Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.mh

Armstrong Hex World RERA Details - P52000012671, Navi Mumbai

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Armstrong Hex World under registration P52000012671 in Navi Mumbai, MAHARASHTRA. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P52000012671
  • Project Name HEX WORLD
  • Project Type Others
  • Project Status Under Construction
  • State MAHARASHTRA
  • District Raigarh
  • Taluka Panvel
  • Village Rohinjan
  • Original Completion 31 December 2018
  • Revised Completion 30 December 2034
  • Project Area (in Sq.mt.) 62,140
  • Total Buildings/Towers 12
  • Documents 20 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 07 September 2017 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2018 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 December 2034 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Company
Individule Name Devisha Infrastructure Private Limited
Experience Details
Project NameAddressLand AreaType of ProjectBuild Plot CountApartment countProject End Date
HEX BLOXPlot No 269 Sector 10 Kharghar Navi Mumbai9999Residential63202010-10-19
Other Description NA

Promoters, Co-promoters & Members

NameRole
Sameer Magan BhujbalAuthorized Signatory
Pankaj Chhagan BhujbalAuthorized Signatory
Satyan Appa KesarkarAuthorized Signatory

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Basements No. of Plinth No. of Podium No. of Slab No. of Slits No. of Open Parking No. of Closed Parking
HEX WORLD Tower-1 1 1 1 39 1 18 280
HEX WORLD Tower-2 1 1 1 39 1 18 280
HEX WORLD Tower-3 1 1 1 39 1 18 280
HEX WORLD Tower-4 1 1 1 39 1 18 280
HEX WORLD Tower-5 1 1 1 39 1 18 280
HEX WORLD Tower-6 1 1 1 39 1 18 280
HEX WORLD Tower-7 1 1 1 39 1 18 280
HEX WORLD Tower-8 1 1 1 39 1 19 279
HEX WORLD Tower-9 1 1 1 39 1 19 279
HEX WORLD Tower-A MMRDA 0 1 0 24 1 0 0
HEX WORLD Tower-B MMRDA 0 1 0 24 1 0 0
HEX WORLD Tower-C MMRDA 0 1 0 24 1 0 0

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 5967
Configurations 4
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 1668 units · avg area 38.09 Sq.mt.
1 RK 3256 units · avg area 17.48 Sq.mt.
2 BHK 1014 units · avg area 57.78 Sq.mt.
SHOP 29 units · avg area 18.71 Sq.mt.
  • Tower-1
  • Tower-2
  • Tower-3
  • Tower-4
  • Tower-5
  • Tower-6
  • Tower-7
  • Tower-8
  • Tower-9
  • Tower-A MMRDA
  • Tower-B MMRDA
  • Tower-C MMRDA
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
1 BHK 38.09 64 30
2 BHK 57.78 234 218
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage 0 0 0
Covered Parking 2518 0 0
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads Footpaths % not reported Water Conservation Rainwater Harvesting % not reported Energy Management % not reported
Fire Protection And Fire Safety Requirements % not reported Electrical Meter Room Substation Receivingstation % not reported Aggregate Area Of Recreational Open Space % not reported
Open Parking % not reported Water Supply % not reported Sewerage % not reported
Storm Water Drains % not reported Landscaping Tree Planting % not reported Street Lighting % not reported
Community Buildings % not reported Treatment And Disposal Of Sewage Sullage Water % not reported Solid Waste Management Disposal % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • Tower-1
  • Tower-2
  • Tower-3
  • Tower-4
  • Tower-5
  • Tower-6
  • Tower-7
  • Tower-8
  • Tower-9
  • Tower-A MMRDA
  • Tower-B MMRDA
  • Tower-C MMRDA
Tower-1 · Overall Progress 20%
Excavation
Complete
% Work100%
X number of Basement(s) and Plinth
Complete
% Work100%
X number of Podiums
Not Started
% Work0%
Stilt Floor
Not Started
% Work0%
X number of Slabs of Super Structure
Not Started
% Work0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Not Started
% Work0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Not Started
% Work0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Not Started
% Work0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Not Started
% Work0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Not Started
% Work0%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Details Html
Mh Certificate Pdf
Mh Details Pdf
1 Copy Of The Legal Title Report
1 Details Of Encumbrances
1 Copy Of Layout Approval (In Case Of Layout)
1 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order For Plotted Development
1 Declaration In FORM B
1 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
2 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
1 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
2 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
1 Certificates Of CA (Form 5)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2021-22)
2 Annual Audit Report Of Statutory CA (Form 5) (FY 2021-22)
1 Proforma Of Allotment Letter
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank The Saraswat Cooperative Bank Limited
IFSC SRCB0000009
Country/City