Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential New Launch Source: rera.ka

Provident Equinox 5 RERA Details - PRM/KA/RERA/1251/310/PR/170126/008410 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Provident Equinox 5 under registration PRM/KA/RERA/1251/310/PR/170126/008410 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/170126/008410
  • Project Name Provident Equinox 5
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 31 March 2030
  • Documents 86 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 02 March 2026 Expected commencement of civil works and foundation on site.
Original Completion 31 March 2030 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Provident Housing Limited
Registered Address 130/1 Yellappa Chetty Layout,Ulsoor Road Bangalore ,Bengaluru East ,Bengaluru Urban-560042
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy No. 1 to 3,4(p),5,6,7(p),8(p) 9 to 26 of Venkatapura Village, , Kengeri Hobli, Bangalore South Taluk , Bengaluru South , Bengaluru Urban, Karnataka - 560060

RERA Coordinates

Latitude, Longitude 12.88500000, 77.47027778
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BDA/NM/AS/AA-3/TS-2/D/23/2025-26
Authority BDA - Bangalore Development Authority
Approved Date 17 December 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Wing A 0 12 1 48 Residential 39.95 12 48
Wing B 1 13 0 60 Residential 39.95 12 60
Wing C 1 13 0 84 Residential 39.95 12 84
Wing D 0 12 0 48 Residential 39.95 12 48
Wing E 1 13 0 84 Residential 39.95 12 84
Wing F 1 13 0 60 Residential 39.95 12 72

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • Wing A
  • Wing B
  • Wing C
  • Wing D
  • Wing E
  • Wing F
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 144.68 3A 0101
GF 3 BHK 119.58 3A0102
GF 3 BHK 146.72 3A0103
GF 3 BHK 119.58 3A0104
1 3 BHK 144.68 3A 0201
1 3 BHK 119.58 3A 0202
1 3 BHK 146.72 3A0203
1 3 BHK 119.58 3A 0204
2 3 BHK 144.68 3A 0301
2 3 BHK 119.58 3A0302
2 3 BHK 146.72 3A0303
2 3 BHK 119.58 3A0304
3 3 BHK 144.68 3A 0401
3 3 BHK 119.58 3A0402
3 3 BHK 146.72 3A0403
3 3 BHK 119.58 3A0404
4 3 BHK 144.68 3A 0501
4 3 BHK 119.58 3A0502
4 3 BHK 146.72 3A0503
4 3 BHK 119.58 3A0504
5 3 BHK 144.68 3A 0601
5 3 BHK 119.58 3A0602
5 3 BHK 146.72 3A0603
5 3 BHK 119.58 3A0604
6 3 BHK 144.68 3A 0701
6 3 BHK 119.58 3A0702
6 3 BHK 146.72 3A0703
6 3 BHK 119.58 3A0704
7 3 BHK 144.68 3A 0801
7 3 BHK 119.58 3A0802
7 3 BHK 146.72 3A0803
7 3 BHK 119.58 3A0804
8 3 BHK 144.68 3A 0901
8 3 BHK 119.58 3A0902
8 3 BHK 146.72 3A0903
8 3 BHK 119.58 3A0904
9 3 BHK 144.68 3A 1001
9 3 BHK 119.58 3A1002
9 3 BHK 146.72 3A1003
9 3 BHK 119.58 3A1004
10 3 BHK 144.68 3A 1101
10 3 BHK 119.58 3A1102
10 3 BHK 146.72 3A1103
10 3 BHK 119.58 3A1104
11 3 BHK 144.68 3A 1201
11 3 BHK 119.58 3A1202
11 3 BHK 146.72 3A1203
11 3 BHK 119.58 3A1204
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
1 Completion Certificate
Fd 1 24-25 Balance Sheet.Pdf
Fd 2 Balance Sheet 23-24.Pdf
Fd 3 Balance Sheet 22-23.Pdf
Fd 4 24-25 Statement Of P & L.Pdf
Fd 5 Statement Of P&L 23-24.Pdf
Fd 6 Statement Of P&L 22-23.Pdf
Fd 7 ITR FY 24-25.Pdf
Fd 8 23-24.Pdf
Fd 9 2022-23.Pdf
Fd 10 PHL Directors Report FY 2024-25 Signed.Pdf
Fd 11 22-23 PHL DR COM.Pdf
Fd 12 22-23 PHL DR COM.Pdf
Fd 13 24-25 Cash Flow.Pdf
Fd 14 Case Flow 23-24.Pdf
Fd 15 Cash Flow 22-23.Pdf
Fd 16 24-25 Independent Auditors Report.Pdf
Fd 17 Independent AR 23-24.Pdf
Fd 18 Independent AR 22-23.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Noc 8 Lift Authorities( Annexure - 102 )
Noc 9 BMRCL( Annexure - 103 )
Noc 10 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 11 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 12 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 13 Coastal Regulation Zone Authority( Annexure - 107 )
Photo 1 Project Photo
Od 1 Venkatapura Village Map.Pdf
Od 2 Venkatapura Village Map Demarcted Survey Number.Pdf
Od 3 CDP MAP 322 Kumbalagodu.JPG
Od 4 Area Statement.Pdf
Od 5 Basement Floor Plan.Pdf
Od 6 Typical Floor Plan Compressed.Pdf
Od 7 Stilt Floor Plan Compressed.Pdf
Od 8 Elevation And Section Plan Compressed.Pdf
Od 9 Land Area Declaration.Pdf
Od 10 Guidline Value.Pdf
Od 11 Demarcated Plan.Pdf
Ed 1 12-01-2026
Ed 2 12-01-2026
Ed 3 12-01-2026
Ed 4 12-01-2026
Ed 5 12-01-2026
Ed 6 12-01-2026
Ed 7 12-01-2026
Ed 8 12-01-2026
Ed 9 12-01-2026
Ed 10 12-01-2026
Ed 11 16-01-2026
Ed 12 16-01-2026
Ed 13 16-01-2026
Ed 14 16-01-2026
Ed 15 16-01-2026
Ed 16 16-01-2026
Ed 17 16-01-2026
Ed 18 16-01-2026
Ed 19 16-01-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI Bank
Account Number (RERA) 777705149349
IFSC ICIC0003904
Branch Address Ulsoor Road Branch
Country/City