Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential New Launch Source: rera.ka

SRK The Roots RERA Details - PRM/KA/RERA/1250/303/PR/090925/008075 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for SRK The Roots under registration PRM/KA/RERA/1250/303/PR/090925/008075 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1250/303/PR/090925/008075
  • Project Name THE ROOTS
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Rural
  • Taluka Devanahalli
  • Original Completion 30 July 2030
  • Documents 89 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 18 July 2025 Expected commencement of civil works and foundation on site.
Original Completion 30 July 2030 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

SRK INFRA PROJECTS PRIVATE LIMITED
Registered Address Unit No- 9B, 9C and 9D, 5th Floor, Vista Pixel, Jakkur Layout, Opposite to Pheonix Mall of Asia, Byatarayanapura, Yelahanka, Bengaluru, Karnataka 560092 ,Bengaluru North ,Bengaluru Urban-560092
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy No: 107,108/1 and 110/1, Panchayath Khata No. 279/107-279/108-1-279/110-1, PID No: 150300200401202316, , Sadahalli Village, Kasaba Hobli, Devanahalli Taluk, , Devanahalli , Bengaluru Rural, Karnataka - 562110

RERA Coordinates

Latitude, Longitude 13.213801, 77.653234
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BIAAPA/TP/CC-546/2024-25/2025-26
Authority BIAPPA - Bangalore Airport Area Planning Authority
Approved Date 18 July 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Block 2 1 4 0 26 Residential 12.0 4 13
Block 3A 1 4 0 10 Residential 12.0 4 5
Block 3B 1 4 0 10 Residential 12.0 4 5
Block 3C 1 4 0 10 Residential 12.0 4 5
Block 3D 1 4 0 10 Residential 12.0 4 5
Block 3E 1 4 0 10 Residential 12.0 4 5
Block 3F 1 4 0 10 Residential 12.0 4 5
Block 4 1 4 0 10 Residential 12.0 4 5
Block 5A 1 4 0 22 Residential 12.0 4 11
Block 5B 1 4 0 2 Residential 12.0 4 1
Block 6 1 4 0 32 Residential 12.0 4 16
Block 7A 1 4 0 12 Residential 12.0 4 6
Block 7B 1 4 0 12 Residential 12.0 4 6
Block 7C 1 4 0 12 Residential 12.0 4 6
Block 7D 1 4 0 12 Residential 12.0 4 6

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 1
Inventory Type RESIDENTIAL
Configuration Distribution
3 BHK 0 units
  • Block 2
  • Block 3A
  • Block 3B
  • Block 3C
  • Block 3D
  • Block 3E
  • Block 3F
  • Block 4
  • Block 5A
  • Block 5B
  • Block 6
  • Block 7A
  • Block 7B
  • Block 7C
  • Block 7D
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 227.44 1
-1 3 BHK 227.44 2
-1 3 BHK 227.44 3
-1 3 BHK 227.44 4
-1 3 BHK 227.44 5
-1 3 BHK 227.44 6
-1 3 BHK 227.44 7
-1 3 BHK 227.44 8
-1 3 BHK 227.44 9
-1 3 BHK 227.44 10
-1 3 BHK 227.44 11
-1 3 BHK 227.44 12
-1 3 BHK 227.44 13
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
1 Completion Certificate
3 Completion Certificate
4 Completion Certificate
5 Completion Certificate
Fd 1 BS.Pdf
Fd 2 BS.Pdf
Fd 3 BS- Fy 2021-22.Pdf
Fd 4 P&L.Pdf
Fd 5 P& L Statement.Pdf
Fd 6 P&L- Fy 2021-22.Pdf
Fd 7 ITRV.Pdf
Fd 8 ITRV Form.Pdf
Fd 9 ITRV - Ack - Fy 2021-22.Pdf
Fd 10 NA (1).Pdf
Fd 11 NA.Pdf
Fd 12 NA.Pdf
Fd 13 NA (1).Pdf
Fd 14 NA.Pdf
Fd 15 NA.Pdf
Fd 16 Auditor Repot.Pdf
Fd 17 Audit Report 22-23.Pdf
Fd 18 Audit Report - FY 2021-22.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Noc 8 Lift Authorities( Annexure - 102 )
Noc 9 BMRCL( Annexure - 103 )
Noc 10 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 11 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 12 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 13 Coastal Regulation Zone Authority( Annexure - 107 )
Photo 1 Project Photo
Od 1 The Roots - Development Plan - Approved -.Pdf
Od 2 Sadahalli Work Order.Pdf
Od 3 Basement Plan.Pdf
Od 4 Block-2.Pdf
Od 5 Block 3-A TO 3C.Pdf
Od 6 BLOCK-3D TO 3F.Pdf
Od 7 BLOCK NO -4.Pdf
Od 8 BLOCK 5A 5B.Pdf
Od 9 BLOCK 6.Pdf
Od 10 BLOCK 7A TO 7C .Pdf
Od 11 BLOCK 7D.Pdf
Od 12 Survey ADLR SKETCH.Pdf
Od 13 Sale Deed-820-97-98 (1).Pdf
Ed 1 25-08-2025
Ed 2 25-08-2025
Ed 3 25-08-2025
Ed 4 25-08-2025
Ed 5 25-08-2025
Ed 6 25-08-2025
Ed 7 25-08-2025
Ed 8 25-08-2025
Ed 9 25-08-2025
Ed 10 25-08-2025
Ed 11 25-08-2025
Ed 12 25-08-2025
Ed 13 25-08-2025
Ed 14 25-08-2025
Ed 15 08-09-2025
Ed 16 08-09-2025
Ed 17 08-09-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Axis Bank
Account Number (RERA) 922020045756590
IFSC UTIB0002596
Branch Address NEW BEL ROAD BANGALORE
Country/City