Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.mh

Runwal Elina RERA Details - P51800000072, Mumbai

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Runwal Elina under registration P51800000072 in Mumbai, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P51800000072
  • Project Name Runwal Elina
  • Project Type Residential / Group Housing
  • Project Status Ready to Move
  • State Maharashtra
  • District Mumbai Suburban
  • Taluka Kurla
  • Village Kurla
  • Original Completion 31 December 2017
  • Revised Completion 31 December 2018
  • Project Area (in Sq.mt.) 4,539.5
  • Total Buildings/Towers 4
  • Documents 3 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 22 June 2017 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2017 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 31 December 2018 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Company
Individule Name RUNWAL DEVELOPERS PRIVATE LIMITED

Promoters, Co-promoters & Members

NameRoleAddress
PALLAVI MATKARIDirectorMumbai City, MAHARASHTRA
SUJATA RAODirectorMumbai City, MAHARASHTRA

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors No. of Habitable Floor No. of Sanctioned Apartment Wing Name
Runwal Elina Wing A 8 67 18 0 0 NA
Runwal Elina Wing B 8 60 18 0 0 NA
Runwal Elina Wing C 4 1 18 0 0 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 126
Configurations 4
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 1 unit · avg area 36.06 Sq.mt.
2 BHK 76 units · avg area 65.84 Sq.mt.
3 BHK 26 units · avg area 96.72 Sq.mt.
5 BHK 23 units · avg area 87.17 Sq.mt.
  • Wing A
  • Wing B
  • Wing C
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
3 BHK 96.49 5 5
3 BHK 94.88 5 5
2 BHK 71.01 3 3
3 BHK 98.3 8 7
3 BHK 96.43 8 7
2 BHK 62.6 1 1
2 BHK 60.08 5 5
2 BHK 60.86 5 5
2 BHK 68.92 2 2
2 BHK 69.84 9 9
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths 100.0% Water Supply 100.0% Sewerage (Chamber, Lines, Septic Tank , Stp) 100.0%
Storm Water Drains 100.0% Landscaping & Tree Planting 100.0% Street Lighting % not reported
Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water 100.0% Solid Waste Management And Disposal 100.0%
Water Conservation /Rain Water Harvesting 100.0% Energy Managemcnt % not reported Fire Protection And Fire Safety Requirements 100.0%
Electrical Meter Room, Sub-station, Receiving Station 100.0% Aggregate Area Of Recreational Open Space 100.0% Open Parking 100.0%
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • Wing A
  • Wing B
  • Wing C
Wing A · Overall Progress 91%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Complete
% Work100%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Extension Certificate Pdf
Mh Details Html
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank INDUSIND BANK
IFSC INDB0000006
Branch Address Nariman Point Mumbai
Country/City