residential Ready to Move Source: rera.mh

Bathija Siddhivinayak Sparsh RERA Details - P52000011127, Navi Mumbai

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Bathija Siddhivinayak Sparsh under registration P52000011127 in Navi Mumbai, MAHARASHTRA. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P52000011127
  • Project Name SIDDHIVINAYAK SPARSH
  • Project Type Others
  • Project Status Ready to Move
  • State MAHARASHTRA
  • District Raigarh
  • Taluka Panvel
  • Village Karanjade
  • Original Completion 01 December 2015
  • Revised Completion 30 September 2018
  • Project Area (in Sq.mt.) 2,049.91
  • Total Buildings/Towers 1
  • Documents 13 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 31 August 2017 Expected commencement of civil works and foundation on site.
Original Completion 01 December 2015 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 September 2018 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Experience Details
Project NameAddressLand AreaType of ProjectBuild Plot CountApartment countProject End Date
SIDDHIVINAYAK JEWELKAMOTHE SECTOR 11 PLOT NO 11 NAVI MUMABI999.32Others1292011-02-22
SIDDHIVINAYAK TOWERKAMOTHE SEC 36 PLOT 39A NAVI MUMBAI1080.68Others1342010-07-30
SIDDHIVINAYAYK DIAMONDKAMOTHE SEC 12 PLOT NO 718 NAVI MUMBAI99.78Others152012-12-31
SIDDHIVINAYAK MAHIMKAMOTHE SEC 34 PLOT 100 101 137A 138945Others1352013-02-14

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Basements No. of Plinth No. of Podium No. of Slab No. of Slits No. of Open Parking No. of Closed Parking
SIDDHIVINAYAK SPARSH SIDDHIVINAYAK SPARSH 0 1 0 8 1 6 27

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 120
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
RESIDENTIAL 112 units · avg area 24.06 Sq.mt.
SHOP 8 units · avg area 20.61 Sq.mt.
  • SIDDHIVINAYAK SPARSH
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
RESIDENTIAL 28.87 2 2
SHOP 15 2 2
RESIDENTIAL 23.11 3 2
RESIDENTIAL 23.73 8 4
RESIDENTIAL 25.43 2 2
RESIDENTIAL 24.41 24 11
RESIDENTIAL 25.07 2 1
RESIDENTIAL 25.11 2 1
RESIDENTIAL 23.99 16 8
RESIDENTIAL 15.79 2 2
RESIDENTIAL 16.81 4 3
RESIDENTIAL 22.09 2 1
RESIDENTIAL 25.76 13 7
RESIDENTIAL 26.97 2 1
SHOP 13.53 3 1
RESIDENTIAL 22.09 12 6
RESIDENTIAL 24.69 2 1
SHOP 24.67 1 1
SHOP 34.82 2 0
RESIDENTIAL 25.11 2 1
RESIDENTIAL 25.41 4 3
RESIDENTIAL 25.65 8 4
RESIDENTIAL 26.81 2 2
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage 0 0 0
Covered Parking 27 0 95
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads Footpaths % not reported Water Conservation Rainwater Harvesting % not reported Energy Management % not reported
Fire Protection And Fire Safety Requirements % not reported Electrical Meter Room Substation Receivingstation % not reported Aggregate Area Of Recreational Open Space % not reported
Open Parking % not reported Water Supply % not reported Sewerage 100%
Storm Water Drains 100% Landscaping Tree Planting 100% Street Lighting % not reported
Community Buildings % not reported Treatment And Disposal Of Sewage Sullage Water % not reported Solid Waste Management Disposal % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • SIDDHIVINAYAK SPARSH
SIDDHIVINAYAK SPARSH · Overall Progress 90%
Excavation
Complete
% Work100%
X number of Basement(s) and Plinth
Complete
% Work100%
X number of Podiums
Not Started
% Work0%
Stilt Floor
Complete
% Work100%
X number of Slabs of Super Structure
Complete
% Work100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Complete
% Work100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Complete
% Work100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Complete
% Work100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Complete
% Work100%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Details Html
Mh Certificate Pdf
Mh Details Pdf
1 Copy Of The Legal Title Report
1 Details Of Encumbrances
1 Copy Of Layout Approval (In Case Of Layout)
2 Copy Of Layout Approval (In Case Of Layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
1 Declaration In FORM B
1 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
1 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
1 Proforma Of Allotment Letter
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank AXIS BANK
IFSC UTIB0001965
Country/City