Whitewinds Aadya Heights RERA Details - PRM/KA/RERA/1251/446/PR/311222/005594 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Whitewinds Aadya Heights under registration PRM/KA/RERA/1251/446/PR/311222/005594 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/311222/005594
  • Project Name AADYA HEIGHTS
  • Project Type Residential/Group Housing
  • Project Status Ready to Move
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 31 December 2025
  • Documents 58 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 September 2022 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2025 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED
Registered Address No. 130/2B, BOMMENAHALLI, NEAR PRESTIGE TRANQUILITY, DEVANAHALLI ROAD,BUDIGERE CROSS, OFF OLD MADRAS ROAD ,Bengaluru East ,Bengaluru Urban-560049
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address SY. NO. 130/2B (PART), GP KHATHA NO. 278/259/153/1 & E KHATHA NO. 150200401601600268 , BOMMENAHALLI VILLAGE, BIDARAHALLI HOBLI , Bengaluru East , Bengaluru Urban, Karnataka - 560049

RERA Coordinates

Latitude, Longitude 13.063312, 77.745569
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. HOYOPRA/CC/24/2021-22
Authority BMRDA - Bangalore Metropolitan Region Development Authority
Approved Date 09 September 2021

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
AADYA HEIGHTS 0 9 0 109 Residential 26.86 8 98

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • AADYA HEIGHTS
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 100.2658388 A01
GF 2 BHK 85.17995241 A02
GF 2 BHK 85.17995241 A03
GF 2 BHK 85.17995241 A04
GF 2 BHK 85.17995241 A05
GF 2 BHK 85.17995241 A06
GF 2 BHK 85.17995241 A07
GF 2 BHK 85.17995241 A08
GF 2 BHK 85.17995241 A09
GF 2 BHK 85.17995241 A10
GF 2 BHK 85.17995241 A11
GF 2 BHK 85.17995241 A12
GF 2 BHK 85.17995241 A13
GF 2 BHK 85.17995241 A14
GF 2 BHK 85.17995241 A15
GF 3 BHK 100.2658388 A16
GF 2 BHK 85.17995241 A17
GF 2 BHK 85.17995241 A18
GF 2 BHK 85.17995241 A19
GF 3 BHK 100.2658388 A20
GF 3 BHK 100.2658388 A21
GF 2 BHK 85.17995241 A22
GF 2 BHK 85.17995241 A23
GF 2 BHK 85.17995241 A24
GF 2 BHK 85.17995241 A25
2 3 BHK 100.2658388 A1
2 2 BHK 85.17995241 A2
2 2 BHK 85.17995241 A3
2 2 BHK 85.17995241 A4
2 2 BHK 85.17995241 A5
2 2 BHK 85.17995241 A6
2 2 BHK 85.17995241 A7
2 2 BHK 85.17995241 A8
2 2 BHK 85.17995241 A9
2 2 BHK 85.17995241 A10
2 2 BHK 85.17995241 A11
2 2 BHK 85.17995241 A12
2 2 BHK 85.17995241 A13
2 2 BHK 85.17995241 A14
2 2 BHK 85.17995241 A15
2 3 BHK 100.2658388 A16
2 2 BHK 85.17995241 A17
2 2 BHK 85.17995241 A18
2 2 BHK 85.17995241 A19
2 3 BHK 100.2658388 A20
2 3 BHK 100.2658388 A21
2 2 BHK 85.17995241 A22
2 2 BHK 85.17995241 A23
2 2 BHK 85.17995241 A24
2 2 BHK 85.17995241 A25
4 3 BHK 100.2658388 A1
4 2 BHK 85.17995241 A2
4 2 BHK 85.17995241 A3
4 2 BHK 85.17995241 A4
4 2 BHK 85.17995241 A5
4 2 BHK 85.17995241 A6
4 2 BHK 85.17995241 A7
4 2 BHK 85.17995241 A8
4 2 BHK 85.17995241 A9
4 2 BHK 85.17995241 A10
4 2 BHK 85.17995241 A11
4 2 BHK 85.17995241 A12
4 2 BHK 85.17995241 A13
4 2 BHK 85.17995241 A14
4 2 BHK 85.17995241 A15
4 3 BHK 100.2658388 A16
4 2 BHK 85.17995241 A17
4 2 BHK 85.17995241 A18
4 2 BHK 85.17995241 A19
4 3 BHK 100.2658388 A20
4 3 BHK 100.2658388 A21
4 2 BHK 85.17995241 A22
4 2 BHK 85.17995241 A23
4 2 BHK 85.17995241 A24
4 2 BHK 85.17995241 A25
6 3 BHK 100.2658388 A1
6 2 BHK 85.17995241 A2
6 2 BHK 85.17995241 A3
6 2 BHK 85.17995241 A4
6 2 BHK 85.17995241 A5
6 2 BHK 85.17995241 A6
6 2 BHK 85.17995241 A7
6 2 BHK 85.17995241 A8
6 2 BHK 85.17995241 A9
6 2 BHK 85.17995241 A10
6 2 BHK 85.17995241 A11
6 2 BHK 85.17995241 A12
6 2 BHK 85.17995241 A13
6 2 BHK 85.17995241 A14
6 2 BHK 85.17995241 A15
6 3 BHK 100.2658388 A16
6 2 BHK 85.17995241 A17
6 2 BHK 85.17995241 A18
6 2 BHK 85.17995241 A19
6 2 BHK 85.17995241 A22
6 2 BHK 85.17995241 A23
6 2 BHK 85.17995241 A24
6 2 BHK 85.17995241 A25
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 BS 21-22.Pdf
Fd 2 BS 20-21.Pdf
Fd 3 BS 19-20.Pdf
Fd 4 PL 21-22.Pdf
Fd 5 PL 20-21.Pdf
Fd 6 PL 19-20.Pdf
Fd 7 ITR 21-22.Pdf
Fd 8 ITR 20-21.Pdf
Fd 9 ITR 19-20.Pdf
Fd 10 BR 21-22.Pdf
Fd 11 BR 20-21.Pdf
Fd 12 BR 19-20.Pdf
Fd 13 CF 21-22.Pdf
Fd 14 CF 20-21.Pdf
Fd 15 CF 19-20.Pdf
Fd 16 AR 21-22.Pdf
Fd 17 AR 20-21.Pdf
Fd 18 AR 19-20.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Photo 1 Project Photo
Od 1 Sub Registrar Certified Copy Guidance Value.Pdf
Od 2 737 85 KLD STP GA DRAWING.Pdf
Od 3 DRAFT SALE DEED.Pdf
Od 4 SINGLE LAYOUT.Pdf
Ed 1 12-12-2022
Ed 2 12-12-2022
Ed 3 12-12-2022
Ed 4 12-12-2022
Ed 5 12-12-2022
Ed 6 12-12-2022
Ed 7 12-12-2022
Ed 8 12-12-2022
Ed 9 12-12-2022
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI Bank
Account Number (RERA) 317005001215
IFSC ICIC0003170
Branch Address KANNAMANGALA BRANCH, BANGALORE
Country/City