Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.ka

Vista Spaces Visista RERA Details - PRM/KA/RERA/1251/309/PR/011022/005287 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Vista Spaces Visista under registration PRM/KA/RERA/1251/309/PR/011022/005287 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/309/PR/011022/005287
  • Project Name VISISTA BY VISTA SPACES | OKAS
  • Project Type Residential/Group Housing
  • Project Status Ready to Move
  • District Bengaluru Urban
  • Taluka Bengaluru North
  • Original Completion 31 December 2026
  • Documents 88 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 16 June 2022 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2026 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

VISTA SPACES JAKKUR RESIDENCY PRIVATE LIMITED
Registered Address 11, DIAMOND HOUSE, PRIMROSE RD, GURUAPPA AVENUE,M.G RD, CRS, BANGALORE, Bangalore, Karnataka, India, 560025 ,Bengaluru South ,Bengaluru Urban-560025
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Katha No: 581/1/72/79/4, 600/72, 601/79, 602/72 & 1144/72, Survey No: 72 & 79 , Allalasandra Village, Yelahanka Hobli, Bangalore North Taluk, Ward No: 04 , Bengaluru North , Bengaluru Urban, Karnataka - 560064

RERA Coordinates

Latitude, Longitude 13.08765, 77.59085
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Addl.Dir/JDNORTH/0027/21-22
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 11 April 2022

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower-A 1 16 1 85 Residential 49.95 15 60
Tower-B 1 16 1 82 Residential 49.95 15 58
Tower-C 1 16 1 82 Residential 49.95 15 58
Tower-D 1 16 1 85 Residential 49.95 15 60

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 4
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
5 BHK 0 units
  • Tower-A
  • Tower-B
  • Tower-C
  • Tower-D
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 108.13 A-101
GF 3 BHK 109.94 A-102
GF 3 BHK 122.45 A-103
GF 3.5 BHK 131.76 A-104
1 3 BHK 115.19 A-201
1 3 BHK 115.95 A-202
1 3 BHK 122.47 A-203
1 3.5 BHK 131.76 A-204
2 3 BHK 115.17 A-301
2 3 BHK 116.04 A-302
2 3 BHK 122.45 A-303
2 3.5 BHK 131.76 A-304
3 3 BHK 115.17 A-401
3 3 BHK 116.04 A-402
3 3 BHK 122.45 A-403
3 3.5 BHK 131.76 A-404
4 3 BHK 115.17 A-501
4 3 BHK 116.04 A-502
4 3 BHK 122.45 A-503
4 3.5 BHK 131.76 A-504
5 3 BHK 115.17 A-601
5 3 BHK 116.04 A-602
5 3 BHK 122.45 A-603
5 3.5 BHK 131.76 A-604
6 3 BHK 115.17 A-701
6 3 BHK 116.04 A-702
6 3 BHK 122.45 A-703
6 3.5 BHK 131.76 A-704
7 3 BHK 115.17 A-801
7 3 BHK 116.04 A-802
7 3 BHK 122.45 A-803
7 3.5 BHK 131.76 A-804
8 3 BHK 115.17 A-901
8 3 BHK 116.04 A-902
8 3 BHK 122.45 A-903
8 3.5 BHK 131.76 A-904
9 3 BHK 115.17 A-1001
9 3 BHK 116.04 A-1002
9 3 BHK 122.45 A-1003
9 3.5 BHK 131.76 A-1004
10 3 BHK 115.17 A-1101
10 3 BHK 116.04 A-1102
10 3 BHK 122.45 A-1103
10 3.5 BHK 131.76 A-1104
11 3 BHK 115.17 A-1201
11 3 BHK 116.04 A-1202
11 3 BHK 122.45 A-1203
11 3.5 BHK 131.76 A-1204
12 3 BHK 115.17 A-1301
12 3 BHK 116.04 A-1302
12 3 BHK 122.45 A-1303
12 3.5 BHK 131.76 A-1304
13 3 BHK 115.17 A-1401
13 3 BHK 116.04 A-1402
13 3 BHK 122.45 A-1403
13 3.5 BHK 131.76 A-1404
14 3 BHK 115.79 A-1501
14 2 BHK 126.87 A-1502
14 3 BHK 131.26 A-1503
14 3.5 BHK 141.18 A-1504
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Common Areas Staircases % not reported Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported
Sub Structure Upto Plinth Level % not reported Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported
Sup Structure Rcc Or Ms Framed Structure % not reported Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported
Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported
Sup Structure Railing And Grill Fixing % not reported Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported
Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported
Finishing Works Elevation Work % not reported Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported
Internal Infrastructure Sewage And Drainage System % not reported Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported
Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported
External Infrastructure Water Supply % not reported External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported
External Infrastructure Electricity Supply Transformer And Substation % not reported External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported
External Infrastructure Storm Water Drains % not reported External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported
External Infrastructure Fire Protection And Fire Safety Requirements % not reported External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported
External Infrastructure Street Lighting % not reported Amenities Electricity % not reported Amenities Smart Home Automation % not reported
Amenities Cctv Surveillance % not reported Amenities Club House % not reported Amenities Community Hall % not reported
Amenities Outdoor Sports Facility % not reported Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported
Amenities Gym % not reported Amenities Parks % not reported Amenities Power Backup % not reported
Amenities Piped Gas % not reported Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 BS.Pdf
Fd 2 NA.Pdf
Fd 3 NA.Pdf
Fd 4 P L.Pdf
Fd 5 NA.Pdf
Fd 6 NA.Pdf
Fd 7 Directors Report.Pdf
Fd 8 NA.Pdf
Fd 9 NA.Pdf
Fd 10 CFS.Pdf
Fd 11 NA.Pdf
Fd 12 NA.Pdf
Fd 13 Audit Report.Pdf
Fd 14 NA.Pdf
Fd 15 NA.Pdf
Fd 16 ITR ACK.Pdf
Fd 17 NA.Pdf
Fd 18 NA.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 NA.Pdf
Od 2 GPA.Pdf
Od 3 Valuation Report Judicial Layout.Pdf
Od 4 Deed Of Sale - Kodanda Raju.Pdf
Od 5 Sale Deed Of Mr Shekar Raju.Pdf
Od 6 Sale DEED - Arun Arjun.Pdf
Od 7 SALE DEED - Bhoja Raju.Pdf
Od 8 Sale Deed In Favour Of Jayamma.Pdf
Od 9 Sale Deed Of Mr Bhaskar Raju.Pdf
Od 10 Approved Building Plotting Plan.Pdf
Od 11 Rectification Of Amalgamation Deed.Pdf
Od 12 STP Drawings.Pdf
Od 13 No Mortgage Affidavit.Pdf
Od 14 Draft Sale Deed.Pdf
Od 15 Location And Demarcation Plan.Pdf
Ed 1 26-07-2022
Ed 2 26-07-2022
Ed 3 26-07-2022
Ed 4 26-07-2022
Ed 5 26-07-2022
Ed 6 26-07-2022
Ed 7 26-07-2022
Ed 8 26-07-2022
Ed 9 26-07-2022
Ed 10 26-07-2022
Ed 11 20-09-2022
Ed 12 20-09-2022
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 57500001268520
IFSC HDFC0000523
Branch Address BENGALURU - RICHMOND ROAD
Country/City