Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential New Launch Source: rera.ka

Bhartiya Garden Estate RERA Details - PRM/KA/RERA/1251/309/PR/060925/008065 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Bhartiya Garden Estate under registration PRM/KA/RERA/1251/309/PR/060925/008065 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/309/PR/060925/008065
  • Project Name Bhartiya Garden Estate Phase-3
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Bengaluru North
  • Original Completion 31 August 2031
  • Documents 69 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 September 2025 Expected commencement of civil works and foundation on site.
Original Completion 31 August 2031 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Bhartiya Urban Pvt Ltd
Registered Address Khatha No.6/2, Sy No.32/1 to 50, Bhartiya City, Discovery Centre, Thannisandra Main Road, Chokkanahalli, Yelahanka ,Bangalore North , Bangalore Urban ,Bengaluru North ,Bengaluru Urban-560064
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address PID No.150200200900420960, Sy No.12/1, 127/1, 127/2, 127/4, 127/5, 127/13, 127/14, 127/15 & 127/17 , Navarathna Agrahara, Jala Hobli, Yelahanka, Bengaluru North, Bengaluru , Bengaluru North , Bengaluru Urban, Karnataka - 562157

RERA Coordinates

Latitude, Longitude 13.198647778312976, 77.640380859375
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BIAAPA/TP/CC/219/2025-26
Authority BIAPPA - Bangalore Airport Area Planning Authority
Approved Date 06 August 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower E 2 25 0 226 Residential 68.1 22 203
Tower F 2 25 0 160 Residential 68.1 22 160
Tower G 2 25 0 180 Residential 68.1 22 180

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 7
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
5 BHK 0 units
Studio 0 units
LOFT 0 units
  • Tower E
  • Tower F
  • Tower G
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 2.5 BHK 77.57339279 E0003
-1 2 BHK 68.28316611 E0004
-1 Studio 35.48866592 E0005
-1 1 BHK 43.1066518 E0006
-1 2 BHK 64.28836864 E0007
-1 3.5 BHK 121.8877741 E0008
-1 4 BHK 153.3816425 E0009
GF 2.5 BHK 77.57339279 E0103
GF 2 BHK 68.28316611 E0104
GF Studio 35.48866592 E0105
GF 1 BHK 43.1066518 E0106
GF 2 BHK 64.28836864 E0107
GF 3.5 BHK 121.8877741 E0108
GF 4 BHK 153.3816425 E0109
1 3 BHK 109.4388703 E0201
1 3 BHK 109.4388703 E0202
1 2.5 BHK 77.57339279 E0203
1 2 BHK 68.28316611 E0204
1 Studio 35.48866592 E0205
1 1 BHK 43.1066518 E0206
1 2 BHK 64.28836864 E0207
1 3.5 BHK 121.8877741 E0208
1 4 BHK 153.3816425 E0209
2 3 BHK 109.4388703 E0301
2 3 BHK 109.4388703 E0302
2 2.5 BHK 77.57339279 E0303
2 2 BHK 68.28316611 E0304
2 Studio 35.48866592 E0305
2 1 BHK 43.1066518 E0306
2 2 BHK 64.28836864 E0307
2 3.5 BHK 121.8877741 E0308
2 4 BHK 153.3816425 E0309
3 3 BHK 109.4388703 E0401
3 3 BHK 109.4388703 E0402
3 2.5 BHK 77.57339279 E0403
3 2 BHK 68.28316611 E0404
3 Studio 35.48866592 E0405
3 1 BHK 43.1066518 E0406
3 2 BHK 64.28836864 E0407
3 3.5 BHK 121.8877741 E0408
3 4 BHK 153.3816425 E0409
4 3 BHK 109.4388703 E0501
4 3 BHK 109.4388703 E0502
4 2.5 BHK 77.57339279 E0503
4 2 BHK 68.28316611 E0504
4 Studio 35.48866592 E0505
4 1 BHK 43.1066518 E0506
4 2 BHK 64.28836864 E0507
4 3.5 BHK 121.8877741 E0508
4 4 BHK 153.3816425 E0509
5 3 BHK 109.4388703 E0601
5 3 BHK 109.4388703 E0602
5 2.5 BHK 77.57339279 E0603
5 2 BHK 68.28316611 E0604
5 Studio 35.48866592 E0605
5 1 BHK 43.1066518 E0606
5 2 BHK 64.28836864 E0607
5 3.5 BHK 121.8877741 E0608
5 4 BHK 153.3816425 E0609
6 3 BHK 109.4388703 E0701
6 3 BHK 109.4388703 E0702
6 2.5 BHK 77.57339279 E0703
6 2 BHK 68.28316611 E0704
6 Studio 35.48866592 E0705
6 1 BHK 43.1066518 E0706
6 2 BHK 64.28836864 E0707
6 3.5 BHK 121.8877741 E0708
6 4 BHK 153.3816425 E0709
7 3 BHK 109.4388703 E0801
7 3 BHK 109.4388703 E0802
7 2.5 BHK 77.57339279 E0803
7 2 BHK 68.28316611 E0804
7 Studio 35.48866592 E0805
7 1 BHK 43.1066518 E0806
7 2 BHK 64.28836864 E0807
7 3.5 BHK 121.8877741 E0808
7 4 BHK 153.3816425 E0809
8 3 BHK 109.4388703 E0901
8 3 BHK 109.4388703 E0902
8 2.5 BHK 77.57339279 E0903
8 2 BHK 68.28316611 E0904
8 Studio 35.48866592 E0905
8 1 BHK 43.1066518 E0906
8 2 BHK 64.28836864 E0907
8 3.5 BHK 121.8877741 E0908
8 4 BHK 153.3816425 E0909
9 3 BHK 109.4388703 E1001
9 3 BHK 109.4388703 E1002
9 2.5 BHK 77.57339279 E1003
9 2 BHK 68.28316611 E1004
9 Studio 35.48866592 E1005
9 1 BHK 43.1066518 E1006
9 2 BHK 64.28836864 E1007
9 3.5 BHK 121.8877741 E1008
9 4 BHK 153.3816425 E1009
10 3 BHK 109.4388703 E1101
10 3 BHK 109.4388703 E1102
10 2.5 BHK 77.57339279 E1103
10 2 BHK 68.28316611 E1104
10 Studio 35.48866592 E1105
10 1 BHK 43.1066518 E1106
10 2 BHK 64.28836864 E1107
10 3.5 BHK 121.8877741 E1108
10 4 BHK 153.3816425 E1109
11 3 BHK 109.4388703 E1201
11 3 BHK 109.4388703 E1202
11 2.5 BHK 77.57339279 E1203
11 2 BHK 68.28316611 E1204
11 Studio 35.48866592 E1205
11 1 BHK 43.1066518 E1206
11 2 BHK 64.28836864 E1207
11 3.5 BHK 121.8877741 E1208
11 4 BHK 153.3816425 E1209
12 3 BHK 109.4388703 E1301
12 3 BHK 109.4388703 E1302
12 2.5 BHK 77.57339279 E1303
12 2 BHK 68.28316611 E1304
12 Studio 35.48866592 E1305
12 1 BHK 43.1066518 E1306
12 2 BHK 64.28836864 E1307
12 3.5 BHK 121.8877741 E1308
12 4 BHK 153.3816425 E1309
13 3 BHK 109.4388703 E1401
13 3 BHK 109.4388703 E1402
13 2.5 BHK 77.57339279 E1403
13 2 BHK 68.28316611 E1404
13 Studio 35.48866592 E1405
13 1 BHK 43.1066518 E1406
13 2 BHK 64.28836864 E1407
13 3.5 BHK 121.8877741 E1408
13 4 BHK 153.3816425 E1409
14 3 BHK 109.4388703 E1501
14 3 BHK 109.4388703 E1502
14 2.5 BHK 77.57339279 E1503
14 2 BHK 68.28316611 E1504
14 Studio 35.48866592 E1505
14 1 BHK 43.1066518 E1506
14 2 BHK 64.28836864 E1507
14 3.5 BHK 121.8877741 E1508
14 4 BHK 153.3816425 E1509
15 3 BHK 109.4388703 E1601
15 3 BHK 109.4388703 E1602
15 2.5 BHK 77.57339279 E1603
15 2 BHK 68.28316611 E1604
15 Studio 35.48866592 E1605
15 1 BHK 43.1066518 E1606
15 2 BHK 64.28836864 E1607
15 3.5 BHK 121.8877741 E1608
15 4 BHK 153.3816425 E1609
16 3 BHK 109.4388703 E1701
16 3 BHK 109.4388703 E1702
16 2.5 BHK 77.57339279 E1703
16 2 BHK 68.28316611 E1704
16 Studio 35.48866592 E1705
16 1 BHK 43.1066518 E1706
16 2 BHK 64.28836864 E1707
16 3.5 BHK 121.8877741 E1708
16 4 BHK 153.3816425 E1709
17 3 BHK 109.4388703 E1801
17 3 BHK 109.4388703 E1802
17 2.5 BHK 77.57339279 E1803
17 2 BHK 68.28316611 E1804
17 Studio 35.48866592 E1805
17 1 BHK 43.1066518 E1806
17 2 BHK 64.28836864 E1807
17 3.5 BHK 121.8877741 E1808
17 4 BHK 153.3816425 E1809
18 3 BHK 109.4388703 E1901
18 3 BHK 109.4388703 E1902
18 2.5 BHK 77.57339279 E1903
18 2 BHK 68.28316611 E1904
18 Studio 35.48866592 E1905
18 1 BHK 43.1066518 E1906
18 2 BHK 64.28836864 E1907
18 3.5 BHK 121.8877741 E1908
18 4 BHK 153.3816425 E1909
19 3 BHK 109.4388703 E2001
19 3 BHK 109.4388703 E2002
19 2.5 BHK 77.57339279 E2003
19 2 BHK 68.28316611 E2004
19 Studio 35.48866592 E2005
19 1 BHK 43.1066518 E2006
19 2 BHK 64.28836864 E2007
19 3.5 BHK 121.8877741 E2008
19 4 BHK 153.3816425 E2009
20 3 BHK 109.4388703 E2101
20 3 BHK 109.4388703 E2102
20 2.5 BHK 77.57339279 E2103
20 2 BHK 68.28316611 E2104
20 Studio 35.48866592 E2105
20 1 BHK 43.1066518 E2106
20 2 BHK 64.28836864 E2107
20 3.5 BHK 121.8877741 E2108
20 4 BHK 153.3816425 E2109
21 3 BHK 109.4388703 E2201
21 3 BHK 109.4388703 E2202
21 2.5 BHK 77.57339279 E2203
21 2 BHK 68.28316611 E2204
21 Studio 35.48866592 E2205
21 1 BHK 43.1066518 E2206
21 2 BHK 64.28836864 E2207
21 3.5 BHK 121.8877741 E2208
21 4 BHK 153.3816425 E2209
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 BUPL Balance Sheet FY 2024-25.Pdf
Fd 2 BUPL Balance Sheet FY 2023-24.Pdf
Fd 3 BUPL Balance Sheet FY 2022-23.Pdf
Fd 4 BUPL Profit & Loss - FY 2024-25.Pdf
Fd 5 BUPL Profit & Loss - FY 2023-24.Pdf
Fd 6 BUPL Profit & Loss - FY 2022-23.Pdf
Fd 7 ITR - FY 2023-24.Pdf
Fd 8 ITR - FY 2022-23.Pdf
Fd 9 ITR - FY 2021-22.Pdf
Fd 10 Directors Report FY 2023-24.Pdf
Fd 11 Directors Report FY 2022-23.Pdf
Fd 12 Directors Report FY 2021-22.Pdf
Fd 13 BUPL Cash Flow FY 2024-25.Pdf
Fd 14 BUPL Cash Flow FY 2023-24.Pdf
Fd 15 BUPL Cash Flow FY 2022-23.Pdf
Fd 16 BUPL Audit Report 2024-25.Pdf
Fd 17 BUPL Audit Report 2023-24.Pdf
Fd 18 BUPL Audit Report 2022-23.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Photo 1 Project Photo
Od 1 Reg Relinquishment Deed- Doc-1529-2025-26.Pdf
Ed 1 25-08-2025
Ed 2 25-08-2025
Ed 3 25-08-2025
Ed 4 25-08-2025
Ed 5 25-08-2025
Ed 6 25-08-2025
Ed 7 25-08-2025
Ed 8 25-08-2025
Ed 9 25-08-2025
Ed 10 25-08-2025
Ed 11 25-08-2025
Ed 12 25-08-2025
Ed 13 25-08-2025
Ed 14 25-08-2025
Ed 15 25-08-2025
Ed 16 25-08-2025
Ed 17 25-08-2025
Ed 18 25-08-2025
Ed 19 03-09-2025
Ed 20 03-09-2025
Ed 21 03-09-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank STATE BANK OF INDIA
Account Number (RERA) 44349567498
IFSC SBIN0004196
Branch Address Commercial Branch
Country/City