residential New Launch Source: rera.ka

Bhartiya Garden Estate RERA Details - PRM/KA/RERA/1251/309/PR/060925/008064 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Bhartiya Garden Estate under registration PRM/KA/RERA/1251/309/PR/060925/008064 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/309/PR/060925/008064
  • Project Name Bhartiya Garden Estate Phase-2
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Bengaluru North
  • Original Completion 28 February 2031
  • Documents 75 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 September 2025 Expected commencement of civil works and foundation on site.
Original Completion 28 February 2031 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Bhartiya Urban Pvt Ltd
Registered Address Khatha No.6/2, Sy No.32/1 to 50, Bhartiya City, Discovery Centre,,Thannisandra Main Road, Chokkanahalli, Yelahanka , Bangalore urb ,Bengaluru North ,Bengaluru Urban-560064
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address PID No.150200200900420960, Sy No.12/1, 127/1, 127/2, 127/4, 127/5, 127/13, 127/14, 127/15 & 127/17 , Navarathna Agrahara, Jala Hobli, Yelahanka, Bengaluru North, Bengaluru , Bengaluru North , Bengaluru Urban, Karnataka - 562157

RERA Coordinates

Latitude, Longitude 13.19951, 77.64099
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BIAAPA/TP/CC/219/2025-26
Authority BIAPPA - Bangalore Airport Area Planning Authority
Approved Date 06 August 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower H 2 25 0 226 Residential 68.1 22 203
Tower J 2 25 0 160 Residential 68.1 22 160
Tower K 2 0 0 180 Residential 68.1 22 180
Block 7A 0 4 0 36 Residential 13.65 3 18
Tower 7B 0 4 0 36 Residential 13.65 3 18
Block 9 0 3 0 32 Residential 10.35 2 16
Block 10B 0 3 0 20 Residential 10.35 2 10
Block-11 0 2 0 4 Residential 7.05 1 2

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 6
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
5 BHK 0 units
NA 0 units
  • Tower H
  • Tower J
  • Tower K
  • Block 7A
  • Tower 7B
  • Block 9
  • Block 10B
  • Block-11
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 4 BHK 153.3816425 H0003
-1 3.5 BHK 121.8877741 H0004
-1 2 BHK 64.28836864 H0005
-1 1 BHK 43.1066518 H0006
-1 NA 35.48866592 H0007
-1 2 BHK 109.2530658 H0008
-1 2.5 BHK 124.7677443 H0009
GF 4 BHK 153.3816425 H0103
GF 3.5 BHK 121.8877741 H0104
GF 2 BHK 64.28836864 H0105
GF 1 BHK 43.1066518 H0106
GF NA 35.48866592 H0107
GF 2 BHK 68.28316611 H0108
GF 2.5 BHK 77.57339279 H0109
1 3 BHK 109.4388703 H0201
1 3 BHK 109.4388703 H0202
1 4 BHK 153.3816425 H0203
1 3.5 BHK 121.8877741 H0204
1 2 BHK 64.28836864 H0205
1 1 BHK 43.1066518 H0206
1 NA 35.48866592 H0207
1 2 BHK 68.28316611 H0208
1 2.5 BHK 77.57339279 H0209
2 3 BHK 109.4388703 H0301
2 3 BHK 109.4388703 H0302
2 4 BHK 153.3816425 H0303
2 3.5 BHK 121.8877741 H0304
2 2 BHK 64.28836864 H0305
2 1 BHK 43.1066518 H0306
2 NA 35.48866592 H0307
2 2 BHK 68.28316611 H0308
2 2.5 BHK 77.57339279 H0309
3 3 BHK 109.4388703 H0401
3 3 BHK 109.4388703 H0402
3 4 BHK 153.3816425 H0403
3 3.5 BHK 121.8877741 H0404
3 2 BHK 64.28836864 H0405
3 1 BHK 43.1066518 H0406
3 NA 35.48866592 H0407
3 2 BHK 68.28316611 H0408
3 2.5 BHK 77.57339279 H0409
4 3 BHK 109.4388703 H0501
4 3 BHK 109.4388703 H0502
4 4 BHK 153.3816425 H0503
4 3.5 BHK 121.8877741 H0504
4 2 BHK 64.28836864 H0505
4 1 BHK 43.1066518 H0506
4 NA 35.48866592 H0507
4 2 BHK 68.28316611 H0508
4 2.5 BHK 77.57339279 H0509
5 3 BHK 109.4388703 H0601
5 3 BHK 109.4388703 H0602
5 4 BHK 153.3816425 H0603
5 3.5 BHK 121.8877741 H0604
5 2 BHK 64.28836864 H0605
5 1 BHK 43.1066518 H0606
5 NA 35.48866592 H0607
5 2 BHK 68.28316611 H0608
5 2.5 BHK 77.57339279 H0609
6 3 BHK 109.4388703 H0701
6 3 BHK 109.4388703 H0702
6 4 BHK 153.3816425 H0703
6 3.5 BHK 121.8877741 H0704
6 2 BHK 64.28836864 H0705
6 1 BHK 43.1066518 H0706
6 NA 35.48866592 H0707
6 2 BHK 68.28316611 H0708
6 2.5 BHK 77.57339279 H0709
7 3 BHK 109.4388703 H0801
7 3 BHK 109.4388703 H0802
7 4 BHK 153.3816425 H0803
7 3.5 BHK 121.8877741 H0804
7 2 BHK 64.28836864 H0805
7 1 BHK 43.1066518 H0806
7 NA 35.48866592 H0807
7 2 BHK 68.28316611 H0808
7 2.5 BHK 77.57339279 H0809
8 3 BHK 109.4388703 H0901
8 3 BHK 109.4388703 H0902
8 4 BHK 153.3816425 H0903
8 3.5 BHK 121.8877741 H0904
8 2 BHK 64.28836864 H0905
8 1 BHK 43.1066518 H0906
8 NA 35.48866592 H0907
8 2 BHK 68.28316611 H0908
8 2.5 BHK 77.57339279 H0909
9 3 BHK 109.4388703 H1001
9 3 BHK 109.4388703 H1002
9 4 BHK 153.3816425 H1003
9 3.5 BHK 121.8877741 H1004
9 2 BHK 64.28836864 H1005
9 1 BHK 43.1066518 H1006
9 NA 35.48866592 H1007
9 2 BHK 68.28316611 H1008
9 2.5 BHK 77.57339279 H1009
10 3 BHK 109.4388703 H1101
10 3 BHK 109.4388703 H1102
10 4 BHK 153.3816425 H1103
10 3.5 BHK 121.8877741 H1104
10 2 BHK 64.28836864 H1105
10 1 BHK 43.1066518 H1106
10 NA 35.48866592 H1107
10 2 BHK 68.28316611 H1108
10 2.5 BHK 77.57339279 H1109
11 3 BHK 109.4388703 H1201
11 3 BHK 109.4388703 H1202
11 4 BHK 153.3816425 H1203
11 3.5 BHK 121.8877741 H1204
11 2 BHK 64.28836864 H1205
11 1 BHK 43.1066518 H1206
11 NA 35.48866592 H1207
11 2 BHK 68.28316611 H1208
11 2.5 BHK 77.57339279 H1209
12 3 BHK 109.4388703 H1301
12 3 BHK 109.4388703 H1302
12 4 BHK 153.3816425 H1303
12 3.5 BHK 121.8877741 H1304
12 2 BHK 64.28836864 H1305
12 1 BHK 43.1066518 H1306
12 NA 35.48866592 H1307
12 2 BHK 68.28316611 H1308
12 2.5 BHK 77.57339279 H1309
13 3 BHK 109.4388703 H1401
13 3 BHK 109.4388703 H1402
13 4 BHK 153.3816425 H1403
13 3.5 BHK 121.8877741 H1404
13 2 BHK 64.28836864 H1405
13 1 BHK 43.1066518 H1406
13 NA 35.48866592 H1407
13 2 BHK 68.28316611 H1408
13 2.5 BHK 77.57339279 H1409
14 3 BHK 109.4388703 H1501
14 3 BHK 109.4388703 H1502
14 4 BHK 153.3816425 H1503
14 3.5 BHK 121.8877741 H1504
14 2 BHK 64.28836864 H1505
14 1 BHK 43.1066518 H1506
14 NA 35.48866592 H1507
14 2 BHK 68.28316611 H1508
14 2.5 BHK 77.57339279 H1509
15 3 BHK 109.4388703 H1601
15 3 BHK 109.4388703 H1602
15 4 BHK 153.3816425 H1603
15 3.5 BHK 121.8877741 H1604
15 2 BHK 64.28836864 H1605
15 1 BHK 43.1066518 H1606
15 NA 35.48866592 H1607
15 2 BHK 68.28316611 H1608
15 2.5 BHK 77.57339279 H1609
16 3 BHK 109.4388703 H1701
16 3 BHK 109.4388703 H1702
16 4 BHK 153.3816425 H1703
16 3.5 BHK 121.8877741 H1704
16 2 BHK 64.28836864 H1705
16 1 BHK 43.1066518 H1706
16 NA 35.48866592 H1707
16 2 BHK 68.28316611 H1708
16 2.5 BHK 77.57339279 H1709
17 3 BHK 109.4388703 H1801
17 3 BHK 109.4388703 H1802
17 4 BHK 153.3816425 H1803
17 3.5 BHK 121.8877741 H1804
17 2 BHK 64.28836864 H1805
17 1 BHK 43.1066518 H1806
17 NA 35.48866592 H1807
17 2 BHK 68.28316611 H1808
17 2.5 BHK 77.57339279 H1809
18 3 BHK 109.4388703 H1901
18 3 BHK 109.4388703 H1902
18 4 BHK 153.3816425 H1903
18 3.5 BHK 121.8877741 H1904
18 2 BHK 64.28836864 H1905
18 1 BHK 43.1066518 H1906
18 NA 35.48866592 H1907
18 2 BHK 68.28316611 H1908
18 2.5 BHK 77.57339279 H1909
19 3 BHK 109.4388703 H2001
19 3 BHK 109.4388703 H2002
19 4 BHK 153.3816425 H2003
19 3.5 BHK 121.8877741 H2004
19 2 BHK 64.28836864 H2005
19 1 BHK 43.1066518 H2006
19 NA 35.48866592 H2007
19 2 BHK 68.28316611 H2008
19 2.5 BHK 77.57339279 H2009
20 3 BHK 109.4388703 H2101
20 3 BHK 109.4388703 H2102
20 4 BHK 153.3816425 H2103
20 3.5 BHK 121.8877741 H2104
20 2 BHK 64.28836864 H2105
20 1 BHK 43.1066518 H2106
20 NA 35.48866592 H2107
20 2 BHK 68.28316611 H2108
20 2.5 BHK 77.57339279 H2109
21 3 BHK 109.4388703 H2201
21 3 BHK 109.4388703 H2202
21 4 BHK 153.3816425 H2203
21 3.5 BHK 121.8877741 H2204
21 2 BHK 64.28836864 H2205
21 1 BHK 43.1066518 H2206
21 NA 35.48866592 H2207
21 2 BHK 68.28316611 H2208
21 2.5 BHK 77.57339279 H2209
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 BUPL Balance Sheet FY 2024-25.Pdf
Fd 2 BUPL Balance Sheet FY 2023-24.Pdf
Fd 3 BUPL Balance Sheet FY 2022-23.Pdf
Fd 4 BUPL Profit & Loss - FY 2024-25.Pdf
Fd 5 BUPL Profit & Loss - FY 2023-24.Pdf
Fd 6 BUPL Profit & Loss - FY 2022-23.Pdf
Fd 7 ITR - FY 2023-24.Pdf
Fd 8 ITR - FY 2022-23.Pdf
Fd 9 ITR - FY 2021-22.Pdf
Fd 10 Directors Report FY 2023-24.Pdf
Fd 11 Directors Report FY 2022-23.Pdf
Fd 12 Directors Report FY 2021-22.Pdf
Fd 13 BUPL Cash Flow FY 2024-25.Pdf
Fd 14 BUPL Cash Flow FY 2023-24.Pdf
Fd 15 BUPL Cash Flow FY 2022-23.Pdf
Fd 16 BUPL Audit Report 2024-25.Pdf
Fd 17 BUPL Audit Report 2023-24.Pdf
Fd 18 BUPL Audit Report 2022-23.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Photo 1 Project Photo
Od 1 Reg Relinquishment Deed- Doc-1529-2025-26.Pdf
Od 2 18-Block-5-Wing8,9&10 Section.Pdf
Od 3 10-Block-10B-Floor Plans.Pdf
Od 4 18-Block-7B-Terrace Floor Section & Elevation.Pdf
Od 5 17-Block-7B-Ground ,First & Second Floor Plan.Pdf
Od 6 10-Block-10B-Floor Plans.Pdf
Od 7 12-Block-8-Floor Plans & Block 8-9-Section & Elevation.Pdf
Ed 1 25-08-2025
Ed 2 25-08-2025
Ed 3 25-08-2025
Ed 4 25-08-2025
Ed 5 25-08-2025
Ed 6 25-08-2025
Ed 7 25-08-2025
Ed 8 25-08-2025
Ed 9 25-08-2025
Ed 10 25-08-2025
Ed 11 25-08-2025
Ed 12 25-08-2025
Ed 13 25-08-2025
Ed 14 25-08-2025
Ed 15 25-08-2025
Ed 16 25-08-2025
Ed 17 25-08-2025
Ed 18 25-08-2025
Ed 19 03-09-2025
Ed 20 03-09-2025
Ed 21 03-09-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank STATE BANK OF INDIA
Account Number (RERA) 44349587460
IFSC SBIN0004196
Branch Address COMMERCIAL BRANCH
Country/City