Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Sapthagiri Nirvana RERA Details - PRM/KA/RERA/1251/446/PR/030524/006840 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sapthagiri Nirvana under registration PRM/KA/RERA/1251/446/PR/030524/006840 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/030524/006840
  • Project Name Sapthagiri Nirvana
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 21 January 2027
  • Documents 106 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 22 January 2024 Expected commencement of civil works and foundation on site.
Original Completion 21 January 2027 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

M/s SAPTHAGIRI VENTURES
Registered Address No 2017, No 243/2B2, No 317, Gunjur Village,Varthur Main Road ,Bengaluru East ,Bengaluru Urban-560087
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy No 243/2B2, Khatha No 317 of Gunjur Village , Ward No. 149, Varthur Hobli , Bengaluru East , Bengaluru Urban, Karnataka - 560087

RERA Coordinates

Latitude, Longitude 12.920878, 77.737534
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Addl.Dir/JDNORTH/0084/22-23
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 22 January 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Sapthagiri Nirvana 1 14 0 95 Residential 43.2 13 95

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BED+ 2TOI 0 units
3 BED+ 3TOI 0 units
  • Sapthagiri Nirvana
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 2 BED+ 2TOI 74.84 101
GF 2 BED+ 2TOI 74.84 102
GF 3 BED+ 3TOI 99.58 103
GF 2 BED+ 2TOI 76.11 104
GF 3 BED+ 3TOI 99.58 105
GF 3 BED+ 3TOI 99 108
1 2 BED+ 2TOI 75.42 201
1 2 BED+ 2TOI 75.42 202
1 3 BED+ 3TOI 99.58 203
1 2 BED+ 2TOI 76.11 204
1 3 BED+ 3TOI 99.58 205
1 3 BED+ 3TOI 98.57 206
1 3 BED+ 3TOI 98.04 207
1 3 BED+ 3TOI 99 208
2 2 BED+ 2TOI 75.42 301
2 2 BED+ 2TOI 75.42 302
2 3 BED+ 3TOI 99.58 303
2 2 BED+ 2TOI 76.11 304
2 3 BED+ 3TOI 99.58 305
2 3 BED+ 3TOI 98.57 306
2 3 BED+ 3TOI 98.04 307
2 3 BED+ 3TOI 99 308
3 2 BED+ 2TOI 75.42 401
3 2 BED+ 2TOI 75.42 402
3 3 BED+ 3TOI 99.58 403
3 2 BED+ 2TOI 76.11 404
3 3 BED+ 3TOI 99.58 405
3 3 BED+ 3TOI 98.57 406
3 3 BED+ 3TOI 98.04 407
3 3 BED+ 3TOI 99 408
4 2 BED+ 2TOI 75.42 501
4 2 BED+ 2TOI 75.42 502
4 3 BED+ 3TOI 99.58 503
4 2 BED+ 2TOI 76.11 504
4 3 BED+ 3TOI 99.58 505
4 3 BED+ 3TOI 98.57 506
4 3 BED+ 3TOI 98.04 507
4 3 BED+ 3TOI 99 508
5 2 BED+ 2TOI 75.42 601
5 2 BED+ 2TOI 75.42 602
5 3 BED+ 3TOI 99.58 603
5 2 BED+ 2TOI 76.11 604
5 3 BED+ 3TOI 99.58 605
5 3 BED+ 3TOI 98.57 606
5 3 BED+ 3TOI 98.04 607
5 3 BED+ 3TOI 99 608
6 2 BED+ 2TOI 75.42 701
6 2 BED+ 2TOI 75.42 702
6 3 BED+ 3TOI 99.58 703
6 2 BED+ 2TOI 76.11 704
6 3 BED+ 3TOI 99.58 705
6 3 BED+ 3TOI 98.57 706
6 3 BED+ 3TOI 98.04 707
6 3 BED+ 3TOI 99 708
7 2 BED+ 2TOI 75.42 801
7 2 BED+ 2TOI 75.42 802
7 3 BED+ 3TOI 99.58 803
7 2 BED+ 2TOI 76.11 804
7 3 BED+ 3TOI 99.58 805
7 3 BED+ 3TOI 98.57 806
7 3 BED+ 3TOI 98.04 807
7 3 BED+ 3TOI 99 808
8 2 BED+ 2TOI 75.42 901
8 2 BED+ 2TOI 75.42 902
8 3 BED+ 3TOI 99.58 903
8 2 BED+ 2TOI 76.11 904
8 3 BED+ 3TOI 99.58 905
8 3 BED+ 3TOI 98.57 906
8 3 BED+ 3TOI 98.04 907
8 3 BED+ 3TOI 99 908
9 2 BED+ 2TOI 75.42 1001
9 2 BED+ 2TOI 75.42 1002
9 3 BED+ 3TOI 99.58 1003
9 2 BED+ 2TOI 76.11 1004
9 3 BED+ 3TOI 99.58 1005
9 3 BED+ 3TOI 98.57 1006
9 3 BED+ 3TOI 98.04 1007
9 3 BED+ 3TOI 99 1008
10 2 BED+ 2TOI 75.42 1102
10 3 BED+ 3TOI 99.58 1103
10 2 BED+ 2TOI 76.11 1104
10 3 BED+ 3TOI 99.58 1105
10 3 BED+ 3TOI 98.57 1106
10 3 BED+ 3TOI 98.04 1107
11 2 BED+ 2TOI 75.42 1202
11 3 BED+ 3TOI 99.58 1203
11 2 BED+ 2TOI 76.11 1204
11 3 BED+ 3TOI 99.58 1205
11 3 BED+ 3TOI 98.57 1206
11 3 BED+ 3TOI 98.04 1207
12 2 BED+ 2TOI 75.42 1302
12 3 BED+ 3TOI 99.58 1303
12 2 BED+ 2TOI 76.11 1304
12 3 BED+ 3TOI 99.58 1305
12 3 BED+ 3TOI 98.57 1306
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Balance Sheet FY 22-23.Pdf
Fd 2 NA.Jpg
Fd 3 NA.Jpg
Fd 4 Profit And Loss FY 22-23.Pdf
Fd 5 NA.Jpg
Fd 6 NA.Jpg
Fd 7 NA.Jpg
Fd 8 NA.Jpg
Fd 9 NA.Jpg
Fd 10 NA.Jpg
Fd 11 NA.Jpg
Fd 12 NA.Jpg
Fd 13 NA.Jpg
Fd 14 NA.Jpg
Fd 15 NA.Jpg
Fd 16 NA.Jpg
Fd 17 NA.Jpg
Fd 18 NA.Jpg
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 JDA & GPA.Pdf
Od 2 Special Power Of Attorney.Pdf
Od 3 Sharing Agreement.Pdf
Od 4 CDP Plan.Pdf
Od 5 Village Map.Pdf
Od 6 Abstract Estimation.Pdf
Od 7 Common Area Details.Pdf
Od 8 Land Cost Calculation.Pdf
Od 9 Guidance Value Certificate.Pdf
Od 10 Source Of Water Supply.Pdf
Od 11 STP Drawing.Pdf
Od 12 HAL NOC.Pdf
Od 13 Survey Sketch.Pdf
Od 14 MR 104.Pdf
Od 15 Hissa Phodi & Survey Sketch.Pdf
Od 16 MR H120.Pdf
Od 17 MR T30.Pdf
Od 18 Area Statement.Pdf
Od 19 Carpet Area Calculation.Pdf
Od 20 Death Certificate - Ramakrishna Reddy.Pdf
Od 21 Declaration.Pdf
Od 22 Form 6 Record Of Rights.Pdf
Od 23 Partition Deed.Pdf
Od 24 Sale Deed To Jayamma.Pdf
Od 25 Sale Deed To Nagaraja Reddy & Ramakrishna Reddy.Pdf
Od 26 Sale Deed To Siddalingappa.Pdf
Od 27 No Mortgage Affidavit.Pdf
Od 28 Declaration For KSPCB NOC.Pdf
Od 29 Declaration For Fire NOC.Pdf
Od 30 Declaration For BWSSB NOC.Pdf
Od 31 Proforma Of Sale Deed.Pdf
Od 32 Booking Application Form.Pdf
Od 33 Source Of Water Supply.Pdf
Ed 1 18-04-2024
Ed 2 18-04-2024
Ed 3 18-04-2024
Ed 4 18-04-2024
Ed 5 18-04-2024
Ed 6 18-04-2024
Ed 7 18-04-2024
Ed 8 18-04-2024
Ed 9 18-04-2024
Ed 10 18-04-2024
Ed 11 18-04-2024
Ed 12 18-04-2024
Ed 13 18-04-2024
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 57500001789249
IFSC HDFC0004140
Branch Address J P Nagar 2nd Phase, Bengaluru
Country/City