BHK 984 1006
10 2 BHK 903 1101
10 3 BHK 960 1102
10 3 BHK 967 1103
10 2 BHK 872 1104
10 2 BHK 853 1105
10 3 BHK 984 1106
11 2 BHK 903 1201
11 3 BHK 960 1202
11 3 BHK 967 1203
11 2 BHK 872 1204
11 2 BHK 853 1205
11 3 BHK 984 1206
12 2 BHK 903 1301
12 3 BHK 960 1302
12 3 BHK 967 1303
12 2 BHK 872 1304
12 2 BHK 853 1305
12 3 BHK 984 1306
13 2 BHK 903 1401
13 3 BHK 960 1402
13 3 BHK 967 1403
13 2 BHK 872 1404
13 2 BHK 853 1405
13 3 BHK 984 1406
14 2 BHK 903 1501
14 3 BHK 960 1502
14 3 BHK 967 1503
14 2 BHK 872 1504
14 2 BHK 853 1505
14 3 BHK 984 1506
15 2 BHK 903 1601
15 3 BHK 960 1602
15 3 BHK 967 1603
15 2 BHK 872 1604
15 2 BHK 853 1605
15 3 BHK 984 1606
16 2 BHK 903 1701
16 3 BHK 960 1702
16 3 BHK 967 1703
16 2 BHK 872 1704
16 2 BHK 853 1705
16 3 BHK 984 1706
17 2 BHK 903 1801
17 3 BHK 960 1802
17 3 BHK 967 1803
17 2 BHK 872 1804
17 2 BHK 853 1805
17 3 BHK 984 1806
18 2 BHK 903 1901
18 3 BHK 960 1902
18 3 BHK 967 1903
18 2 BHK 872 1904
18 1 BHK 491 1905
18 3 BHK 984 1906
19 2 BHK 903 2001
19 3 BHK 960 2002
19 3 BHK 967 2003
19 2 BHK 872 2004
19 2 BHK 853 2005
19 3 BHK 984 2006
20 2 BHK 903 2101
20 3 BHK 960 2102
20 3 BHK 967 2103
20 2 BHK 872 2104
20 2 BHK 853 2105
20 3 BHK 984 2106
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Infrastructure Energy Management % not reported Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported
Sub Structure Upto Plinth Level % not reported Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported
Sup Structure Rcc Or Ms Framed Structure % not reported Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported
Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported
Sup Structure Railing And Grill Fixing % not reported Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported
Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported
Finishing Works Elevation Work % not reported Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported
Internal Infrastructure Sewage And Drainage System % not reported Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 BALANCE SHEET- 2021-22.Pdf
Fd 2 Balance Sheet FY2020-21.Pdf
Fd 3 Balance Sheet FY2019-20.Pdf
Fd 4 PROFIT AND LOSS ACCOUNT- 2021-22.Pdf
Fd 5 P&L FY2020-21.Pdf
Fd 6 P&L FY2019-20.Pdf
Fd 7 Directors Report.Pdf
Fd 8 Directors Report.Pdf
Fd 9 Directors Report.Pdf
Fd 10 Cash Flow Statement.Pdf
Fd 11 Cash Flow Statement.Pdf
Fd 12 Cash Flow Statement.Pdf
Fd 13 AUDITOR REPORT-2021-22.Pdf
Fd 14 Audit Report FY2020-21 Compressed.Pdf
Fd 15 Audit Report FY2019-20 Compressed.Pdf
Fd 16 ITR ACK 2021-22.Pdf
Fd 17 ITR Acknowledgement FY2020-21.Pdf
Fd 18 ITR Acknowledgement FY2019-20.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 3 Approval NOC Under Section 109 Of KLR Act 1961( Annexure - 95 )
Noc 4 Approval NOC Under Section 14 Of The KTCP Act( Annexure - 96 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Noc 10 Lift Authorities( Annexure - 102 )
Noc 11 BMRCL( Annexure - 103 )
Noc 12 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 13 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 14 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 15 Coastal Regulation Zone Authority( Annexure - 107 )
Dr 1 Utilisation Certificate( Annexure - 108 )
Dr 2 Transfer Of Development Rights Certificate( Annexure - 109 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Ed 1 18-06-2022
Ed 2 18-06-2022
Ed 3 18-06-2022
Ed 4 18-06-2022
Ed 5 18-06-2022
Ed 6 18-06-2022
Ed 7 18-06-2022
Ed 8 18-06-2022
Ed 9 18-06-2022
Ed 10 18-06-2022
Ed 11 18-06-2022
Ed 12 18-06-2022
Ed 13 13-07-2022
Ed 14 13-07-2022
Ed 15 13-07-2022
Ed 16 13-07-2022
Ed 17 13-07-2022
Ed 18 13-07-2022
Ed 19 13-07-2022
Ed 20 22-07-2022
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Axis Bank
Account Number (RERA) 922020027445311
IFSC UTIB0001446
Branch Address KASTHURI NAGAR
Country/City