residential Under Construction Source: rera.mh

Mazagon Dock Mandar CHSL RERA Details - P52000025935, Navi Mumbai

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Mazagon Dock Mandar CHSL under registration P52000025935 in Navi Mumbai, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P52000025935
  • Project Name MAZAGON DOCK MANDAR CO-OP. HSG.SOC.LTD.
  • Project Type Others
  • Project Status Under Construction
  • State Maharashtra
  • District Raigarh
  • Taluka Panvel
  • Village New Panvel
  • Original Completion 27 July 2024
  • Revised Completion 31 January 2027
  • Project Area (in Sq.mt.) 6,309.0
  • Total Buildings/Towers 2
  • Documents 3 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 31 July 2020 Expected commencement of civil works and foundation on site.
Original Completion 27 July 2024 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 31 January 2027 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Society
Individule Name MAZAGON DOCK MANDAR CO-OP HSG SOC LTD

Promoters, Co-promoters & Members

NameRoleAddress
Cyril Antony DsouzaSecretoryThane, MAHARASHTRA

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors CC Issued No. of Habitable Floor No. of Sanctioned Apartment Wing Name
MAZAGON DOCK MANDAR CO-OP. HSG.SOC.LTD. Mandar Bldg 1 56 50 16 16 14 110 NA
MAZAGON DOCK MANDAR CO-OP. HSG.SOC.LTD. Mandar Bldg 2 0 104 16 16 12 124 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 234
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 133 units · avg area 32.92 Sq.mt.
2 BHK 101 units · avg area 55.85 Sq.mt.
  • Mandar Bldg 1
  • Mandar Bldg 2
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
1BHK 32.28 14 7
1BHK 32.77 13 5
2BHK 54.2 14 1
2BHK 54.83 13 1
2BHK 64.71 1 0
2BHK 88.1 1 1
1BHK 32.13 26 13
2BHK 63.58 28 10
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Fire Protection And Fire Safety Requirements % not reported Internal Roads & Footpaths % not reported Water Supply % not reported
Sewerage (Chamber, Lines, Septic Tank , Stp) % not reported Storm Water Drains % not reported Landscaping & Tree Planting % not reported
Street Lighting % not reported Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water % not reported
Solid Waste Management And Disposal % not reported Water Conservation /Rain Water Harvesting % not reported Energy Managemcnt % not reported
Electrical Meter Room, Sub-station, Receiving Station % not reported Aggregate Area Of Recreational Open Space % not reported Open Parking % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • Mandar Bldg 1
  • Mandar Bldg 2
Mandar Bldg 1 · Overall Progress 79%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Complete
% Work100%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
In Progress
% Work95%
Sanitary Fittings within the flats / premises
In Progress
% Work13%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
In Progress
% Work92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
In Progress
% Work70%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Extension Certificate Pdf
Mh Details Html
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank GS Mahanagar Co-operative Bank Limited, Mumbai
IFSC MCBL0960005
Branch Address 82C Rajashree Bldg N G Acharya Marg Chembur Mumbai 4000071
Country/City