Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.mh

Omkar Planet RERA Details - P51700029084, Navi Mumbai

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Omkar Planet under registration P51700029084 in Navi Mumbai, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P51700029084
  • Project Name OMKAR PLANET
  • Project Type Residential / Group Housing
  • Project Status Under Construction
  • State Maharashtra
  • District Thane
  • Taluka Thane
  • Village Navi Mumbai (M Corp.)
  • Original Completion 08 December 2024
  • Revised Completion 30 June 2027
  • Project Area (in Sq.mt.) 2,360.0
  • Total Buildings/Towers 2
  • Documents 72 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 26 April 2021 Expected commencement of civil works and foundation on site.
Original Completion 08 December 2024 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 June 2027 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Partnership
Individule Name OMKAR ENTERPRISES

Promoters, Co-promoters & Members

NameRoleAddress
SHAFIQUE ABDUL LATIF BHATKARPartnerRaigarh, MAHARASHTRA
HABIB MOHAMMED UMAR KHANPartnerMumbai Suburban, MAHARASHTRA
MOHAMED MAAZ ABDUL WAHEB DOKADIAPartnerMumbai City, MAHARASHTRA
SULEMAN KAMAL SHAIKHPartnerRaigarh, MAHARASHTRA
PALLAV MAHAVEER FADIAPartnerRaigarh, MAHARASHTRA
RAJESHKUMAR MULCHAND CHAVALAPartnerRaigarh, MAHARASHTRA

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors CC Issued No. of Habitable Floor No. of Sanctioned Apartment Wing Name
OMKAR PLANET OMKAR PLANET - A WING - DATTGURU - REHAB 0 35 29 25 25 138 NA
OMKAR PLANET OMKAR PLANET - B WING SALE WING 0 35 22 16 16 26 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 162
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 13 units · avg area 47.66 Sq.mt.
3 BHK 13 units · avg area 62.47 Sq.mt.
REHAB WING A 136 units · avg area 28.65 Sq.mt.
  • OMKAR PLANET - A WING - DATTGURU - REHAB
  • OMKAR PLANET - B WING SALE WING
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
REHAB WING A 28.65 136 0
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths % not reported Water Supply % not reported Sewerage (Chamber, Lines, Septic Tank , Stp) % not reported
Storm Water Drains % not reported Landscaping & Tree Planting % not reported Street Lighting % not reported
Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water % not reported Solid Waste Management And Disposal % not reported
Water Conservation /Rain Water Harvesting % not reported Energy Managemcnt % not reported Fire Protection And Fire Safety Requirements % not reported
Electrical Meter Room, Sub-station, Receiving Station % not reported Aggregate Area Of Recreational Open Space % not reported Open Parking % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • OMKAR PLANET - A WING - DATTGURU - REHAB
  • OMKAR PLANET - B WING SALE WING
OMKAR PLANET - A WING - DATTGURU - REHAB · Overall Progress 63%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Complete
% Work100%
Plinth
Complete
% Work100%
Stilt Floor
Complete
% Work100%
Slabs of Super Structure
In Progress
% Work67%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
In Progress
% Work56%
Sanitary Fittings within the flats / premises
Not Started
% Work0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
In Progress
% Work67%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Not Started
% Work0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Not Started
% Work0%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Extension Certificate Pdf
Mh Details Html
1 1 PAN Card.Pdf
2 1 Copy Of The Legal Title Report.Pdf
3 1 Details Of Encumbrances.Pdf
4 1 Copy Of Layout Approval (In Case Of Layout).Pdf
5 1 Building Plan Approval NA Order For Plotted Development.Pdf
6 2 Building Plan Approval NA Order For Plotted Development.Pdf
7 3 Building Plan Approval NA Order For Plotted Development.Pdf
8 4 Building Plan Approval NA Order For Plotted Development.Pdf
9 5 Building Plan Approval NA Order For Plotted Development.Pdf
10 1 Commencement Certificates NA Order For Plotted Development.Pdf
11 1 Declaration About Commencement Certificate.Pdf
12 1 Declaration In FORM B.Pdf
13 1 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
14 2 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
15 3 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
16 4 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
17 1 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
18 1 Disclosure Of Sold Booked Inventory.Pdf
19 2 Disclosure Of Sold Booked Inventory.Pdf
20 1 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
21 2 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
22 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2021 22).Pdf
23 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2022 23).Pdf
24 1 Proforma Of Allotment Letter.Pdf
25 2 Proforma Of Allotment Letter.Pdf
26 1 Separate Bank Account Details Including No Encumbrances On The Bank Account Or No Escrow On The Same.Pdf
27 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2023 24).Pdf
29 1 Engineers Certificate On Quality Assurance (Form 2A FY 2021 22).Pdf
31 1 Engineers Certificate On Quality Assurance (Form 2A FY 2022 23).Pdf
32 1 Engineers Certificate On Quality Assurance (Form 2A FY 2023 24).Pdf
38 2 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
41 3 Disclosure Of Sold Booked Inventory.Pdf
43 2 Engineers Certificate On Quality Assurance (Form 2A FY 2021 22).Pdf
49 16 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
50 15 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
51 14 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
52 13 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
53 12 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
54 11 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
55 10 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
56 9 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
57 8 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
58 7 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
59 6 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
60 5 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
66 3 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
67 4 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
68 5 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
69 6 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
70 7 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
71 8 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
75 3 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
76 4 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
77 5 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
78 6 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
79 7 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
80 8 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
86 Form 1.Pdf
87 Form 2.Pdf
88 Form 3.Pdf
89 Disclosure Of Sold And Booked Inventory.Pdf
166 Form 2A (FY 2021 2022).Pdf
167 Form 2A (FY 2022 2023).Pdf
168 Form 2A (FY 2023 2024).Pdf
169 Form 2A (FY 2024 2025).Pdf
170 Form 5 (FY 2024 2025).Pdf
171 Form 5 (FY 2021 2022).Pdf
172 Form 5 (FY 2022 2023).Pdf
173 Form 5 (FY 2023 2024).Pdf
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank AXIS BANK
IFSC UTIB0003321
Branch Address NERUL NAVI MUMBAI
Country/City