Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential New Launch Source: rera.ka

Mythri Sity RERA Details - PRM/KA/RERA/1251/446/PR/300525/007802 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Mythri Sity under registration PRM/KA/RERA/1251/446/PR/300525/007802 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/300525/007802
  • Project Name MYTHRI SITY
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 01 August 2029
  • Documents 111 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 03 May 2025 Expected commencement of civil works and foundation on site.
Original Completion 01 August 2029 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

MYTHRI BUILDERS
Registered Address #2802, Broadway Building, 27th MainRoad, Sector 1 ,HSR Layout, Bengaluru South ,Bengaluru South ,Bengaluru Urban-560102
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Survey No. 67/2 Kodathi Village, Varthur Hobli , Bangalore East Taluk , Bengaluru East , Bengaluru Urban, Karnataka - 560087

RERA Coordinates

Latitude, Longitude 12.885437130363835, 77.70161159277507
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BDA/Plan Sanction/EM/EO-01/TA-2/East/05/2025-06
Authority BDA - Bangalore Development Authority
Approved Date 03 May 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Mythri Sity_Tower-1 1 19 1 211 Residential 57.0 18 226
Mythri Sity_Tower-2 1 19 1 212 Residential 57.0 18 242

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 5
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
EWS 0 units
  • Mythri Sity_Tower-1
  • Mythri Sity_Tower-2
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 84.23611866 A-101
GF 1 BHK 46.60759891 A-102
GF EWS 16.3212067 A-102A
GF 3 BHK 84.28814436 A-103
GF 2 BHK 64.88348565 A-104
GF 2 BHK 67.13638446 A-105
GF 3 BHK 84.74810733 A-106
GF 3 BHK 85.376039 B-101
GF 3 BHK 83.45944922 B-102
GF 2 BHK 64.89277595 B-103
GF 3 BHK 86.28184368 B-104
GF 2 BHK 65.41674912 B-105
GF 2 BHK 69.34283174 B-106
1 3 BHK 84.23611866 A-201
1 1 BHK 46.60759891 A-202
1 EWS 16.3212067 A-202A
1 3 BHK 84.28814436 A-203
1 2 BHK 64.88348565 A-204
1 2 BHK 67.13638446 A-205
1 3 BHK 84.74810733 A-206
1 3 BHK 85.376039 B-201
1 3 BHK 83.45944922 B-202
1 2 BHK 64.89277595 B-203
1 3 BHK 86.28184368 B-204
1 2 BHK 65.41674912 B-205
1 2 BHK 69.34283174 B-206
2 3 BHK 84.23611866 A-301
2 1 BHK 46.60759891 A-302
2 EWS 16.3212067 A-302A
2 3 BHK 84.28814436 A-303
2 2 BHK 64.88348565 A-304
2 2 BHK 67.13638446 A-305
2 3 BHK 84.74810733 A-306
2 3 BHK 85.376039 B-301
2 3 BHK 83.45944922 B-302
2 2 BHK 64.89277595 B-303
2 3 BHK 86.28184368 B-304
2 2 BHK 65.41674912 B-305
2 2 BHK 69.34283174 B-306
3 3 BHK 84.23611866 A-401
3 1 BHK 46.60759891 A-402
3 EWS 16.3212067 A-402A
3 3 BHK 84.28814436 A-403
3 2 BHK 64.88348565 A-404
3 2 BHK 67.13638446 A-405
3 3 BHK 84.74810733 A-406
3 3 BHK 85.376039 B-401
3 3 BHK 83.45944922 B-402
3 2 BHK 64.89277595 B-403
3 3 BHK 86.28184368 B-404
3 2 BHK 65.41674912 B-405
3 2 BHK 69.34283174 B-406
4 3 BHK 84.23611866 A-501
4 1 BHK 46.60759891 A-502
4 EWS 16.3212067 A-502A
4 3 BHK 84.28814436 A-503
4 2 BHK 64.88348565 A-504
4 2 BHK 67.13638446 A-505
4 3 BHK 84.74810733 A-506
4 3 BHK 85.376039 B-501
4 3 BHK 83.45944922 B-502
4 2 BHK 64.89277595 B-503
4 3 BHK 86.28184368 B-504
4 2 BHK 65.41674912 B-505
4 2 BHK 69.34283174 B-506
5 3 BHK 84.23611866 A-601
5 1 BHK 46.60759891 A-602
5 EWS 16.3212067 A-602A
5 3 BHK 84.28814436 A-603
5 2 BHK 64.88348565 A-604
5 2 BHK 67.13638446 A-605
5 3 BHK 84.74810733 A-606
5 3 BHK 85.376039 B-601
5 3 BHK 83.45944922 B-602
5 2 BHK 64.89277595 B-603
5 3 BHK 86.28184368 B-604
5 2 BHK 65.41674912 B-605
5 2 BHK 69.34283174 B-606
6 3 BHK 84.23611866 A-701
6 1 BHK 46.60759891 A-702
6 EWS 16.3212067 A-702A
6 3 BHK 84.28814436 A-703
6 2 BHK 64.88348565 A-704
6 2 BHK 67.13638446 A-705
6 3 BHK 84.74810733 A-706
6 3 BHK 85.376039 B-701
6 3 BHK 83.45944922 B-702
6 2 BHK 64.89277595 B-703
6 3 BHK 86.28184368 B-704
6 2 BHK 65.41674912 B-705
6 2 BHK 69.34283174 B-706
7 3 BHK 84.23611866 A-801
7 1 BHK 46.60759891 A-802
7 EWS 16.3212067 A-802A
7 3 BHK 84.28814436 A-803
7 2 BHK 64.88348565 A-804
7 2 BHK 67.13638446 A-805
7 3 BHK 84.74810733 A-806
7 3 BHK 85.376039 B-801
7 3 BHK 83.45944922 B-802
7 2 BHK 64.89277595 B-803
7 3 BHK 86.28184368 B-804
7 2 BHK 65.41674912 B-805
7 2 BHK 69.34283174 B-806
8 3 BHK 84.23611866 A-901
8 1 BHK 46.60759891 A-902
8 EWS 16.3212067 A-902A
8 3 BHK 84.28814436 A-903
8 2 BHK 64.88348565 A-904
8 2 BHK 67.13638446 A-905
8 3 BHK 84.74810733 A-906
8 3 BHK 85.376039 B-901
8 3 BHK 83.45944922 B-902
8 2 BHK 64.89277595 B-903
8 3 BHK 86.28184368 B-904
8 2 BHK 65.41674912 B-905
8 2 BHK 69.34283174 B-906
9 3 BHK 84.23611866 A-1001
9 1 BHK 46.60759891 A-1002
9 EWS 16.3212067 A-1002A
9 3 BHK 84.28814436 A-1003
9 2 BHK 64.88348565 A-1004
9 2 BHK 67.13638446 A-1005
9 3 BHK 84.74810733 A-1006
9 3 BHK 85.376039 B-1001
9 3 BHK 83.45944922 B-1002
9 2 BHK 64.89277595 B-1003
9 3 BHK 86.28184368 B-1004
9 2 BHK 65.41674912 B-1005
9 2 BHK 69.34283174 B-1006
10 3 BHK 84.23611866 A-1101
10 1 BHK 46.60759891 A-1102
10 EWS 16.3212067 A-1102A
10 3 BHK 84.28814436 A-1103
10 2 BHK 64.88348565 A-1104
10 2 BHK 67.13638446 A-1105
10 3 BHK 84.74810733 A-1106
10 3 BHK 85.376039 B-1101
10 3 BHK 83.45944922 B-1102
10 2 BHK 64.89277595 B-1103
10 3 BHK 86.28184368 B-1104
10 2 BHK 65.41674912 B-1105
10 2 BHK 69.34283174 B-1106
11 3 BHK 84.23611866 A-1201
11 1 BHK 46.60759891 A-1202
11 EWS 16.3212067 A-1202A
11 3 BHK 84.28814436 A-1203
11 2 BHK 64.88348565 A-1204
11 2 BHK 67.13638446 A-1205
11 3 BHK 84.74810733 A-1206
11 3 BHK 85.376039 B-1201
11 3 BHK 83.45944922 B-1202
11 2 BHK 64.89277595 B-1203
11 3 BHK 86.28184368 B-1204
11 2 BHK 65.41674912 B-1205
11 2 BHK 69.34283174 B-1206
12 3 BHK 84.23611866 A-1301
12 1 BHK 46.60759891 A-1302
12 EWS 16.3212067 A-1302A
12 3 BHK 84.28814436 A-1303
12 2 BHK 64.88348565 A-1304
12 2 BHK 67.13638446 A-1305
12 3 BHK 84.74810733 A-1306
12 3 BHK 85.376039 B-1301
12 3 BHK 83.45944922 B-1302
12 2 BHK 64.89277595 B-1303
12 3 BHK 86.28184368 B-1304
12 2 BHK 65.41674912 B-1305
12 2 BHK 69.34283174 B-1306
13 3 BHK 84.23611866 A-1401
13 1 BHK 46.60759891 A-1402
13 EWS 16.3212067 A-1402A
13 3 BHK 84.28814436 A-1403
13 2 BHK 64.88348565 A-1404
13 2 BHK 67.13638446 A-1405
13 3 BHK 84.74810733 A-1406
13 3 BHK 85.376039 B-1401
13 3 BHK 83.45944922 B-1402
13 2 BHK 64.89277595 B-1403
13 3 BHK 86.28184368 B-1404
13 2 BHK 65.41674912 B-1405
13 2 BHK 69.34283174 B-1406
14 3 BHK 84.23611866 A-1501
14 1 BHK 46.60759891 A-1502
14 EWS 16.3212067 A-1502A
14 3 BHK 84.28814436 A-1503
14 2 BHK 64.88348565 A-1504
14 2 BHK 67.13638446 A-1505
14 3 BHK 84.74810733 A-1506
14 3 BHK 85.376039 B-1501
14 3 BHK 83.45944922 B-1502
14 2 BHK 64.89277595 B-1503
14 3 BHK 86.28184368 B-1504
14 2 BHK 65.41674912 B-1505
14 2 BHK 69.34283174 B-1506
15 3 BHK 84.23611866 A-1601
15 2 BHK 64.37484148 A-1602
15 3 BHK 84.28814436 A-1603
15 2 BHK 64.88348565 A-1604
15 2 BHK 67.13638446 A-1605
15 3 BHK 84.74810733 A-1606
15 3 BHK 85.376039 B-1601
15 3 BHK 83.45944922 B-1602
15 2 BHK 64.89277595 B-1603
15 3 BHK 86.28184368 B-1604
15 2 BHK 65.41674912 B-1605
15 2 BHK 69.34283174 B-1606
16 3 BHK 84.23611866 A-1701
16 2 BHK 64.37484148 A-1702
16 3 BHK 84.28814436 A-1703
16 2 BHK 64.88348565 A-1704
16 2 BHK 67.13638446 A-1705
16 3 BHK 84.74810733 A-1706
16 3 BHK 85.376039 B-1701
16 3 BHK 83.45944922 B-1702
16 2 BHK 64.89277595 B-1703
16 3 BHK 86.28184368 B-1704
16 2 BHK 65.41674912 B-1705
16 2 BHK 69.34283174 B-1706
17 4 BHK 148.1153224 A-1801
17 2 BHK 67.13638446 A-1802
17 3 BHK 116.6555648 A-1803
17 3 BHK 131.2292652 B-1801
17 3 BHK 121.6602517 B-1802
17 2 BHK 65.41674912 B-1803
17 2 BHK 69.30938664 B-1804
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 BS -2023-24.Pdf
Fd 2 BS -2022-23.Pdf
Fd 3 BS 2021-22.Pdf
Fd 4 PL-2023-24.Pdf
Fd 5 PL-2022-23.Pdf
Fd 6 PL -2021-22.Pdf
Fd 7 ITR-2023-24.Pdf
Fd 8 ITR 2021-22.Pdf
Fd 9 ITR 2021-22.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Noc 8 Lift Authorities( Annexure - 102 )
Noc 9 BMRCL( Annexure - 103 )
Noc 10 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 11 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 13 Coastal Regulation Zone Authority( Annexure - 107 )
Photo 1 Project Photo
Od 1 01 OF 05 Mythri Sity Floor Plans Compressed.Pdf
Od 2 02 OF 05 Mythri Sity Floor Plans Compressed.Pdf
Od 3 03 OF 05 Mythri Sity Floor Plans Compressed.Pdf
Od 4 04 OF 05 Mythri Sity Floor Plans Compressed.Pdf
Od 5 05 OF 05 Mythri Sity Floor Plans Compressed.Pdf
Od 6 Village Map.Pdf
Od 7 Specifications.Pdf
Od 8 Road NOC.Pdf
Od 9 Mythri Sity SEIAA NOC.Pdf
Od 10 My3 Sity Licence Copy.Pdf
Od 11 BS 2021-22.Pdf
Od 12 BS -2022-23.Pdf
Od 13 BS -2023-24.Pdf
Od 14 Form-1 CA Certificate.Pdf
Od 15 My3Sity Source Of Funds.Pdf
Od 16 PL-2023-24.Pdf
Od 17 PL-2022-23.Pdf
Od 18 PL -2021-22.Pdf
Od 19 Allotment Letter.Pdf
Od 20 Clarification About Non Production Of Brochures.Pdf
Od 21 Clarification For No Of Parking.Pdf
Od 22 Clarification For Single Plot Layout.Pdf
Od 23 Clarification For Single Plot Order.Pdf
Od 24 Clarification Of Hight Of The Building.Pdf
Od 25 Common Area Clarification.Pdf
Od 26 FAR Clarification.Pdf
Od 27 Affidavit For Non-Litigation Details-Without JD.Pdf
Od 28 Notarized Affidavit For SECTION 3(1) Voliation.Pdf
Od 29 Legal Report.Pdf
Od 30 AOS As Per RERA.Pdf
Od 31 My3SITY Certificate For Structural Safety Of Building.Pdf
Od 32 Affidavit - Non Litigation.Pdf
Od 33 Form-B.Pdf
Od 34 EC 2004 To Till Date.Pdf
Od 35 EC Sy No 67-2 From 1-04-2025 To 29-05-2025.Pdf
Od 36 EC Sy No 67-2 From 1-4-2004 To 7-04-2025.Pdf
Od 37 RTC 2004 To Till Date.Pdf
Od 38 RTC 1.Pdf
Od 39 RTC 2001 To 2024.Pdf
Od 40 Conversion Skecth Copy.Pdf
Od 41 Conversion Skecth Copy1.Pdf
Od 42 Endoresment For Aakarbandh.Pdf
Od 43 Hissa Copy.Pdf
Od 44 Katha Extract Clarification Letter.Pdf
Od 45 Atlas Copy.Pdf
Od 46 AOS As Per RERA.Pdf
Od 47 Affidavit For Sale - Operation.Pdf
Od 48 Bank Affidavit.Pdf
Od 49 Sales-Operation Declaration Letter.Pdf
Od 50 Clarification About Non Production Of Brochures.Pdf
Od 51 01 OF 05 Mythri Sity Floor Plans Compressed.Pdf
Od 52 02 OF 05 Mythri Sity Floor Plans Compressed.Pdf
Od 53 03 OF 05 Mythri Sity Floor Plans Compressed.Pdf
Od 54 04 OF 05 Mythri Sity Floor Plans Compressed.Pdf
Od 55 05 OF 05 Mythri Sity Floor Plans Compressed.Pdf
Od 56 AIRPORT NOC.Pdf
Od 57 BESCOM NOC With Fee Paid Receipt.Pdf
Od 58 BSNL NOC.Pdf
Od 59 CFE NOC.Pdf
Od 60 Environmental NOC.Pdf
Od 61 KSPCB NOC.Pdf
Od 62 Mythri Sity SEIAA NOC.Pdf
Od 63 Village Map.Pdf
Od 64 Water NOC.Pdf
Od 65 Road NOC.Pdf
Od 66 E Katha.Pdf
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI Bank
Account Number (RERA) 777705903123
IFSC ICIC0001075
Branch Address Bellandur
Country/City