Amberstone Vectra RERA Details - PRM/KA/RERA/1251/308/PR/230726/008835 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Amberstone Vectra under registration PRM/KA/RERA/1251/308/PR/230726/008835 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/230726/008835
  • Project Name AMBERSTONE VECTRA
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 31 July 2032
  • Documents 110 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 September 2026 Expected commencement of civil works and foundation on site.
Original Completion 31 July 2032 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

AMBERSTONE VENTURES
Registered Address No 71 (Old No 26), 4th Floor, GR Bhaskar Plaza,8th Main Road, Jayanagara East ,Bengaluru South ,Bengaluru Urban-560011
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy No 133/2, 133/3, 134/2, 134/3, Katha No 1040/133/2 133/3 134/2 134/3 , PID No 150200100100220887, Chambenahalli Village, Sarjapura Hobli , Anekal , Bengaluru Urban, Karnataka - 562125

RERA Coordinates

Latitude, Longitude 12.8965513, 77.7689245
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. APA/CC/203/2026-27
Authority Anekal Planning Authority
Approved Date 10 July 2026

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Block A 2 27 0 156 Residential 83.0 26 156
Block B 2 26 0 150 Residential 80.0 25 150

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • Block A
  • Block B
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 98.69 A101
GF 3 BHK 84.86 A102
GF 3 BHK 85.33 A103
GF 3 BHK 96.91 A104
GF 2 BHK 63.41 A105
GF 2 BHK 63.41 A106
1 3 BHK 98.35 A201
1 3 BHK 84.52 A202
1 3 BHK 85.03 A203
1 3 BHK 96.57 A204
1 2 BHK 67.49 A205
1 2 BHK 67.49 A206
2 3 BHK 98.35 A301
2 3 BHK 84.52 A302
2 3 BHK 85.03 A303
2 3 BHK 96.57 A304
2 2 BHK 67.49 A305
2 2 BHK 67.49 A306
3 3 BHK 98.35 A401
3 3 BHK 84.52 A402
3 3 BHK 85.03 A403
3 3 BHK 96.57 A404
3 2 BHK 67.49 A405
3 2 BHK 67.49 A406
4 3 BHK 98.35 A501
4 3 BHK 84.52 A502
4 3 BHK 85.03 A503
4 3 BHK 96.57 A504
4 2 BHK 67.49 A505
4 2 BHK 67.49 A506
5 3 BHK 98.35 A601
5 3 BHK 84.52 A602
5 3 BHK 85.03 A603
5 3 BHK 96.57 A604
5 2 BHK 67.49 A605
5 2 BHK 67.49 A606
6 3 BHK 98.35 A701
6 3 BHK 84.52 A702
6 3 BHK 85.03 A703
6 3 BHK 96.57 A704
6 2 BHK 67.49 A705
6 2 BHK 67.49 A706
7 3 BHK 98.35 A801
7 3 BHK 84.52 A802
7 3 BHK 85.03 A803
7 3 BHK 96.57 A804
7 2 BHK 67.49 A805
7 2 BHK 67.49 A806
8 3 BHK 98.35 A901
8 3 BHK 84.52 A902
8 3 BHK 85.03 A903
8 3 BHK 96.57 A904
8 2 BHK 67.49 A905
8 2 BHK 67.49 A906
9 3 BHK 98.35 A1001
9 3 BHK 84.52 A1002
9 3 BHK 85.03 A1003
9 3 BHK 96.57 A1004
9 2 BHK 67.49 A1005
9 2 BHK 67.49 A1006
10 3 BHK 98.35 A1101
10 3 BHK 84.52 A1102
10 3 BHK 85.03 A1103
10 3 BHK 96.57 A1104
10 2 BHK 67.49 A1105
10 2 BHK 67.49 A1106
11 3 BHK 98.35 A1201
11 3 BHK 84.52 A1202
11 3 BHK 85.03 A1203
11 3 BHK 96.57 A1204
11 2 BHK 67.49 A1205
11 2 BHK 67.49 A1206
12 3 BHK 98.35 A1301
12 3 BHK 84.52 A1302
12 3 BHK 85.03 A1303
12 3 BHK 96.57 A1304
12 2 BHK 67.49 A1305
12 2 BHK 67.49 A1306
13 3 BHK 98.35 A1401
13 3 BHK 84.52 A1402
13 3 BHK 85.03 A1403
13 3 BHK 96.57 A1404
13 2 BHK 67.49 A1405
13 2 BHK 67.49 A1406
14 3 BHK 98.35 A1501
14 3 BHK 84.52 A1502
14 3 BHK 85.03 A1503
14 3 BHK 96.57 A1504
14 2 BHK 67.49 A1505
14 2 BHK 67.49 A1506
15 3 BHK 98.35 A1601
15 3 BHK 84.52 A1602
15 3 BHK 85.03 A1603
15 3 BHK 96.57 A1604
15 2 BHK 67.49 A1605
15 2 BHK 67.49 A1606
16 3 BHK 98.35 A1701
16 3 BHK 84.52 A1702
16 3 BHK 85.03 A1703
16 3 BHK 96.57 A1704
16 2 BHK 67.49 A1705
16 2 BHK 67.49 A1706
17 3 BHK 98.35 A1801
17 3 BHK 84.52 A1802
17 3 BHK 85.03 A1803
17 3 BHK 96.57 A1804
17 2 BHK 67.49 A1805
17 2 BHK 67.49 A1806
18 3 BHK 98.35 A1901
18 3 BHK 84.52 A1902
18 3 BHK 85.03 A1903
18 3 BHK 96.57 A1904
18 2 BHK 67.49 A1905
18 2 BHK 67.49 A1906
19 3 BHK 98.35 A2001
19 3 BHK 84.52 A2002
19 3 BHK 85.03 A2003
19 3 BHK 96.57 A2004
19 2 BHK 67.49 A2005
19 2 BHK 67.49 A2006
20 3 BHK 98.35 A2101
20 3 BHK 84.52 A2102
20 3 BHK 85.03 A2103
20 3 BHK 96.57 A2104
20 2 BHK 67.49 A2105
20 2 BHK 67.49 A2106
21 3 BHK 98.35 A2201
21 3 BHK 84.52 A2202
21 3 BHK 85.03 A2203
21 3 BHK 96.57 A2204
21 2 BHK 67.49 A2205
21 2 BHK 67.49 A2206
22 3 BHK 98.35 A2301
22 3 BHK 84.52 A2302
22 3 BHK 85.03 A2303
22 3 BHK 96.57 A2304
22 2 BHK 67.49 A2305
22 2 BHK 67.49 A2306
23 3 BHK 98.35 A2401
23 3 BHK 84.52 A2402
23 3 BHK 85.03 A2403
23 3 BHK 96.57 A2404
23 2 BHK 67.49 A2405
23 2 BHK 67.49 A2406
24 3 BHK 98.35 A2501
24 3 BHK 84.52 A2502
24 3 BHK 85.03 A2503
24 3 BHK 96.57 A2504
24 2 BHK 67.49 A2505
24 2 BHK 67.49 A2506
25 3 BHK 98.35 A2601
25 3 BHK 84.52 A2602
25 3 BHK 85.03 A2603
25 3 BHK 96.57 A2604
25 2 BHK 67.49 A2605
25 2 BHK 67.49 A2606
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Ld Rtc
Ld Mutation
Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Balance Sheet 2024-25.Pdf
Fd 2 NA.Pdf
Fd 3 NA.Pdf
Fd 4 Profit And Loss 2024-25.Pdf
Fd 5 NA.Pdf
Fd 6 NA.Pdf
Fd 7 ITR 2024-25.Pdf
Fd 8 NA.Pdf
Fd 9 NA.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Od 1 0 Legal Opinion.Pdf
Od 2 1 Grant Certificate - Muniswamy.Pdf
Od 3 1 Grant Certificate - Papa Reddy.Pdf
Od 4 2 Sale Deed In Favour Of R Munishamy - 1144 Of 1962-63.Pdf
Od 5 3 Sale Deed -1905 - 1962-63.Pdf
Od 6 4 MR 5A-1962-93, MR 5B-1962-63, And 4 -1962-63.Pdf
Od 7 5 Family Tree Of Rudrappa.Pdf
Od 8 6 Partition Deed - 27-09-1982.Pdf
Od 9 7 MR 12 - 1988-89.Pdf
Od 10 8 Order Sheet And Plaint In OS No 3 Of 1986.Pdf
Od 11 9 Compromise Petition And Decree - OS No 3 - 1986.Pdf
Od 12 10 MR 27 -2007-08.Pdf
Od 13 11 Mother Conversion.Pdf
Od 14 12 Sale Agreement 12843 - 2013-14 - Balamurali And Reddy Ananth.Pdf
Od 15 13 Genealogical Tree- Late Muniswamy Reddy.Pdf
Od 16 14 Genealogical Tree Of Yellappa - Copy.Pdf
Od 17 15 Sale Deed- Sy No 134-2 And 134-3 - Craft Show Infra.Pdf
Od 18 16 MOTD - 3994-2014-15.Pdf
Od 19 17 Release Deed Dated 29 -09- 2014 - 4008.Pdf
Od 20 18 Release Deed Dated 29-09-2014- 4011.Pdf
Od 21 19 Release Deed Dated 29-09-2014- 4014.Pdf
Od 22 20 Genealogical Tree Of Yellappa.Pdf
Od 23 21 Dischare Deed - 7964 - 2017-18.Pdf
Od 24 22 H20 Of 2020-21.Pdf
Od 25 23 MR No H21-2020-21.Pdf
Od 26 24 MR T46 - 2022-23.Pdf
Od 27 25 MR No T30 -2023-24.Pdf
Od 28 26 Sale Agreement - 6715 - 2022-23 - Build 4U.Pdf
Od 29 27 Cancellation Deed - 3751 Of 2024-25 - Build 4u.Pdf
Od 30 28 Sale Agreement- 2758 - 2024-25 - Capstone Ventures.Pdf
Od 31 29 Rectification Deed - 3754 - 2024-25 - Craft Show Infra.Pdf
Od 32 30 Sale Deed- 3756- Capstone Ventures.Pdf
Od 33 31 Sale Deed- 3755 Of 2024-25 - Capstone Ventures.Pdf
Od 34 32 Mutation Regiters.Pdf
Od 35 ADLR Sketch Chambenahalli.Pdf
Od 36 Change Of Land -.Pdf
Od 37 Akarband Sy No.Pdf
Od 38 Akarband.Pdf
Od 39 Pakka Book Nakalu Survey Stetch.Pdf
Od 40 Pakka Book Nakalu.Pdf
Od 41 Relinquishment Deed - Park.Pdf
Od 42 Relinquishment Deed- Road.Pdf
Od 43 Village Map - Chambenahalli.Pdf
Od 44 CDP Map - AMBERSTONE VECTRA.Pdf
Od 45 ABSTRACT ESTIMATION - Amberstone Vectra.Pdf
Od 46 Amenities Details - Amberstone Vectra.Pdf
Od 47 Area Statement - Block A And B - Vectra.Pdf
Od 48 Land Cost- Vectra.Pdf
Od 49 STP Drawing.Pdf
Od 50 Form D- Ventures- Attested.Pdf
Od 51 Development Plan.Pdf
Od 52 Approved Letter.Pdf
Od 53 Site Plan- Vectra.Pdf
Od 54 Basement 1 - Plan.Pdf
Od 55 Basement 2 - Plan.Pdf
Od 56 Ground Floor Plan-Block A And B - Vectra.Pdf
Od 57 Floor Plan- 1-3,5-8,10-14,15-18, 25 And 26.Pdf
Od 58 Floor Plan-4,6,9,14,19 &24- Block Aand B- Vectra.Pdf
Od 59 Terrace Plan Vectra.Pdf
Od 60 Borewell Photo.Jpeg
Ed 1 21-07-2026
Ed 2 21-07-2026
Ed 3 21-07-2026
Ed 4 21-07-2026
Ed 5 21-07-2026
Ed 6 21-07-2026
Ed 7 21-07-2026
Ed 8 21-07-2026
Ed 9 21-07-2026
Ed 10 21-07-2026
Ed 11 21-07-2026
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Indian Bank
Account Number (RERA) 8339789525
IFSC IDIB000J625
Branch Address JP NAGAR SARRAKI BRANCH
Country/City