Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Partially Ready To Move Source: rera.up

Eldeco Live By The Greens RERA Details - UPRERAPRJ15172, Noida

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Eldeco Live By The Greens under registration UPRERAPRJ15172 in Noida, Uttar Pradesh. Data is sourced from rera.up.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number UPRERAPRJ15172
  • Project Name ELDECO LIVE BY THE GREENS (PHASE I)
  • Project Type Residential
  • Project Status Partially Ready To Move
  • State Uttar Pradesh
  • District Gautam Buddha Nagar
  • Taluka Gautam Buddha Nagar
  • Authority Noida Authority
  • Original Completion 30 June 2025
  • Revised Completion 31 December 2024
  • Project Area (in Sq.mt.) 24,112
  • Documents 91 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 January 2018 Expected commencement of civil works and foundation on site.
Original Completion 30 June 2025 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 31 December 2024 No revision filed against the original committed handover date.
Project Duration
90 months
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

WONDROUS BUILDMART PRIVATE LIMITED Company
Promoter Type Company
Contact 9818871148
Email reraeldeco150@gmail.com
Registered Address Plot No.1B, 6th Floor, Ace Studio, Sector 126, Noida, Gautam Buddha Nagar, UP-201301
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Land Type Plot Plot No. SC-02/A9
Land Area (in Sq.mt.) 80,857

RERA Coordinates

Latitude, Longitude 28.418280023285763, 77.48763797780258
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Permit Number 2017/IV-1508/967
Permit Date 10 March 2017
Valid Upto 09 March 2022
Extendable Upto 08 March 2027

Approval Documents

Approved Layout PDF
Sanctioned Letter PDF
Approved Map PDF
Project Specifications PDF

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 575
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 219 units · avg area 62.23 Sq.mt.
3 BHK 356 units · avg area 76.90 Sq.mt.
  • LIFE-1 (Type-A)
  • LIFE-2 (Type-A)
  • VERVE-1 (Type-B)
  • VERVE-2 (Type-B)
  • VERVE-3 (Type-B)
  • VERVE-4 (Type-B)
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Apartment No. of Balcony No. of Verandah Balcony Area Verandah Area
GF 2 BHK 62.08 4 3 0 12.88 0
GF 2 BHK 62.83 1 3 0 13.03 0
1 2 BHK 62.08 4 3 0 12.88 0
1 2 BHK 62.83 1 3 0 13.03 0
2 2 BHK 62.08 4 3 0 12.88 0
2 2 BHK 62.83 1 3 0 13.03 0
3 2 BHK 62.08 4 3 0 12.88 0
3 2 BHK 62.83 1 3 0 13.03 0
4 2 BHK 62.08 4 3 0 12.88 0
4 2 BHK 62.83 1 3 0 13.03 0
5 2 BHK 62.08 4 3 0 12.88 0
5 2 BHK 62.83 1 3 0 13.03 0
6 2 BHK 62.08 4 3 0 12.88 0
6 2 BHK 62.83 1 3 0 13.03 0
7 2 BHK 62.08 4 3 0 12.88 0
7 2 BHK 62.83 1 3 0 13.03 0
8 2 BHK 62.08 4 3 0 12.88 0
8 2 BHK 62.83 1 3 0 13.03 0
9 2 BHK 62.08 4 3 0 12.88 0
9 2 BHK 62.83 1 3 0 13.03 0
10 2 BHK 62.08 4 3 0 12.88 0
10 2 BHK 62.83 1 3 0 13.03 0
11 2 BHK 62.08 4 3 0 12.88 0
11 2 BHK 62.83 1 3 0 13.03 0
12 2 BHK 62.08 4 3 0 12.88 0
12 2 BHK 62.83 1 3 0 13.03 0
13 2 BHK 62.08 4 3 0 12.88 0
13 2 BHK 62.83 1 3 0 13.03 0
14 2 BHK 62.08 4 3 0 12.88 0
14 2 BHK 62.83 1 3 0 13.03 0
15 2 BHK 62.08 4 3 0 12.88 0
15 2 BHK 62.83 1 3 0 13.03 0
16 2 BHK 62.08 4 3 0 12.88 0
16 2 BHK 62.83 1 3 0 13.03 0
17 2 BHK 62.08 4 3 0 12.88 0
17 2 BHK 62.83 1 3 0 13.03 0
18 2 BHK 62.08 4 3 0 12.88 0
18 2 BHK 62.83 1 3 0 13.03 0
19 2 BHK 62.08 4 3 0 12.88 0
19 2 BHK 62.83 1 3 0 13.03 0
20 2 BHK 62.08 4 3 0 12.88 0
20 2 BHK 62.83 1 3 0 13.03 0
21 2 BHK 62.08 4 3 0 12.88 0
21 2 BHK 62.83 1 3 0 13.03 0
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Demarcation Of Plots % not reported Boundary Wall 100% Road Work 100%
Footpaths 100% Water Supply Including Drinking Water Facilities % not reported Sewer System % not reported
Drain 100% Parks % not reported Tree Planting 100%
Design For Electric Supply Including Street Lighting % not reported Community Buildings 100% Treatment And Disposal System Of Sewage And Sullage Water 100%
Solid Waste Management And Disposal System % not reported Water Conservation System % not reported Energy Management System Including Use Of Renewable Energy % not reported
Fire Protection And Fire Safety System % not reported Social Infrastructure And Other Public Amenities Including Public Health Services % not reported Emergency Evacuation Services % not reported
Other Miscellaneous Work % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Ca Certificate PDF· 01-04-2020 To 30-06-2020
Architect Certificate PDF· 01-04-2020 To 30-06-2020
Engineer Certificate PDF· 01-04-2020 To 30-06-2020
Ca Certificate PDF· 01-07-2020 To 30-09-2020
Architect Certificate PDF· 01-07-2020 To 30-09-2020
Engineer Certificate PDF· 01-07-2020 To 30-09-2020
Ca Certificate PDF· 01-10-2020 To 31-12-2020
Architect Certificate PDF· 01-10-2020 To 31-12-2020
Engineer Certificate PDF· 01-10-2020 To 31-12-2020
Ca Certificate PDF· 01-01-2021 To 31-03-2021
Architect Certificate PDF· 01-01-2021 To 31-03-2021
Engineer Certificate PDF· 01-01-2021 To 31-03-2021
Ca Certificate PDF· 01-04-2021 To 30-06-2021
Architect Certificate PDF· 01-04-2021 To 30-06-2021
Engineer Certificate PDF· 01-04-2021 To 30-06-2021
Ca Certificate PDF· 01-07-2021 To 30-09-2021
Architect Certificate PDF· 01-07-2021 To 30-09-2021
Engineer Certificate PDF· 01-07-2021 To 30-09-2021
Ca Certificate PDF· 01-10-2021 To 31-12-2021
Architect Certificate PDF· 01-10-2021 To 31-12-2021
Engineer Certificate PDF· 01-10-2021 To 31-12-2021
Ca Certificate PDF· 01-01-2022 To 31-03-2022
Architect Certificate PDF· 01-01-2022 To 31-03-2022
Engineer Certificate PDF· 01-01-2022 To 31-03-2022
Ca Certificate PDF· 01-04-2022 To 30-06-2022
Architect Certificate PDF· 01-04-2022 To 30-06-2022
Engineer Certificate PDF· 01-04-2022 To 30-06-2022
Ca Certificate PDF· 01-07-2022 To 30-09-2022
Architect Certificate PDF· 01-07-2022 To 30-09-2022
Engineer Certificate PDF· 01-07-2022 To 30-09-2022
Ca Certificate PDF· 01-10-2022 To 31-12-2022
Architect Certificate PDF· 01-10-2022 To 31-12-2022
Engineer Certificate PDF· 01-10-2022 To 31-12-2022
Ca Certificate PDF· 01-01-2023 To 31-03-2023
Architect Certificate PDF· 01-01-2023 To 31-03-2023
Engineer Certificate PDF· 01-01-2023 To 31-03-2023
Ca Certificate PDF· 01-04-2023 To 30-06-2023
Architect Certificate PDF· 01-04-2023 To 30-06-2023
Engineer Certificate PDF· 01-04-2023 To 30-06-2023
Ca Certificate PDF· 01-07-2023 To 30-09-2023
Architect Certificate PDF· 01-07-2023 To 30-09-2023
Engineer Certificate PDF· 01-07-2023 To 30-09-2023
Ca Certificate PDF· 01-10-2023 To 31-12-2023
Architect Certificate PDF· 01-10-2023 To 31-12-2023
Engineer Certificate PDF· 01-10-2023 To 31-12-2023
Ca Certificate PDF· 01-01-2024 To 31-03-2024
Architect Certificate PDF· 01-01-2024 To 31-03-2024
Engineer Certificate PDF· 01-01-2024 To 31-03-2024
Ca Certificate PDF· 01-04-2024 To 30-06-2024
Architect Certificate PDF· 01-04-2024 To 30-06-2024
Engineer Certificate PDF· 01-04-2024 To 30-06-2024
Ca Certificate PDF· 01-07-2024 To 30-09-2024
Architect Certificate PDF· 01-07-2024 To 30-09-2024
Engineer Certificate PDF· 01-07-2024 To 30-09-2024
Ca Certificate PDF· 01-10-2024 To 31-12-2024
Architect Certificate PDF· 01-10-2024 To 31-12-2024
Engineer Certificate PDF· 01-10-2024 To 31-12-2024
Ca Certificate PDF· 01-01-2025 To 31-03-2025
Architect Certificate PDF· 01-01-2025 To 31-03-2025
Engineer Certificate PDF· 01-01-2025 To 31-03-2025
Ca Certificate PDF· 01-04-2025 To 30-06-2025
Architect Certificate PDF· 01-04-2025 To 30-06-2025
Engineer Certificate PDF· 01-04-2025 To 30-06-2025
Dd 1 Lease Deed
Dd 2 Lease Deed
Du 1 Details Of Encumbrances
Du 2 Commencement Certificate
Du 3 Other Plan(If Any)
Du 4 Proforma Of Application Form
Du 5 Proforma Of Allotment Letter
Du 6 Affidavit (Form-B)
Du 7 CA CERTIFICATE
Du 8 ARCHITECT CERTIFICATE
Du 9 ENGINEERS CERTIFICATE
Du 10 Registry Document In Case Of Own Land
Du 11 Authentic Copy Of Approval Of Project
Du 12 Authentic Copy Of Approval Of Project
Du 13 Authentic Copy Of Approval Of Project
Du 14 Authentic Copy Of Approval Of Project
Du 15 Authentic Copy Of Approval Of Project
Du 16 Sanctioned Layout Plan (Of Entire Project)
Du 17 Floor Plans Of All Types
Du 18 Floor Plans Of All Types
Du 19 Floor Plans Of All Types
Du 20 Floor Plans Of All Types
Du 21 Floor Plans Of All Types
Du 22 Floor Plans Of All Types
Du 23 Floor Plans Of All Types
Du 24 Affidavit (Form-B)
Du 25 Details Of Encumbrances
Du 26 Other Plan(If Any)
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Cost (in Lacs) ₹ 25,692
Registration Fee ₹ 1.26 L
Project Account Bank HDFC BANK LIMITED
Account Number (RERA) 57500000162803
IFSC HDFC0000923
Branch JASOLA VIHAR
Branch Address DLF TOWER-A, JASOLA VIHAR, NEW DELHI-110025
Country/City