RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P51800012841
  • Project Name Adora Enclave Residency / Commercial
  • Project Type Others
  • Project Status Ready to Move
  • State Maharashtra
  • District Mumbai Suburban
  • Taluka Kurla
  • Village Kurla
  • Original Completion 12 January 2022
  • Revised Completion 12 January 2022
  • Project Area (in Sq.mt.) 338.31
  • Total Buildings/Towers 1
  • Documents 22 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 07 September 2017 Expected commencement of civil works and foundation on site.
Original Completion 12 January 2022 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 12 January 2022 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Individual
Experience Details
Project NameAddressLand AreaProject StatusType of ProjectBuild Plot CountApartment countProposed Completion DateProject End DateLitigation PresentLitigation Details
Krish ResidenceTilak Road Ghatkopar East750CompletedResidential / Group Housing1252007-12-312008-07-31NoNA

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors No. of Habitable Floor No. of Sanctioned Apartment Wing Name
Adora Enclave Residency / Commercial Alena Residency / Commercial 0 0 13 0 0 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 23
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 19 units · avg area 44.82 Sq.mt.
Office 3 units · avg area 66.30 Sq.mt.
MP Room 1 unit · avg area 22.58 Sq.mt.
  • Alena Residency / Commercial
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
1BHK 45.46 17 17
1BHK 36.98 1 1
Office 66.3 3 3
1BHK 41.81 1 1
MP Room 22.58 1 1
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths 90.0% Water Supply 90.0% Sewerage (Chamber, Lines, Septic Tank , Stp) 90.0%
Storm Water Drains 85.0% Landscaping & Tree Planting 30.0% Street Lighting 30.0%
Community Buildings 85.0% Treatment And Disposal Of Sewage And Sullage Water 85.0% Solid Waste Management And Disposal 85.0%
Water Conservation /Rain Water Harvesting 85.0% Energy Managemcnt 85.0% Fire Protection And Fire Safety Requirements 85.0%
Electrical Meter Room, Sub-station, Receiving Station 85.0% Aggregate Area Of Recreational Open Space % not reported Open Parking % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • Alena Residency / Commercial
Alena Residency / Commercial · Overall Progress 77%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
In Progress
% Work90%
Sanitary Fittings within the flats / premises
In Progress
% Work90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
In Progress
% Work90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
In Progress
% Work90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
In Progress
% Work90%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Details Html
1 4 OB 9 IOD (1).Pdf.Pdf
2 1ST FLOOR PLAN.Pdf.Pdf
3 2 Attachment Approved Plan Adora (1).Pdf.Pdf
4 2ND FLOOR PLAN.Pdf.Pdf
5 7TH FLOOR PLAN (REFUGEE).Pdf.Pdf
6 REVISED 3RD TO 6TH 8TH TO 12TH.Pdf.Pdf
7 GROUND PANS.Pdf.Pdf
8 Images.Pdf.Pdf
9 HPA SPACES Mail Adora 11 2 20 Hearing Submissions.Pdf.Pdf
10 Adora.Pdf.Pdf
11 Adora1.Pdf.Pdf
12 Adora2.Pdf.Pdf
13 Quotation For Adora Enclave Gatkopar East.Pdf.Pdf
14 Gmail Fwd Without Prejudice Consent Terms Adora Enclave Upload In Adora Rera Site Including Details Of Mail Sent To Rsprabhu Caption.Pdf.Pdf
15 HP.Pdf.Pdf
16 RM HPA Spaces.Pdf.Pdf
17 ANNEXURE A.Pdf.Pdf
18 9 FORM B ADORE.Pdf.Pdf
19 3 OB 9 MHADA NOC.Pdf.Pdf
20 12 Attachment AGREEMENT FOR SALE OB9 CHANGED.Pdf.Pdf
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ABHYUDAYA COOPERATIVE BANK LIMITED
IFSC ABHY0065054
Branch Address Amar Mahal, Chembur, Mumbai 400089
Country/City