Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.mh

Wadhwa Wise City South Block Phase 1 B4 Wing F3 RERA Details - P52000016524, Navi Mumbai

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Wadhwa Wise City South Block Phase 1 B4 Wing F3 under registration P52000016524 in Navi Mumbai, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P52000016524
  • Project Name Wise City, South Block Phase I, Plot RZ8 Building 4 Wing F3
  • Project Type Residential / Group Housing
  • Project Status Under Construction
  • State Maharashtra
  • District Raigarh
  • Taluka Panvel
  • Village Wardoli
  • Original Completion 30 December 2026
  • Revised Completion 30 December 2026
  • Project Area (in Sq.mt.) 601.18
  • Total Buildings/Towers 1
  • Documents 2 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 21 May 2018 Expected commencement of civil works and foundation on site.
Original Completion 30 December 2026 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 December 2026 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Company
Individule Name Wadhwa Construction and Infrastructure Private Limited

Promoters, Co-promoters & Members

NameRoleAddress
Navin Amarlal MakhijaDirectorMumbai Suburban, MAHARASHTRA
Manohar Moolchand ChhabriaDirectorMumbai Suburban, MAHARASHTRA
Navin Amarlal MakhijaDirectorMumbai Suburban, MAHARASHTRA
Manohar Moolchand ChhabriaDirectorMumbai Suburban, MAHARASHTRA

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors No. of Habitable Floor No. of Sanctioned Apartment Wing Name
Wise City, South Block Phase I, Plot RZ8 Building 4 Wing F3 Wise City, South Block Phase I, Plot RZ8 Building 4 Wing F3 0 0 27 0 0 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 205
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 4 units · avg area 44.59 Sq.mt.
2 BHK 201 units · avg area 52.36 Sq.mt.
  • Wise City, South Block Phase I, Plot RZ8 Building 4 Wing F3
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
2BHK 58.32 101 54
1BHK 44.59 4 0
2BHK 48.87 16 15
2BHK 45.85 84 71
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths 97.0% Water Supply 95.0% Sewerage (Chamber, Lines, Septic Tank , Stp) 97.0%
Storm Water Drains 99.0% Landscaping & Tree Planting 91.0% Street Lighting 36.0%
Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water 98.0% Solid Waste Management And Disposal 97.0%
Water Conservation /Rain Water Harvesting 98.0% Energy Managemcnt % not reported Fire Protection And Fire Safety Requirements 80.0%
Electrical Meter Room, Sub-station, Receiving Station 98.0% Aggregate Area Of Recreational Open Space % not reported Open Parking % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • Wise City, South Block Phase I, Plot RZ8 Building 4 Wing F3
Wise City, South Block Phase I, Plot RZ8 Building 4 Wing F3 · Overall Progress 82%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Details Html
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI BANK LIMITED
IFSC ICIC0000038
Branch Address Krystal Building Water field Road Bandra West Mumbai
Country/City