RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P52000032339
  • Project Name HECC-SAI CITY
  • Project Type Residential / Group Housing
  • Project Status Under Construction
  • State Maharashtra
  • District Raigarh
  • Taluka Roha
  • Village Roha Ashtami (M Cl)
  • Original Completion 31 December 2026
  • Revised Completion 31 December 2026
  • Project Area (in Sq.mt.) 4,857.0
  • Total Buildings/Towers 3
  • Documents 2 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 29 December 2021 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2026 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 31 December 2026 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Individual
Experience Details
Project NameAddressLand AreaProject StatusType of ProjectBuild Plot CountApartment countProposed Completion DateProject End DateLitigation PresentLitigation Details
The Pearl ParkRoha Nagothane Road930CompletedIndustrial1522020-06-302019-06-25NoNA
Amaan GreensRoha1390CompletedResidential / Group Housing1362021-06-302020-06-19NoNA

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors CC Issued No. of Habitable Floor No. of Sanctioned Apartment Wing Name
HECC-SAI CITY WING C-SAI SHRADDHA 10 1 8 8 7 42 NA
HECC-SAI CITY WING D-SAI SHARAD 10 1 8 8 7 28 NA
HECC-SAI CITY WING E-SAI SANGAM 10 1 8 8 7 42 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 112
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 96 units · avg area 38.81 Sq.mt.
1RK 4 units · avg area 25.09 Sq.mt.
2 BHK 12 units · avg area 58.26 Sq.mt.
  • WING C-SAI SHRADDHA
  • WING D-SAI SHARAD
  • WING E-SAI SANGAM
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
1BHK 38.09 14 0
1RK 27.28 1 0
2BHK 58.16 5 0
1RK 22.91 1 0
2BHK 59.42 1 0
1BHK 40.92 6 0
1BHK 38.66 1 0
1BHK 39.13 1 0
1BHK 39.26 5 0
1BHK 39.76 1 0
1BHK 39.37 6 0
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths 60.0% Water Supply 40.0% Sewerage (Chamber, Lines, Septic Tank , Stp) 60.0%
Storm Water Drains 60.0% Landscaping & Tree Planting 60.0% Street Lighting 60.0%
Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water % not reported Solid Waste Management And Disposal % not reported
Water Conservation /Rain Water Harvesting 40.0% Energy Managemcnt % not reported Fire Protection And Fire Safety Requirements % not reported
Electrical Meter Room, Sub-station, Receiving Station 60.0% Aggregate Area Of Recreational Open Space 60.0% Open Parking 60.0%
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • WING C-SAI SHRADDHA
  • WING D-SAI SHARAD
  • WING E-SAI SANGAM
WING C-SAI SHRADDHA · Overall Progress 34%
Excavation
Complete
% Work100%
Basement (if any)
Not Started
% Work0%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Complete
% Work100%
Slabs of Super Structure
In Progress
% Work75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Not Started
% Work0%
Sanitary Fittings within the flats / premises
Not Started
% Work0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Not Started
% Work0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Not Started
% Work0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Not Started
% Work0%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Details Html
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank STATE BANK OF INDIA
IFSC SBIN0000521
Branch Address Dabir Park Roha Dist Raigad 402109