residential New Launch Source: rera.ka

Eaton Park At The Prestige City RERA Details - PRM/KA/RERA/1251/308/PR/180326/008537 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Eaton Park At The Prestige City under registration PRM/KA/RERA/1251/308/PR/180326/008537 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/180326/008537
  • Project Name Eaton Park @ The Prestige City
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 30 June 2030
  • Documents 92 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 April 2026 Expected commencement of civil works and foundation on site.
Original Completion 30 June 2030 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

PRESTIGE PROJECTS PRIVATE LIMITED
Registered Address Prestige Falcon Towers, No.19, ,Brunton Road, Bengaluru East, Bengaluru Urban-560025 ,Bengaluru East ,Bengaluru Urban-560025
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Residential Building at Sy. Nos. 129/1, 129/2, 130/1, 130/2, 130/3, 130/4 &130/5 OF SOMPURA VILLAGE, AND , SY. NO. 23/1, 32/4 OF VALAGERE KALAHALLI VILLAGE SARJAPUR HOBLI, ANEKAL TALUK, BENGALURU DISTRICT , Anekal , Bengaluru Urban, Karnataka - 562125

RERA Coordinates

Latitude, Longitude 12.877615278845116, 77.77432725580908
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. CC/1459/2025-26
Authority Anekal Planning Authority
Approved Date 05 March 2026

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Building 1 Tower 1 2 30 0 87 Residential 92.05 29 87
Building 1 Tower 2 2 30 0 85 Residential 92.05 29 85
Building 2 Tower 3 2 30 0 82 Residential 92.05 29 82
Building 3 Tower 4 3 38 0 112 Residential 116.45 37 112

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
3 BED+3T 0 units
3 BED+3T+POWDER+HO 0 units
4 BED+4T+POWDER+HO 0 units
  • Building 1 Tower 1
  • Building 1 Tower 2
  • Building 2 Tower 3
  • Building 3 Tower 4
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BED+3T 109.62 11001
GF 3 BED+3T 109.62 11011
GF 4 BED+4T+POWDER+HO 146.72 11013
1 3 BED+3T 109.62 11021
1 4 BED+4T+POWDER+HO 149.05 11022
1 4 BED+4T+POWDER+HO 146.72 11023
2 3 BED+3T 109.62 11031
2 4 BED+4T+POWDER+HO 149.05 11032
2 4 BED+4T+POWDER+HO 146.72 11033
3 3 BED+3T 109.62 11041
3 4 BED+4T+POWDER+HO 149.05 11042
3 4 BED+4T+POWDER+HO 146.72 11043
4 3 BED+3T 109.62 11051
4 4 BED+4T+POWDER+HO 149.05 11052
4 4 BED+4T+POWDER+HO 146.72 11053
5 3 BED+3T 109.62 11061
5 4 BED+4T+POWDER+HO 149.05 11062
5 4 BED+4T+POWDER+HO 146.72 11063
6 3 BED+3T 109.62 11071
6 4 BED+4T+POWDER+HO 149.05 11072
6 4 BED+4T+POWDER+HO 146.72 11073
7 3 BED+3T 109.62 11081
7 4 BED+4T+POWDER+HO 149.05 11082
7 4 BED+4T+POWDER+HO 146.72 11083
8 3 BED+3T 109.62 11091
8 4 BED+4T+POWDER+HO 149.05 11092
8 4 BED+4T+POWDER+HO 146.72 11093
9 3 BED+3T 109.62 11101
9 4 BED+4T+POWDER+HO 149.05 11102
9 4 BED+4T+POWDER+HO 146.72 11103
10 3 BED+3T 109.62 11111
10 4 BED+4T+POWDER+HO 149.05 11112
10 4 BED+4T+POWDER+HO 146.72 11113
11 3 BED+3T 109.62 11121
11 4 BED+4T+POWDER+HO 149.05 11122
11 4 BED+4T+POWDER+HO 146.72 11123
12 3 BED+3T 109.62 11131
12 4 BED+4T+POWDER+HO 149.05 11132
12 4 BED+4T+POWDER+HO 146.72 11133
13 3 BED+3T 109.62 11141
13 4 BED+4T+POWDER+HO 149.05 11142
13 4 BED+4T+POWDER+HO 146.72 11143
14 3 BED+3T 109.62 11151
14 4 BED+4T+POWDER+HO 149.05 11152
14 4 BED+4T+POWDER+HO 146.72 11153
15 3 BED+3T 109.62 11161
15 4 BED+4T+POWDER+HO 149.05 11162
15 4 BED+4T+POWDER+HO 146.72 11163
16 3 BED+3T 109.62 11171
16 4 BED+4T+POWDER+HO 149.05 11172
16 4 BED+4T+POWDER+HO 146.72 11173
17 3 BED+3T 109.62 11181
17 4 BED+4T+POWDER+HO 149.05 11182
17 4 BED+4T+POWDER+HO 146.72 11183
18 3 BED+3T 109.62 11191
18 4 BED+4T+POWDER+HO 149.05 11192
18 4 BED+4T+POWDER+HO 146.72 11193
19 3 BED+3T 109.62 11201
19 4 BED+4T+POWDER+HO 149.05 11202
19 3 BED+3T+POWDER+HO 122.77 11203
20 3 BED+3T 109.62 11211
20 4 BED+4T+POWDER+HO 149.05 11212
20 4 BED+4T+POWDER+HO 146.72 11213
21 3 BED+3T 109.62 11221
21 4 BED+4T+POWDER+HO 149.05 11222
21 4 BED+4T+POWDER+HO 146.72 11223
22 3 BED+3T 109.62 11231
22 4 BED+4T+POWDER+HO 149.05 11232
22 4 BED+4T+POWDER+HO 146.72 11233
23 3 BED+3T 109.62 11241
23 4 BED+4T+POWDER+HO 149.05 11242
23 4 BED+4T+POWDER+HO 146.72 11243
24 3 BED+3T 109.62 11251
24 4 BED+4T+POWDER+HO 149.05 11252
24 4 BED+4T+POWDER+HO 146.72 11253
25 3 BED+3T 109.62 11261
25 4 BED+4T+POWDER+HO 149.05 11262
25 4 BED+4T+POWDER+HO 146.72 11263
26 3 BED+3T 109.62 11271
26 4 BED+4T+POWDER+HO 149.05 11272
26 4 BED+4T+POWDER+HO 146.72 11273
27 3 BED+3T 109.62 11281
27 4 BED+4T+POWDER+HO 149.05 11282
27 4 BED+4T+POWDER+HO 146.72 11283
28 3 BED+3T 109.62 11291
28 4 BED+4T+POWDER+HO 149.05 11292
28 4 BED+4T+POWDER+HO 146.72 11293
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Amenities Swimming Pool % not reported Amenities Gym % not reported Sub Structure Earth Work And Other Leveling Preparation Work % not reported
Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported
Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported Sup Structure Masonry Construction % not reported
Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported
Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported
Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported Finishing Works Weather Proof Work(tile,concrete) % not reported
Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported
Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported
Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported Internal Infrastructure Solid Waste Management And Disposal % not reported
Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported External Infrastructure Internal Roads & Footpaths % not reported
External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported External Infrastructure Solid Waste Management And Disposal % not reported
External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported External Infrastructure Use Of Renewable Energy % not reported
External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported External Infrastructure Sewage Treatment Plant (Stp) % not reported
External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported Amenities Electricity % not reported
Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported Amenities Club House % not reported
Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported Amenities Indoor Sports Facility % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 PPPL BS March 2025.Pdf
Fd 2 BS.Pdf
Fd 3 BS 2023 PPPL.Pdf
Fd 4 PPPL PL March 2025.Pdf
Fd 5 PL.Pdf
Fd 6 PL 2023 PPPL.Pdf
Fd 7 ITR-V Mar25.Pdf
Fd 8 ITR-V - FY 2023-24.Pdf
Fd 9 ITR V 2023 PPPL NA.Pdf
Fd 10 PPPL Boards Report Compressed.Pdf
Fd 11 Director Report PPPL.Pdf
Fd 12 Directors Report 2023 PPPL.Pdf
Fd 13 PPPL CFS March 2025.Pdf
Fd 14 CFS.Pdf
Fd 15 CFS 2023 PPPL.Pdf
Fd 16 PPPL AR March 2025.Pdf
Fd 17 PPPL AR.Pdf
Fd 18 AR 2023 PPPL.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Noc 8 Lift Authorities( Annexure - 102 )
Noc 9 BMRCL( Annexure - 103 )
Noc 10 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 11 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 12 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 13 Coastal Regulation Zone Authority( Annexure - 107 )
Photo 1 Project Photo
Od 1 NA.Pdf
Ed 1 16-03-2026
Ed 2 16-03-2026
Ed 3 16-03-2026
Ed 4 16-03-2026
Ed 5 16-03-2026
Ed 6 16-03-2026
Ed 7 16-03-2026
Ed 8 16-03-2026
Ed 9 16-03-2026
Ed 10 16-03-2026
Ed 11 16-03-2026
Ed 12 16-03-2026
Ed 13 16-03-2026
Ed 14 16-03-2026
Ed 15 16-03-2026
Ed 16 16-03-2026
Ed 17 16-03-2026
Ed 18 16-03-2026
Ed 19 16-03-2026
Ed 20 16-03-2026
Ed 21 16-03-2026
Ed 22 16-03-2026
Ed 23 16-03-2026
Ed 24 16-03-2026
Ed 25 16-03-2026
Ed 26 16-03-2026
Ed 27 16-03-2026
Ed 28 16-03-2026
Ed 29 16-03-2026
Ed 30 16-03-2026
Ed 31 16-03-2026
Ed 32 16-03-2026
Ed 33 16-03-2026
Ed 34 16-03-2026
Ed 35 18-03-2026
Ed 36 18-03-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI Bank
Account Number (RERA) 777705191222
IFSC ICIC0000002
Branch Address M G Road Bengaluru
Country/City