residential Under Construction Source: rera.ka

DSR The Address RERA Details - PRM/KA/RERA/1251/308/PR/050924/006996 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for DSR The Address under registration PRM/KA/RERA/1251/308/PR/050924/006996 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/050924/006996
  • Project Name DSR THE ADDRESS
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 12 June 2029
  • Documents 82 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 25 July 2024 Expected commencement of civil works and foundation on site.
Original Completion 12 June 2029 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

DSR INFRAPROJECTS
Registered Address DSR TECHNO CUBE BLOCK C 4TH FLOOR NEAR KUNDALAHALLI GATE ,NEXT TO SKR KALYANA MANTAPA,,THUBARAHALLI BENGALURU ,Bengaluru East ,Bengaluru East ,Bengaluru Urban-560066
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

RERA Coordinates

Latitude, Longitude 12.892282, 77.7492091
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. 18/24-25
Authority BDA - Bangalore Development Authority
Approved Date 18 July 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type No. of Floors No. of Units
TOWER 1 3 30 1 275 Residential 30 275
TOWER 2 3 30 1 275 Residential 30 275
TOWER 3 3 30 1 240 Residential 30 120
TOWER 4 3 30 1 275 Residential 30 275
TOWER 5 3 30 1 275 Residential 30 275
TOWER 6 3 12 1 152 Residential 12 152

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 4
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
  • TOWER 1
  • TOWER 2
  • TOWER 3
  • TOWER 4
  • TOWER 5
  • TOWER 6
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3BHK 112.93 G01
-1 3BHK 112.32 G02
-1 2BHK 74.86 G03
-1 3BHK 100.59 G04
-1 3BHK 100.59 G06
-1 3BHK 88.63 G07
-1 3BHK 117.53 G08
-1 3BHK 117.63 G09
GF 3BHK 112.93 101
GF 3BHK 112.32 102
GF 2BHK 74.86 103
GF 3BHK 100.59 104
GF 3BHK 100.59 106
GF 3BHK 88.63 107
GF 3BHK 117.53 108
GF 3BHK 117.63 109
1 3BHK 112.93 201
1 3BHK 112.32 202
1 2BHK 74.86 203
1 3BHK 100.59 204
1 2BHK 66.85 205
1 3BHK 100.59 206
1 3BHK 88.63 207
1 3BHK 117.53 208
1 3BHK 117.63 209
2 3BHK 112.93 301
2 3BHK 112.32 302
2 2BHK 74.86 303
2 3BHK 100.59 304
2 2BHK 66.85 305
2 3BHK 100.59 306
2 3BHK 88.63 307
2 3BHK 117.53 308
2 3BHK 117.63 309
3 3BHK 112.93 401
3 3BHK 112.32 402
3 2BHK 74.86 403
3 3BHK 100.59 404
3 2BHK 66.85 405
3 3BHK 100.59 406
3 3BHK 88.63 407
3 3BHK 117.53 408
3 3BHK 117.63 409
4 3BHK 112.93 501
4 3BHK 112.32 502
4 2BHK 74.86 503
4 3BHK 100.59 504
4 2BHK 66.85 505
4 3BHK 100.59 506
4 3BHK 88.63 507
4 3BHK 117.53 508
4 3BHK 117.63 509
5 3BHK 112.93 601
5 3BHK 112.32 602
5 2BHK 74.86 603
5 3BHK 100.59 604
5 2BHK 66.85 605
5 3BHK 100.59 606
5 3BHK 88.63 607
5 3BHK 117.53 608
5 3BHK 117.63 609
6 3BHK 112.93 701
6 3BHK 112.32 702
6 2BHK 74.86 703
6 3BHK 100.59 704
6 2BHK 66.85 705
6 3BHK 100.59 706
6 3BHK 88.63 707
6 3BHK 117.53 708
6 3BHK 117.63 709
7 3BHK 112.93 801
7 3BHK 112.32 802
7 2BHK 74.86 803
7 3BHK 100.59 804
7 2BHK 66.85 805
7 3BHK 100.59 806
7 3BHK 88.63 807
7 3BHK 117.53 808
7 3BHK 117.63 809
8 3BHK 112.93 901
8 3BHK 112.32 902
8 2BHK 74.86 903
8 3BHK 100.59 904
8 2BHK 66.85 905
8 3BHK 100.59 906
8 3BHK 88.63 907
8 3BHK 117.53 908
8 3BHK 117.63 909
9 3BHK 112.93 1001
9 3BHK 112.32 1002
9 2BHK 74.86 1003
9 3BHK 100.59 1004
9 2BHK 66.85 1005
9 3BHK 100.59 1006
9 3BHK 88.63 1007
9 3BHK 117.53 1008
9 3BHK 117.63 1009
10 3BHK 112.93 1101
10 3BHK 112.32 1102
10 2BHK 74.86 1103
10 3BHK 100.59 1104
10 2BHK 66.85 1105
10 3BHK 100.59 1106
10 3BHK 88.63 1107
10 3BHK 117.53 1108
10 3BHK 117.63 1109
11 3BHK 112.93 1201
11 3BHK 112.32 1202
11 2BHK 74.86 1203
11 3BHK 100.59 1204
11 2BHK 66.85 1205
11 3BHK 100.59 1206
11 3BHK 88.63 1207
11 3BHK 117.53 1208
11 3BHK 117.63 1209
12 3BHK 112.93 1301
12 3BHK 112.32 1302
12 2BHK 74.86 1303
12 3BHK 100.59 1304
12 2BHK 66.85 1305
12 3BHK 100.59 1306
12 3BHK 88.63 1307
12 3BHK 117.53 1308
12 3BHK 117.63 1309
13 3BHK 112.93 1401
13 3BHK 112.32 1402
13 2BHK 74.86 1403
13 3BHK 100.59 1404
13 2BHK 66.85 1405
13 3BHK 100.59 1406
13 3BHK 88.63 1407
13 3BHK 117.53 1408
13 3BHK 117.63 1409
14 3BHK 112.93 1501
14 3BHK 112.32 1502
14 2BHK 74.86 1503
14 3BHK 100.59 1504
14 2BHK 66.85 1505
14 3BHK 100.59 1506
14 3BHK 88.63 1507
14 3BHK 117.53 1508
14 3BHK 117.63 1509
15 3BHK 112.93 1601
15 3BHK 112.32 1602
15 2BHK 74.86 1603
15 3BHK 100.59 1604
15 2BHK 66.85 1605
15 3BHK 100.59 1606
15 3BHK 88.63 1607
15 3BHK 117.53 1608
15 3BHK 117.63 1609
16 3BHK 112.93 1701
16 3BHK 112.32 1702
16 2BHK 74.86 1703
16 3BHK 100.59 1704
16 2BHK 66.85 1705
16 3BHK 100.59 1706
16 3BHK 88.63 1707
16 3BHK 117.53 1708
16 3BHK 117.63 1709
17 3BHK 112.93 1801
17 3BHK 112.32 1802
17 2BHK 74.86 1803
17 3BHK 100.59 1804
17 2BHK 66.85 1805
17 3BHK 88.63 1807
17 3BHK 117.53 1808
17 3BHK 117.63 1809
18 3BHK 112.93 1901
18 3BHK 112.32 1902
18 2BHK 74.86 1903
18 3BHK 100.59 1904
18 2BHK 66.85 1905
18 3BHK 100.59 1906
18 3BHK 88.63 1907
18 3BHK 117.53 1908
18 3BHK 117.63 1909
19 3BHK 112.93 2001
19 3BHK 112.32 2002
19 2BHK 74.86 2003
19 3BHK 100.59 2004
19 2BHK 66.85 2005
19 3BHK 100.59 2006
19 3BHK 88.63 2007
19 3BHK 117.53 2008
19 3BHK 117.63 2009
20 3BHK 112.93 2101
20 3BHK 112.32 2102
20 2BHK 74.86 2103
20 3BHK 100.59 2104
20 2BHK 66.85 2105
20 3BHK 100.59 2106
20 3BHK 88.63 2107
20 3BHK 117.53 2108
20 3BHK 117.63 2109
21 3BHK 112.93 2201
21 3BHK 112.32 2202
21 2BHK 74.86 2203
21 3BHK 100.59 2204
21 2BHK 66.85 2205
21 3BHK 100.59 2206
21 3BHK 88.63 2207
21 3BHK 117.53 2208
21 3BHK 117.63 2209
22 3BHK 112.93 2301
22 3BHK 112.32 2302
22 2BHK 74.86 2303
22 3BHK 100.59 2304
22 2BHK 66.85 2305
22 3BHK 100.59 2306
22 3BHK 88.63 2307
22 3BHK 117.53 2308
22 3BHK 117.63 2309
23 3BHK 112.93 2401
23 3BHK 112.32 2402
23 2BHK 74.86 2403
23 3BHK 100.59 2404
23 2BHK 66.85 2405
23 3BHK 100.59 2406
23 3BHK 88.63 2407
23 3BHK 117.53 2408
23 3BHK 117.63 2409
24 3BHK 112.93 2501
24 3BHK 112.32 2502
24 2BHK 74.86 2503
24 3BHK 100.59 2504
24 2BHK 66.85 2505
24 3BHK 100.59 2506
24 3BHK 88.63 2507
24 3BHK 117.53 2508
24 3BHK 117.63 2509
25 3BHK 112.93 2601
25 3BHK 112.32 2602
25 2BHK 74.86 2603
25 3BHK 100.59 2604
25 2BHK 66.85 2605
25 3BHK 100.59 2606
25 3BHK 88.63 2607
25 3BHK 117.53 2608
25 3BHK 117.63 2609
26 3BHK 112.93 2701
26 3BHK 112.32 2702
26 2BHK 74.86 2703
26 3BHK 100.59 2704
26 2BHK 66.85 2705
26 3BHK 100.59 2706
26 3BHK 88.63 2707
26 3BHK 117.53 2708
26 3BHK 117.63 2709
27 3BHK 112.93 2801
27 3BHK 112.32 2802
27 2BHK 74.86 2803
27 3BHK 100.59 2804
27 2BHK 66.85 2805
27 3BHK 88.63 2807
27 3BHK 117.53 2808
27 3BHK 117.63 2809
28 3BHK 112.93 2901
28 3BHK 112.32 2902
28 2BHK 74.86 2903
28 3BHK 100.59 2904
28 2BHK 66.85 2905
28 3BHK 100.59 2906
28 3BHK 88.63 2907
28 3BHK 117.53 2908
28 3BHK 117.63 2909
29 3BHK 112.93 3001
29 3BHK 112.32 3002
29 2BHK 74.86 3003
29 3BHK 100.59 3004
29 2BHK 66.85 3005
29 3BHK 100.59 3006
29 3BHK 88.63 3007
29 3BHK 117.53 3008
29 3BHK 117.63 3009
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Retaining Wall (All Types) % not reported
Sub Structure Plinth Level Beam % not reported Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction: Bricks, Concrete Blocks Etc % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Painting % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Santioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Internal Roads & Footpaths % not reported
Internal Infrastructure Sewage And Drainage System % not reported Internal Infrastructure Parks & Tree Planting % not reported Internal Infrastructure Street Lighting % not reported
Internal Infrastructure Provision For Community Buildings And For Treatment And Disposal Of Sewage And Sullage Water % not reported Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Water Conservation % not reported
Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported Internal Infrastructure Education/health/other Public Amenities % not reported
External Infrastructure Water Supply % not reported External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported
External Infrastructure Electricity Supply Transformer And Substation % not reported External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported
External Infrastructure Storm Water Drains % not reported External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported
External Infrastructure Fire Protection And Fire Safety Requirements % not reported Amenities Electricity % not reported Amenities Smart Home Automation % not reported
Amenities Cctv Surveillance % not reported Amenities Club House % not reported Amenities Community Hall % not reported
Amenities Outdoor Sports Facility % not reported Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported
Amenities Gym % not reported Amenities Parks % not reported Amenities Power Backup % not reported
Amenities Gas % not reported Amenities Water And Sanitation % not reported Amenities Air Conditioning And Incerntion % not reported
Common Areas Staircases % not reported Common Areas Lifts % not reported Common Areas Staircases And Lift Lobbies, Corridor,lobbies, Corridor % not reported
Common Areas Fire Escapes % not reported Common Areas Common Entrance And Exit For The Building / Common Portico/foyer/verandah % not reported Common Areas Basement % not reported
Common Areas Terrace % not reported Common Areas Outer Wall % not reported Common Areas Open Parking Areas And Common Storage Spaces % not reported
Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported Common Areas Water Conservation And Renewable Energy % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 BALANCES SHEET FY 2022-23.Pdf
Fd 2 DSRIP BS 21-22.Pdf
Fd 3 DSRIP BS 20-21.Pdf
Fd 4 PROFIT AND LOSS ACCOUNT FY 2022-23.Pdf
Fd 5 DSRIP PL 21-22.Pdf
Fd 6 DSRIP PL 20-21.Pdf
Fd 7 Audit Report UDIN.Pdf
Fd 8 DSRIP AUDIT REPORT 21-23.Pdf
Fd 9 DSRIP AUDIT REPORT 20-21 NEW.Pdf
Fd 10 BALANCES SHEET FY 2022-23.Pdf
Fd 11 DSRIP BS 21-22.Pdf
Fd 12 DSRIP BS 20-21.Pdf
Fd 13 Audit Report UDIN.Pdf
Fd 14 DSRIP AUDIT REPORT 21-23.Pdf
Fd 15 DSRIP AUDIT REPORT 20-21 NEW.Pdf
Fd 16 Income Tax Return FY 2022-23.Pdf
Fd 17 ITR Acknowledgement 2021-22 Pdf 622000911071022.Pdf
Fd 18 DSRIP ITR ACKNOWLEDGEMENT 20-21.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 Conversion OrderSThe Address.Pdf
Od 2 DSR THE ADDRESS DP PLAN.Pdf
Od 3 KHATHA DSR THE ADDRESS.Pdf
Od 4 PROPERTY TAX DSR THE ADDRESS.Pdf
Od 5 DSR THE ADDRESS SANCTIONED PLAN.Pdf
Od 6 Address Bda License.Pdf
Od 7 RTC ADDRESS FINAL.Pdf
Od 8 RELINQUISHEMENT DEED.Pdf
Ed 1 05-08-2024
Ed 2 05-08-2024
Ed 3 05-08-2024
Ed 4 05-08-2024
Ed 5 05-08-2024
Ed 6 05-08-2024
Ed 7 05-08-2024
Ed 8 05-08-2024
Ed 9 05-08-2024
Ed 10 05-08-2024
Ed 11 05-08-2024
Ed 12 05-08-2024
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank STATE BANK OF INDIA
Account Number (RERA) 43701842691
IFSC SBIN0020743
Branch Address ifb ind bank
Country/City