Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

VSPR Bhuvana Boulevard RERA Details - PRM/KA/RERA/1250/304/PR/170425/007676 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for VSPR Bhuvana Boulevard under registration PRM/KA/RERA/1250/304/PR/170425/007676 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1250/304/PR/170425/007676
  • Project Name BHUVANA BOULEVARD PHASE 2
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Rural
  • Taluka Hosakote
  • Original Completion 31 December 2030
  • Documents 71 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 March 2025 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2030 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

VSPR DEVELOPERS
Registered Address NO. 118, KUSHAL, 6TH CROSS,BHADRAPPA LAYOUT, NAGASHETTYHALLI ,Bengaluru North ,Bengaluru Urban-560094
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy no 219/1, Mutsandra Village, Anugondanahalli Hobli , Hoskote Taluk, Bangalore Rural District , Hosakote , Bengaluru Rural, Karnataka - 560087

RERA Coordinates

Latitude, Longitude 12.935147, 77.780037
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. HPA/CC/509/2023-24/2627
Authority Hoskote Planning Authority
Approved Date 09 January 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
BHUVANA BOULEVARD PHASE 2 0 3 0 28 Residential 10.0 2 28

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 1
Inventory Type RESIDENTIAL
Configuration Distribution
4 BHK 0 units
  • BHUVANA BOULEVARD PHASE 2
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 4 BHK 211 B1
-1 4 BHK 183 B2
-1 4 BHK 183 B3
-1 4 BHK 183 B4
-1 4 BHK 189 B5
-1 4 BHK 228 B6
-1 4 BHK 228 B7
-1 4 BHK 189 B8
-1 4 BHK 189 B9
-1 4 BHK 189 B10
-1 4 BHK 178 B11
-1 4 BHK 178 B12
-1 4 BHK 178 B13
-1 4 BHK 178 B14
-1 4 BHK 178 B15
-1 4 BHK 183 B16
-1 4 BHK 183 B17
-1 4 BHK 183 B18
-1 4 BHK 183 B19
-1 4 BHK 189 B20
-1 4 BHK 189 B21
-1 4 BHK 189 B22
-1 4 BHK 189 B23
-1 4 BHK 183 B24
-1 4 BHK 183 B25
-1 4 BHK 183 B26
-1 4 BHK 183 B27
-1 4 BHK 267 B28
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Od 3 PH 2 Panchayat NOC.Pdf
Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 NA.Pdf
Fd 2 NA.Pdf
Fd 3 NA.Pdf
Fd 4 NA.Pdf
Fd 5 NA.Pdf
Fd 6 NA.Pdf
Fd 7 NA.Pdf
Fd 8 NA.Pdf
Fd 9 NA.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Noc 8 Lift Authorities( Annexure - 102 )
Noc 9 BMRCL( Annexure - 103 )
Noc 10 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 11 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 12 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 13 Coastal Regulation Zone Authority( Annexure - 107 )
Photo 1 Project Photo
Od 1 Source Of Water Supply.Jpeg
Od 2 PH 2 Labor NOC Panchayat.Pdf
Od 4 Aakarband.Pdf
Od 5 ADLR Sketch.Pdf
Od 6 CLU.Pdf
Od 7 Confirmation Deed.Pdf
Od 8 Guidance Value Certificate.Pdf
Od 9 Himbaraha.Pdf
Od 10 Hissa Phody.Pdf
Od 11 Master Plan.Pdf
Od 12 Old Sale Deed.Pdf
Od 13 Release Deed.Pdf
Od 14 Sy Tippani.Pdf
Od 15 Village Map.Pdf
Od 16 VSSSN MR.Pdf
Od 17 GPA.Pdf
Od 18 Inventory Ph-02.Pdf
Od 19 Land Cost P2.Pdf
Od 20 No Mortgage P2.Pdf
Od 21 Sharing Agreement P2.Pdf
Ed 1 07-04-2025
Ed 2 07-04-2025
Ed 3 07-04-2025
Ed 4 07-04-2025
Ed 5 07-04-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank IDFC FIRST BANK
Account Number (RERA) 10219933785
IFSC IDFB0080172
Branch Address HSR LAYOUT
Country/City