residential Under Construction Source: rera.ka

Bhartiya City Nikoo Homes 5 RERA Details - PRM/KA/RERA/1251/309/PR/271123/006444 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Bhartiya City Nikoo Homes 5 under registration PRM/KA/RERA/1251/309/PR/271123/006444 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/309/PR/271123/006444
  • Project Name Nikoo Homes V - Phase - 2
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru North
  • Original Completion 30 June 2030
  • Documents 86 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 October 2024 Expected commencement of civil works and foundation on site.
Original Completion 30 June 2030 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Bhartiya Urban Private Limited
Registered Address No.1/5,Palace Road ,Bengaluru North ,Bengaluru Urban-560001
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Khata No: 6/1, Sy. No. 45/1, 45/2, 46 , Chokkanahalli Village, Hegde Nagar, Thanisandra Main Road , Bengaluru North , Bengaluru Urban, Karnataka - 560064

RERA Coordinates

Latitude, Longitude 13.0793339, 77.64210179999999
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Add.Dir/JDNorth/LP/25/2010-11
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 03 November 2023

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower - 1 3 39 3 284 Residential 118.63 38 284
Tower - 2 3 39 3 284 Residential 118.63 38 284

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 4
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
5 BHK 0 units
  • Tower - 1
  • Tower - 2
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
2 3 BHK 101.36 10303
2 3 BHK 94.3 10304
2 2.5 BHK 78.5 10305
2 2.5 BHK 78.5 10306
2 3.5 BHK 112.32 10307
2 3.5 BHK 112.32 10308
3 3 BHK 101.36 10403
3 3 BHK 94.3 10404
3 2.5 BHK 78.5 10405
3 2.5 BHK 78.5 10406
3 3.5 BHK 112.32 10407
3 3.5 BHK 112.32 10408
4 3 BHK 94.67 10501
4 3 BHK 94.67 10502
4 3 BHK 101.36 10503
4 3 BHK 94.3 10504
4 2.5 BHK 78.5 10505
4 2.5 BHK 78.5 10506
4 3.5 BHK 112.32 10507
4 3.5 BHK 112.32 10508
5 3 BHK 94.67 10601
5 3 BHK 94.67 10602
5 3 BHK 101.36 10603
5 3 BHK 94.3 10604
5 2.5 BHK 78.5 10605
5 2.5 BHK 78.5 10606
5 3.5 BHK 112.32 10607
5 3.5 BHK 112.32 10608
6 3 BHK 94.67 10701
6 3 BHK 94.67 10702
6 3 BHK 101.36 10703
6 3 BHK 94.3 10704
6 2.5 BHK 78.5 10705
6 2.5 BHK 78.5 10706
6 3.5 BHK 112.32 10707
6 3.5 BHK 112.32 10708
7 3 BHK 94.67 10801
7 3 BHK 94.67 10802
7 3 BHK 101.36 10803
7 3 BHK 94.3 10804
7 2.5 BHK 78.5 10805
7 2.5 BHK 78.5 10806
7 3.5 BHK 112.32 10807
7 3.5 BHK 112.32 10808
8 3 BHK 94.67 10901
8 3 BHK 94.67 10902
8 3 BHK 101.36 10903
8 3 BHK 94.3 10904
8 2.5 BHK 78.5 10905
8 2.5 BHK 78.5 10906
8 3.5 BHK 112.32 10907
8 3.5 BHK 112.32 10908
9 3 BHK 94.67 11001
9 3 BHK 94.67 11002
9 3 BHK 101.36 11003
9 3 BHK 94.3 11004
9 2.5 BHK 78.5 11005
9 2.5 BHK 78.5 11006
9 3.5 BHK 112.32 11007
9 3.5 BHK 112.32 11008
10 3 BHK 94.67 11101
10 3 BHK 94.67 11102
10 3 BHK 101.36 11103
10 3 BHK 94.3 11104
10 2.5 BHK 78.5 11105
10 2.5 BHK 78.5 11106
10 3.5 BHK 112.32 11107
10 3.5 BHK 112.32 11108
11 3 BHK 94.67 11201
11 3 BHK 94.67 11202
11 3 BHK 101.36 11203
11 3 BHK 94.3 11204
11 2.5 BHK 78.5 11205
11 2.5 BHK 78.5 11206
11 3.5 BHK 112.32 11207
11 3.5 BHK 112.32 11208
12 3 BHK 94.67 11301
12 3 BHK 94.67 11302
12 3 BHK 101.36 11303
12 3 BHK 94.3 11304
12 2.5 BHK 78.5 11305
12 2.5 BHK 78.5 11306
12 3.5 BHK 112.32 11307
12 3.5 BHK 112.32 11308
13 3 BHK 94.67 11401
13 3 BHK 94.67 11402
13 3 BHK 101.36 11403
13 3 BHK 94.3 11404
13 2.5 BHK 78.5 11405
13 2.5 BHK 78.5 11406
13 3.5 BHK 112.32 11407
13 3.5 BHK 112.32 11408
14 3 BHK 94.67 11501
14 3 BHK 94.67 11502
14 3 BHK 101.36 11503
14 3 BHK 94.3 11504
14 2.5 BHK 78.5 11505
14 2.5 BHK 78.5 11506
14 3.5 BHK 112.32 11507
14 3.5 BHK 112.32 11508
15 3 BHK 94.67 11601
15 3 BHK 94.67 11602
15 3 BHK 101.36 11603
15 3 BHK 94.3 11604
15 2.5 BHK 78.5 11605
15 2.5 BHK 78.5 11606
15 3.5 BHK 112.32 11607
15 3.5 BHK 112.32 11608
16 3 BHK 94.67 11701
16 3 BHK 94.67 11702
16 3 BHK 101.36 11703
16 3 BHK 94.3 11704
16 2.5 BHK 78.5 11705
16 2.5 BHK 78.5 11706
16 3.5 BHK 112.32 11707
16 3.5 BHK 112.32 11708
17 3 BHK 94.67 11801
17 3 BHK 94.67 11802
17 3 BHK 101.36 11803
17 3 BHK 94.3 11804
17 2.5 BHK 78.5 11805
17 2.5 BHK 78.5 11806
17 3.5 BHK 112.32 11807
17 3.5 BHK 112.32 11808
18 3 BHK 94.67 11901
18 3 BHK 94.67 11902
18 3 BHK 101.36 11903
18 3 BHK 94.3 11904
18 2.5 BHK 78.5 11905
18 2.5 BHK 78.5 11906
18 3.5 BHK 112.32 11907
18 3.5 BHK 112.32 11908
19 3 BHK 94.67 12001
19 3 BHK 94.67 12002
19 3 BHK 101.36 12003
19 3 BHK 94.3 12004
19 2.5 BHK 78.5 12005
19 2.5 BHK 78.5 12006
19 3.5 BHK 112.32 12007
19 3.5 BHK 112.32 12008
20 3 BHK 94.67 12101
20 3 BHK 94.67 12102
20 3 BHK 101.36 12103
20 3 BHK 94.3 12104
20 2.5 BHK 78.5 12105
20 2.5 BHK 78.5 12106
20 3.5 BHK 112.32 12107
20 3.5 BHK 112.32 12108
21 3 BHK 94.67 12201
21 3 BHK 94.67 12202
21 3 BHK 101.36 12203
21 3 BHK 94.3 12204
21 2.5 BHK 78.5 12205
21 2.5 BHK 78.5 12206
21 3.5 BHK 112.32 12207
21 3.5 BHK 112.32 12208
22 3 BHK 94.67 12301
22 3 BHK 94.67 12302
22 3 BHK 101.36 12303
22 3 BHK 94.3 12304
22 2.5 BHK 78.5 12305
22 2.5 BHK 78.5 12306
22 3.5 BHK 112.32 12307
22 3.5 BHK 112.32 12308
23 3 BHK 94.67 12401
23 3 BHK 94.67 12402
23 3 BHK 101.36 12403
23 3 BHK 94.3 12404
23 2.5 BHK 78.5 12405
23 2.5 BHK 78.5 12406
23 3.5 BHK 112.32 12407
23 3.5 BHK 112.32 12408
24 3 BHK 94.67 12501
24 3 BHK 94.67 12502
24 3 BHK 101.36 12503
24 3 BHK 94.3 12504
24 2.5 BHK 78.5 12505
24 2.5 BHK 78.5 12506
24 3.5 BHK 112.32 12507
24 3.5 BHK 112.32 12508
25 3 BHK 94.67 12601
25 3 BHK 94.67 12602
25 3 BHK 101.36 12603
25 3 BHK 94.3 12604
25 2.5 BHK 78.5 12605
25 2.5 BHK 78.5 12606
25 3.5 BHK 112.32 12607
25 3.5 BHK 112.32 12608
26 3 BHK 94.67 12701
26 3 BHK 94.67 12702
26 3 BHK 101.36 12703
26 3 BHK 94.3 12704
26 2.5 BHK 78.5 12705
26 2.5 BHK 78.5 12706
26 3.5 BHK 112.32 12707
26 3.5 BHK 112.32 12708
27 3 BHK 94.67 12801
27 3 BHK 94.67 12802
27 3 BHK 101.36 12803
27 3 BHK 94.3 12804
27 2.5 BHK 78.5 12805
27 2.5 BHK 78.5 12806
27 3.5 BHK 112.32 12807
27 3.5 BHK 112.32 12808
28 3 BHK 94.67 12901
28 3 BHK 94.67 12902
28 3 BHK 101.36 12903
28 3 BHK 94.3 12904
28 2.5 BHK 78.5 12905
28 2.5 BHK 78.5 12906
28 3.5 BHK 112.32 12907
28 3.5 BHK 112.32 12908
29 3 BHK 94.67 13001
29 3 BHK 94.67 13002
29 3 BHK 101.36 13003
29 3 BHK 94.3 13004
29 2.5 BHK 78.5 13005
29 2.5 BHK 78.5 13006
29 3.5 BHK 112.32 13007
29 3.5 BHK 112.32 13008
30 3 BHK 94.67 13101
30 3 BHK 94.67 13102
30 3 BHK 101.36 13103
30 3 BHK 94.3 13104
30 2.5 BHK 78.5 13105
30 2.5 BHK 78.5 13106
30 3.5 BHK 112.32 13107
30 3.5 BHK 112.32 13108
31 3 BHK 94.67 13201
31 3 BHK 94.67 13202
31 3 BHK 101.36 13203
31 3 BHK 94.3 13204
31 2.5 BHK 78.5 13205
31 2.5 BHK 78.5 13206
31 3.5 BHK 112.32 13207
31 3.5 BHK 112.32 13208
32 3 BHK 94.67 13301
32 3 BHK 94.67 13302
32 3 BHK 101.36 13303
32 3 BHK 94.3 13304
32 2.5 BHK 78.5 13305
32 2.5 BHK 78.5 13306
32 3.5 BHK 112.32 13307
32 3.5 BHK 112.32 13308
33 3 BHK 94.67 13401
33 3 BHK 94.67 13402
33 3 BHK 101.36 13403
33 3 BHK 94.3 13404
33 2.5 BHK 78.5 13405
33 2.5 BHK 78.5 13406
33 3.5 BHK 112.32 13407
33 3.5 BHK 112.32 13408
34 3 BHK 94.67 13501
34 3 BHK 94.67 13502
34 3 BHK 101.36 13503
34 3 BHK 94.3 13504
34 2.5 BHK 78.5 13505
34 2.5 BHK 78.5 13506
34 3.5 BHK 112.32 13507
34 3.5 BHK 112.32 13508
35 3 BHK 94.67 13601
35 3 BHK 94.67 13602
35 3 BHK 101.36 13603
35 3 BHK 94.3 13604
35 2.5 BHK 78.5 13605
35 2.5 BHK 78.5 13606
35 3.5 BHK 112.32 13607
35 3.5 BHK 112.32 13608
36 3 BHK 94.67 13701
36 3 BHK 94.67 13702
36 3 BHK 101.36 13703
36 3 BHK 94.3 13704
36 2.5 BHK 78.5 13705
36 2.5 BHK 78.5 13706
36 3.5 BHK 112.32 13707
36 3.5 BHK 112.32 13708
37 3 BHK 94.67 13801
37 3 BHK 94.67 13802
37 3 BHK 101.36 13803
37 3 BHK 94.3 13804
37 2.5 BHK 78.5 13805
37 2.5 BHK 78.5 13806
37 3.5 BHK 112.32 13807
37 3.5 BHK 112.32 13808
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
1 Completion Certificate
2 Completion Certificate
3 Completion Certificate
4 Completion Certificate
Fd 1 Annexure 60 BS 2020-21.Pdf
Fd 2 Annexure 60 BS 2021-22.Pdf
Fd 3 Annexure 60 BS 2022-23.Pdf
Fd 4 Annexure 61 PL 2020-21.Pdf
Fd 5 Annexure 61 PL 2021-22.Pdf
Fd 6 Annexure 61 PL 2022-23.Pdf
Fd 7 Annexure 62 DR 2020-21.Pdf
Fd 8 Annexure 62 DR 2021-22.Pdf
Fd 9 Annexure 62 DR 2022-23.Pdf
Fd 10 Annexure 63 CFS 2020-21.Pdf
Fd 11 Annexure 63 CFS 2021-22.Pdf
Fd 12 Annexure 63 CFS 2022-23.Pdf
Fd 13 Annexure 64 AR 2020-21.Pdf
Fd 14 Annexure 64 AR 2021-22.Pdf
Fd 15 Annexure 64 AR 2022-23.Pdf
Fd 16 Annexure 65 ITR 2020-21.Pdf
Fd 17 Annexure 65 ITR 2021-22.Pdf
Fd 18 Annexure 65 ITR 2022-23.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 Master Plan Extract Thanisanda CDP.Pdf
Od 2 Village Map.Pdf
Od 3 Commencement Certificate.Pdf
Od 4 BDA Work Order.Pdf
Od 5 DC Nala Change Order.Pdf
Od 6 Phase-Wise Demarcation With Area (BBMP Approved Plan Demarcated).Pdf
Od 7 Apartment Typewise Details - Ph2.Pdf
Od 8 Basement-1 Plan.Pdf
Od 9 Basement-2 Plan.Pdf
Od 10 Basement-3 Plan.Pdf
Od 11 Elevation-1.Pdf
Od 12 Elevation-2.Pdf
Od 13 Elevation-3.Pdf
Od 14 Elevation-4.Pdf
Od 15 Ground Floor Plan.Pdf
Od 16 1st Floor Plan.Pdf
Od 17 2nd Floor Plan.Pdf
Od 18 3rd Floor Plan.Pdf
Od 19 4th Floor Plan.Pdf
Od 20 LMR Plan.Pdf
Od 21 Refuge Floor Plan.Pdf
Od 22 Typical Floor Plan- Lower Level.Pdf
Od 23 Typical Floor Plan- Upper Level.Pdf
Od 24 Terrace Floor Plan.Pdf
Od 25 Engineer Attested Carpet Area - Ph2.Pdf
Od 26 Certificate Of Incorporation - BUPL.Pdf
Od 27 Final Notification For Acquisition Of PRR - Sy No 45 (5A 30G).Pdf
Od 28 Khatha Clarification With Sy Nos.Pdf
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 57500001350740
IFSC HDFC0000523
Branch Address Richmond Road, Bengaluru
Country/City