Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

NCC Urban Lake Springs RERA Details - PRM/KA/RERA/1251/310/PR/221024/007161 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for NCC Urban Lake Springs under registration PRM/KA/RERA/1251/310/PR/221024/007161 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/221024/007161
  • Project Name NCC Urban Lake Springs
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 28 June 2028
  • Documents 111 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 July 2024 Expected commencement of civil works and foundation on site.
Original Completion 28 June 2028 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

NCC URBAN INFRASTRUCTURE LIMITED
Registered Address NCC Urban Windsor, 3rd Floor,New Airport Road, Opp Jakkur Aerodrome, ,Yelahanka ,Bengaluru Urban-560064
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy.No 32, 33, 34, 35, 36/3, 36/4,42 , Aalahalli Village, Uttarahalli Hobli, Bangalore South Taluk, Bengaluru , Bengaluru South , Bengaluru Urban, Karnataka - 560108

RERA Coordinates

Latitude, Longitude 12.866476549450654, 77.56494521419374
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Ad.Com./BMH/0514/22-23
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 09 May 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
A 1 18 1 68 Residential 56.5 17 68
B 1 18 1 68 Residential 56.5 17 68
C 2 18 1 68 Residential 56.5 17 68
D 2 18 1 68 Residential 56.5 17 68

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
3 BHK 0 units
5 BHK 0 units
  • A
  • B
  • C
  • D
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 125.68 A101
GF 3.5 BHK 128.65 A102
GF 3 BHK 116.5 A103
GF 2.5 BHK 92.5 A104
1 3 BHK 125.68 A201
1 3.5 BHK 128.65 A202
1 3 BHK 116.5 A203
1 2.5 BHK 92.5 A204
2 3 BHK 125.68 A301
2 3.5 BHK 128.65 A302
2 3 BHK 116.5 A303
2 2.5 BHK 92.5 A304
3 3 BHK 125.68 A401
3 3.5 BHK 128.65 A402
3 3 BHK 116.5 A403
3 2.5 BHK 92.5 A404
4 3 BHK 125.68 A501
4 3.5 BHK 128.65 A502
4 3 BHK 116.5 A503
4 2.5 BHK 92.5 A504
5 3 BHK 125.68 A601
5 3.5 BHK 128.65 A602
5 3 BHK 116.5 A603
5 2.5 BHK 92.5 A604
6 3 BHK 125.68 A701
6 3.5 BHK 128.65 A702
6 3 BHK 116.5 A703
6 2.5 BHK 92.5 A704
7 3 BHK 125.68 A801
7 3.5 BHK 128.65 A802
7 3 BHK 116.5 A803
7 2.5 BHK 92.5 A804
8 3 BHK 125.68 A901
8 3.5 BHK 128.65 A902
8 3 BHK 116.5 A903
8 2.5 BHK 92.5 A904
9 3 BHK 125.68 A1001
9 3.5 BHK 128.65 A1002
9 3 BHK 116.5 A1003
9 2.5 BHK 92.5 A1004
10 3 BHK 125.68 A1101
10 3.5 BHK 128.65 A1102
10 3 BHK 116.5 A1103
10 2.5 BHK 92.5 A1104
11 3 BHK 125.68 A1201
11 3.5 BHK 128.65 A1202
11 3 BHK 116.5 A1203
11 2.5 BHK 92.5 A1204
12 3 BHK 125.68 A1301
12 3.5 BHK 128.65 A1302
12 3 BHK 116.5 A1303
12 2.5 BHK 92.5 A1304
13 3 BHK 125.68 A1401
13 3.5 BHK 128.65 A1402
13 3 BHK 116.5 A1403
13 2.5 BHK 92.5 A1404
14 3 BHK 125.68 A1501
14 3.5 BHK 128.65 A1502
14 3 BHK 116.5 A1503
14 2.5 BHK 92.5 A1504
15 3 BHK 125.68 A1601
15 3.5 BHK 128.65 A1602
15 3 BHK 116.5 A1603
15 2.5 BHK 92.5 A1604
16 3 BHK 125.68 A1701
16 3.5 BHK 128.65 A1702
16 3 BHK 116.5 A1703
16 2.5 BHK 92.5 A1704
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Common Areas Staircases % not reported Common Areas Lifts % not reported
Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported
Common Areas Basement % not reported Common Areas Terrace % not reported Common Areas Outer Wall % not reported
Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported Common Areas Water Conservation And Renewable Energy % not reported
Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Ed 21 10-10-2024
Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Balance Sheet 2022-2023.Pdf
Fd 2 Balance Sheet 2021-22.Pdf
Fd 3 Balance Sheet 2020- 2021.Pdf
Fd 4 Profit And Loss Statement 2022-23.Pdf
Fd 5 Profit And Loss Statement 2021-22.Pdf
Fd 6 Profit Loss Statement 2020- 2021.Pdf
Fd 7 NA.Pdf
Fd 8 NA.Pdf
Fd 9 NA.Pdf
Fd 10 Cash Flow Statement 2022-23.Pdf
Fd 11 Cashflow Statement 2021-22.Pdf
Fd 12 Cash Flow 2020 -2021.Pdf
Fd 13 Auditor Report 2022 23.Pdf
Fd 14 Auditors Report 2021 22.Pdf
Fd 15 Auditor Report 2021.Pdf
Fd 16 ITR Acknowledgement 22-23.Pdf
Fd 17 ITR Acknowledgement FY 21-22.Pdf
Fd 18 ITR 2020-21.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 3 Approval NOC Under Section 109 Of KLR Act 1961( Annexure - 95 )
Noc 4 Approval NOC Under Section 14 Of The KTCP Act( Annexure - 96 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Noc 10 Lift Authorities( Annexure - 102 )
Noc 11 BMRCL( Annexure - 103 )
Noc 13 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 14 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 15 Coastal Regulation Zone Authority( Annexure - 107 )
Dr 1 Utilisation Certificate( Annexure - 108 )
Dr 2 Transfer Of Development Rights Certificate( Annexure - 109 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 HAL NOC.Pdf
Od 2 Forest NOC.Pdf
Od 3 Supplementary J D A 3119 24-24.Pdf
Od 4 Addendum GPA 164 24-25.Pdf
Od 5 BOCW RC.Pdf
Od 6 Alahalli CDP 2015 Compressed.Pdf
Od 7 Alahalli SR 2015 Compressed.Pdf
Od 8 STP Demarcation Drawing And Section.Pdf
Od 9 Project Cost Estimate Signed.Pdf
Ed 1 12-09-2024
Ed 2 12-09-2024
Ed 3 12-09-2024
Ed 4 12-09-2024
Ed 5 12-09-2024
Ed 6 12-09-2024
Ed 7 12-09-2024
Ed 8 12-09-2024
Ed 9 12-09-2024
Ed 10 12-09-2024
Ed 11 12-09-2024
Ed 12 12-09-2024
Ed 13 12-09-2024
Ed 14 12-09-2024
Ed 15 12-09-2024
Ed 16 12-09-2024
Ed 17 12-09-2024
Ed 18 12-09-2024
Ed 19 12-09-2024
Ed 20 10-10-2024
Ed 22 10-10-2024
Ed 23 10-10-2024
Ed 24 10-10-2024
Ed 25 10-10-2024
Ed 26 10-10-2024
Ed 27 10-10-2024
Ed 28 10-10-2024
Ed 29 21-10-2024
Ed 30 21-10-2024
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI Bank
Account Number (RERA) 777705032010
IFSC ICIC0002318
Branch Address Bagalur
Country/City