residential Ready to Move Source: rera.ka

Poorvi Enchanting RERA Details - PRM/KA/RERA/1251/446/PR/190123/005632 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Poorvi Enchanting under registration PRM/KA/RERA/1251/446/PR/190123/005632 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/190123/005632
  • Project Name POORVI ENCHANTING
  • Project Type Residential/Group Housing
  • Project Status Ready to Move
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 25 November 2025
  • Documents 76 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 January 2023 Expected commencement of civil works and foundation on site.
Original Completion 25 November 2025 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

POORVI INFINITE PRIVATE LIMITED
Registered Address Sy No.72/2, Dinne Anjaneya Swamy Temple Road, Haraluru,Village, Varthur Hobli ,Bengaluru East ,Bengaluru Urban-560102
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Survey No 32/3, Chikkanayakanahalli Village, , Varthur Hobli , Bengaluru East , Bengaluru Urban, Karnataka - 560035

RERA Coordinates

Latitude, Longitude 12.88897989, 77.69598268
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. L.P No. Nama/AaSa/AaAa-1/Tha Sa-4/East/24/2022-23
Authority BDA - Bangalore Development Authority
Approved Date 15 September 2022

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Poorvi Enchanting 1 13 1 110 Residential 39.15 11 99

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • Poorvi Enchanting
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 86.22254647 101
GF 2 BHK 71.38288104 102
GF 2 BHK 72.45245353 103
GF 2 BHK 65.76210037 104
GF 3 BHK 89.26723048 105
GF 2 BHK 64.57592937 106
GF 2 BHK 65.52380112 107
GF 2 BHK 64.37713755 108
GF 3 BHK 76.83546468 109
1 3 BHK 86.22254647 201
1 2 BHK 71.38288104 202
1 2 BHK 72.45245353 203
1 2 BHK 65.76210037 204
1 3 BHK 89.26723048 205
1 2 BHK 64.57592937 206
1 2 BHK 65.52380112 207
1 2 BHK 64.37713755 208
1 3 BHK 76.83546468 209
2 3 BHK 86.22254647 301
2 2 BHK 71.38288104 302
2 2 BHK 72.45245353 303
2 2 BHK 65.76210037 304
2 3 BHK 89.26723048 305
2 2 BHK 64.57592937 306
2 2 BHK 65.52380112 307
2 2 BHK 64.37713755 308
2 3 BHK 76.83546468 309
3 3 BHK 86.22254647 401
3 2 BHK 71.38288104 402
3 2 BHK 72.45245353 403
3 2 BHK 65.76210037 404
3 3 BHK 89.26723048 405
3 2 BHK 64.57592937 406
3 2 BHK 65.52380112 407
3 2 BHK 64.37713755 408
3 3 BHK 76.83546468 409
4 3 BHK 86.22254647 501
4 2 BHK 71.38288104 502
4 2 BHK 72.45245353 503
4 2 BHK 65.76210037 504
4 3 BHK 89.26723048 505
4 2 BHK 64.57592937 506
4 2 BHK 65.52380112 507
4 2 BHK 64.37713755 508
4 3 BHK 76.83546468 509
5 3 BHK 86.22254647 601
5 2 BHK 71.38288104 602
5 2 BHK 72.45245353 603
5 2 BHK 65.76210037 604
5 3 BHK 89.26723048 605
5 2 BHK 64.57592937 606
5 2 BHK 65.52380112 607
5 2 BHK 64.37713755 608
5 3 BHK 76.83546468 609
6 3 BHK 86.22254647 701
6 2 BHK 71.38288104 702
6 2 BHK 72.45245353 703
6 2 BHK 65.76210037 704
6 3 BHK 89.26723048 705
6 2 BHK 64.57592937 706
6 2 BHK 65.52380112 707
6 2 BHK 64.37713755 708
6 3 BHK 76.83546468 709
7 3 BHK 86.22254647 801
7 2 BHK 71.38288104 802
7 2 BHK 72.45245353 803
7 2 BHK 65.76210037 804
7 3 BHK 89.26723048 805
7 2 BHK 64.57592937 806
7 2 BHK 65.52380112 807
7 2 BHK 64.37713755 808
7 3 BHK 76.83546468 809
8 3 BHK 86.22254647 901
8 2 BHK 71.38288104 902
8 2 BHK 72.45245353 903
8 2 BHK 65.76210037 904
8 3 BHK 89.26723048 905
8 2 BHK 64.57592937 906
8 2 BHK 65.52380112 907
8 2 BHK 64.37713755 908
8 3 BHK 76.83546468 909
9 3 BHK 86.22254647 1001
9 2 BHK 71.38288104 1002
9 2 BHK 72.45245353 1003
9 2 BHK 65.76210037 1004
9 3 BHK 89.26723048 1005
9 2 BHK 64.57592937 1006
9 2 BHK 65.52380112 1007
9 2 BHK 64.37713755 1008
9 3 BHK 76.83546468 1009
10 3 BHK 86.22254647 1101
10 2 BHK 71.38288104 1102
10 2 BHK 72.45245353 1103
10 2 BHK 65.76210037 1104
10 3 BHK 89.26723048 1105
10 2 BHK 64.57592937 1106
10 2 BHK 65.52380112 1107
10 2 BHK 64.37713755 1108
10 3 BHK 76.83546468 1109
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
1 Completion Certificate
Fd 1 Balance Sheet 2021-22.Pdf
Fd 2 Balance Sheet 2020-21.Pdf
Fd 3 Balance Sheet 2019-20.Pdf
Fd 4 Profit And Loss 2021-22.Pdf
Fd 5 Profit And Loss 2020-21.Pdf
Fd 6 Profit And Loss 2019-20.Pdf
Fd 7 Directors Report 21-22.Pdf
Fd 8 Directors Report-20-21.Pdf
Fd 9 Director Report 19-20.Pdf
Fd 10 Cashflow Statement 2021-22.Jpeg
Fd 11 Cashflow Statement 2020-21.Jpeg
Fd 12 CASH FLOW 19-20.Pdf
Fd 13 Independent Auditors Report.Pdf
Fd 14 Independent Audit Report 2020-21.Pdf
Fd 15 Audit Report 2019-20.Pdf
Fd 16 ITR 2021-22.Pdf
Fd 17 ITR 2020-21.Pdf
Fd 18 ITR 2019-20.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 7 KSPCB( Annexure - 99 )
Photo 1 Project Photo
Od 1 FIRE NOC.Pdf
Od 2 1 Site Plan.Pdf
Od 3 2 Ground Floor Plan.Pdf
Od 4 3 Basement Floor Plan.Pdf
Od 5 4 First And Second Floor Plan.Pdf
Od 6 5 Typical Floor Plan 3-11 And Terrace Floor.Pdf
Od 7 6 Elevation Plan.Pdf
Od 8 7 Section Plan.Pdf
Od 9 Guidance Value.Pdf
Od 10 Location Demarcation.Png
Od 11 Village Map Demarcation.Pdf
Od 12 STP DESIGN.Jpg
Od 13 CDP From Master Extract.Pdf
Od 14 CDP From Master Extract.Pdf
Ed 1 29-12-2022
Ed 2 29-12-2022
Ed 3 29-12-2022
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Union Bank of India
Account Number (RERA) 110221010000029
IFSC UBIN0911020
Branch Address HSR Layout Branch
Country/City