Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.ka

Sai Platinum Greenfields RERA Details - PRM/KA/RERA/1251/310/PR/220922/005260 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sai Platinum Greenfields under registration PRM/KA/RERA/1251/310/PR/220922/005260 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/220922/005260
  • Project Name PLATINUM GREENFIELDS
  • Project Type Residential/Group Housing
  • Project Status Ready to Move
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 30 June 2025
  • Documents 92 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 15 April 2022 Expected commencement of civil works and foundation on site.
Original Completion 30 June 2025 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

SAI PROPERTIES
Registered Address Sy No. 80,Kembathahalli, Uttarahalli Hobli ,Bengaluru South ,Bengaluru Urban-560083
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address KATHA NO. 166, SY NO 80/2, KEMBATHAHALLI, , UTTARAHALLI HOBLI, BANGALORE SOUTH , Bengaluru South , Bengaluru Urban, Karnataka - 560083

RERA Coordinates

Latitude, Longitude 12.859352689986045, 77.57082187929907
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Addl.Dir/JDSOUTH/0016/21-22
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 18 March 2022

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
A,B,C 1 6 0 165 Residential 14.9 4 148

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • A,B,C
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 2 BHK 77.52 2
-1 2 BHK 77.52 3
-1 3 BHK 102.47 4
-1 2 BHK 83.28 5
-1 3 BHK 102.03 6
-1 3 BHK 91.35 7
-1 2 BHK 83.55 8
-1 2 BHK 70.35 9
-1 2 BHK 70.89 10
-1 3 BHK 101.91 11
-1 3 BHK 96.26 12
-1 3 BHK 91.90 13
-1 3 BHK 96.22 14
-1 3 BHK 94.97 15
-1 3 BHK 95.40 16
-1 2 BHK 71.83 17
-1 2 BHK 72.80 18
-1 3 BHK 89.81 19
-1 2 BHK 83.71 20
-1 2 BHK 78.65 21
-1 3 BHK 95.40 22
-1 3 BHK 94.29 23
-1 3 BHK 98.94 24
-1 2 BHK 73.50 26
-1 2 BHK 73.50 27
-1 3 BHK 100.80 28
-1 2 BHK 79.70 29
-1 2 BHK 84.95 30
GF 3 BHK 109.77 1
GF 2 BHK 77.52 2
GF 2 BHK 77.52 3
GF 3 BHK 102.47 4
GF 2 BHK 83.28 5
GF 3 BHK 102.18 6
GF 3 BHK 91.35 7
GF 2 BHK 83.55 8
GF 2 BHK 73.88 9
GF 2 BHK 73.87 10
GF 3 BHK 103.58 11
GF 3 BHK 96.26 12
GF 3 BHK 91.90 13
GF 3 BHK 96.22 14
GF 3 BHK 94.97 15
GF 3 BHK 97.07 16
GF 2 BHK 71.83 17
GF 2 BHK 74.47 18
GF 3 BHK 91.48 19
GF 2 BHK 83.71 20
GF 2 BHK 78.65 21
GF 3 BHK 97.07 22
GF 3 BHK 95.96 23
GF 3 BHK 90.45 24
GF 3 BHK 95.90 25
GF 2 BHK 73.50 26
GF 2 BHK 73.50 27
GF 3 BHK 100.80 28
GF 2 BHK 79.70 29
GF 2 BHK 84.95 30
1 3 BHK 109.77 1
1 2 BHK 77.52 2
1 2 BHK 77.52 3
1 3 BHK 102.47 4
1 2 BHK 83.28 5
1 3 BHK 102.18 6
1 3 BHK 91.35 7
1 2 BHK 83.55 8
1 2 BHK 73.88 9
1 2 BHK 73.87 10
1 3 BHK 103.58 11
1 3 BHK 96.26 12
1 3 BHK 91.90 13
1 3 BHK 96.22 14
1 3 BHK 94.97 15
1 3 BHK 97.07 16
1 2 BHK 71.83 17
1 2 BHK 74.47 18
1 3 BHK 91.48 19
1 2 BHK 83.71 20
1 2 BHK 78.65 21
1 3 BHK 97.07 22
1 3 BHK 95.96 23
1 3 BHK 90.45 24
1 3 BHK 95.90 25
1 2 BHK 73.50 26
1 2 BHK 73.50 27
1 3 BHK 100.80 28
1 2 BHK 79.70 29
1 2 BHK 84.95 30
2 3 BHK 109.77 1
2 2 BHK 77.52 2
2 2 BHK 77.52 3
2 3 BHK 102.47 4
2 2 BHK 83.28 5
2 3 BHK 102.18 6
2 3 BHK 91.35 7
2 2 BHK 83.55 8
2 2 BHK 73.88 9
2 2 BHK 73.87 10
2 3 BHK 103.58 11
2 3 BHK 96.26 12
2 3 BHK 91.90 13
2 3 BHK 96.22 14
2 3 BHK 94.97 15
2 3 BHK 97.07 16
2 2 BHK 71.83 17
2 2 BHK 74.47 18
2 3 BHK 91.48 19
2 2 BHK 83.71 20
2 2 BHK 78.65 21
2 3 BHK 97.07 22
2 3 BHK 95.96 23
2 3 BHK 90.45 24
2 3 BHK 95.90 25
2 2 BHK 73.50 26
2 2 BHK 73.50 27
2 3 BHK 100.80 28
2 2 BHK 79.70 29
2 2 BHK 84.95 30
3 3 BHK 109.77 1
3 2 BHK 77.52 2
3 2 BHK 77.52 3
3 3 BHK 102.47 4
3 2 BHK 83.28 5
3 3 BHK 102.18 6
3 3 BHK 91.35 7
3 2 BHK 83.55 8
3 2 BHK 73.88 9
3 2 BHK 73.87 10
3 3 BHK 103.58 11
3 3 BHK 96.26 12
3 3 BHK 91.90 13
3 3 BHK 96.22 14
3 3 BHK 94.97 15
3 3 BHK 97.07 16
3 2 BHK 71.73 17
3 2 BHK 74.47 18
3 3 BHK 91.48 19
3 2 BHK 83.71 20
3 2 BHK 78.65 21
3 3 BHK 97.07 22
3 3 BHK 95.96 23
3 3 BHK 90.45 24
3 3 BHK 95.90 25
3 2 BHK 73.50 26
3 2 BHK 73.50 27
3 3 BHK 100.80 28
3 2 BHK 79.70 29
3 2 BHK 84.95 30
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Fd 8 RERA NA.Pdf
Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
1 Completion Certificate
Fd 1 IT Return Not Yet Filed.Pdf
Fd 2 BS 2020-21.Pdf
Fd 3 BS 2019-20.Pdf
Fd 4 IT Return Not Yet Filed.Pdf
Fd 5 P&L2020-21.Pdf
Fd 6 P&L 2019-20.Pdf
Fd 7 RERA NA.Pdf
Fd 9 RERA NA.Pdf
Fd 10 IT Return Not Yet Filed.Pdf
Fd 11 2020-21 Cash Flow.Pdf
Fd 12 2019-20 Cash Flow.Pdf
Fd 13 IT Return Not Yet Filed.Pdf
Fd 14 FY 2020-21 FORM 3CB-SP (1).Pdf
Fd 15 3CB 2019-20.Pdf
Fd 16 IT Return Not Yet Filed.Pdf
Fd 17 ITR 2020-21.Pdf
Fd 18 ITR V 2019-20.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 3 Approval NOC Under Section 109 Of KLR Act 1961( Annexure - 95 )
Noc 4 Approval NOC Under Section 14 Of The KTCP Act( Annexure - 96 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Noc 10 Lift Authorities( Annexure - 102 )
Noc 11 BMRCL( Annexure - 103 )
Noc 12 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 13 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 14 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 15 Coastal Regulation Zone Authority( Annexure - 107 )
Dr 1 Utilisation Certificate( Annexure - 108 )
Dr 2 Transfer Of Development Rights Certificate( Annexure - 109 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 RERA NA (1).Pdf
Ed 1 27-07-2022
Ed 2 27-07-2022
Ed 3 27-07-2022
Ed 4 27-07-2022
Ed 5 27-07-2022
Ed 6 27-07-2022
Ed 7 27-07-2022
Ed 8 27-07-2022
Ed 9 27-07-2022
Ed 10 24-08-2022
Ed 11 24-08-2022
Ed 12 24-08-2022
Ed 13 24-08-2022
Ed 14 24-08-2022
Ed 15 14-09-2022
Ed 16 14-09-2022
Ed 17 14-09-2022
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Bank of Baroda
Account Number (RERA) 27500200002148
IFSC BARB0JPNAGA
Branch Address JP NAGAR
Country/City