Elegant Atmos RERA Details - PRM/KA/RERA/1251/309/PR/200825/008010 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Elegant Atmos under registration PRM/KA/RERA/1251/309/PR/200825/008010 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/309/PR/200825/008010
  • Project Name ELEGANT ATMOS
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru North
  • Original Completion 31 December 2028
  • Documents 71 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 July 2025 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2028 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

ELEGANT ATMOS
Registered Address No.1/116,,New Kempegowda Layout, BSK 3rd Stage ,Bengaluru South ,Bengaluru Urban-560085
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address BBMP Khatha No. No.10/52/2,52/3, (carved out of Sy.No.52/2 and 52/3) , Doddabettahalli Village, Ward No. 03, Yelahanka Hobli, Bangalore North Taluk, , Bengaluru North , Bengaluru Urban, Karnataka - 560064

RERA Coordinates

Latitude, Longitude 13.094469262877984, 77.56118113988114
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. PRJ/6799/24-25IN
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 26 June 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
BLOCK - A 2 15 1 101 Residential 44.95 14 68
BLOCK - B 2 15 1 101 Residential 44.95 14 68

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
3 BHK 0 units
5 BHK 0 units
  • BLOCK - A
  • BLOCK - B
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3.5 BHK 112.13 A -101
GF 3.5 BHK 109.25 A -102
GF 3 BHK 83.24 A -103
1 3.5 BHK 112.32 A -201
1 3.5 BHK 112.5 A -202
1 3 BHK 89.93 A -203
1 3 BHK 99.5 A -204
1 3 BHK 99.41 A -205
2 3.5 BHK 112.32 A -301
2 3.5 BHK 112.51 A -302
2 3 BHK 89.93 A -303
2 3.5 BHK 115.57 A -304
2 3 BHK 99.59 A -305
3 3.5 BHK 112.32 A -401
3 3.5 BHK 112.5 A -402
3 3 BHK 89.93 A -403
3 3 BHK 99.68 A -404
3 3 BHK 99.59 A -405
4 3.5 BHK 112.32 A -501
4 3.5 BHK 112.5 A -502
4 3 BHK 89.93 A -503
4 3 BHK 99.68 A -504
4 3 BHK 99.59 A -505
5 3.5 BHK 112.32 A -601
5 3.5 BHK 112.5 A -602
5 3 BHK 89.93 A -603
5 3 BHK 99.68 A -604
5 3 BHK 99.59 A -605
6 3.5 BHK 112.32 A -701
6 3.5 BHK 112.5 A -702
6 3 BHK 89.93 A -703
6 3 BHK 99.68 A -704
6 3 BHK 99.59 A -705
7 3.5 BHK 112.32 A -801
7 3.5 BHK 112.5 A -802
7 3 BHK 89.93 A -803
7 3 BHK 99.68 A -804
7 3 BHK 99.59 A -805
8 3.5 BHK 112.32 A -901
8 3.5 BHK 112.5 A -902
8 3 BHK 89.93 A -903
8 3 BHK 99.68 A -904
8 3 BHK 99.59 A -905
9 3.5 BHK 112.32 A -1001
9 3.5 BHK 112.5 A -1002
9 3 BHK 89.93 A -1003
9 3 BHK 99.68 A -1004
9 3 BHK 99.59 A -1005
10 3.5 BHK 112.32 A -1101
10 3.5 BHK 112.5 A -1102
10 3 BHK 89.93 A -1103
10 3 BHK 99.68 A -1104
10 3 BHK 99.59 A -1105
11 3.5 BHK 112.32 A -1201
11 3.5 BHK 112.5 A -1202
11 3 BHK 89.93 A -1203
11 3 BHK 99.68 A -1204
11 3 BHK 99.59 A -1205
12 3.5 BHK 112.32 A -1401
12 3.5 BHK 112.5 A -1402
12 3 BHK 89.93 A -1403
12 3 BHK 99.68 A -1404
12 3 BHK 99.59 A -1405
13 3.5 BHK 112.32 A -1501
13 3.5 BHK 112.5 A -1502
13 3 BHK 89.93 A -1503
13 3 BHK 99.68 A -1504
13 3 BHK 99.59 A -1505
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 ELEGANT ATMOS-Balance Sheet - Provision.Pdf
Fd 2 Not Applicable.Pdf
Fd 3 Not Applicable.Pdf
Fd 4 ELEGANT ATMOS- P & L - Provision.Pdf
Fd 5 Not Applicable.Pdf
Fd 6 Not Applicable.Pdf
Fd 7 Declaration ITR.Pdf
Fd 8 Not Applicable.Pdf
Fd 9 Not Applicable.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 9 BMRCL( Annexure - 103 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Photo 4 Project Photo
Photo 5 Project Photo
Photo 6 Project Photo
Photo 7 Project Photo
Od 1 Water Source.Pdf
Od 2 Akraband-Doc08734820241204172334.Pdf
Od 3 BBMP Khata-10-52-2-3.Pdf
Od 4 Hissa Survey-Doc08734920241204172412.Pdf
Od 5 Mutation Register-Doc08737320241204175507.Pdf
Od 6 Village Map.Pdf
Od 7 BBMP Fee Receipt.Pdf
Od 8 BSNL Demand Note.Pdf
Od 9 FIRE Online Payment Done On 3-7-24.Pdf
Od 10 HAL Demand Note.Pdf
Od 11 KSPCB Online Payment Receipt.Pdf
Od 12 BESCOM NOC.Pdf
Od 13 BOQ Estimate - Engineer.Pdf
Ed 1 26-07-2025
Ed 2 26-07-2025
Ed 3 26-07-2025
Ed 4 26-07-2025
Ed 5 26-07-2025
Ed 6 26-07-2025
Ed 7 26-07-2025
Ed 8 26-07-2025
Ed 9 26-07-2025
Ed 10 02-08-2025
Ed 11 02-08-2025
Ed 12 02-08-2025
Ed 13 11-08-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Bank of Baroda
Account Number (RERA) 27500200002301
IFSC BARBJPNAGA
Branch Address JP Nagar Branch , Bangalore