Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential New Launch Source: rera.ka

NPS Natures Nest RERA Details - PRM/KA/RERA/1251/446/PR/090626/008711 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for NPS Natures Nest under registration PRM/KA/RERA/1251/446/PR/090626/008711 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/090626/008711
  • Project Name NATURE'S NEST
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 31 December 2031
  • Documents 135 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 April 2026 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2031 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

NPS DEVELOPERS
Registered Address Flat No. 302, Sri Sai Revera Apartment, ,6th Cross, Kaggadasapura, ,Bengaluru North ,Bengaluru Urban-560093
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy. No 45/1, 46, 47/2, 47/3, 47/4, 47/5, 47/6, 54/4, 54/6, 54/11, 54/12, 57/3, 57/4, 57/5, 57/9, 57/10, 59/2, 59/3, 59/4, 59/5, 59/6, BIDARE AGRAHARA , BIDARAHALLI HOBLI , Bengaluru East , Bengaluru Urban, Karnataka - 560067

RERA Coordinates

Latitude, Longitude 13.029169, 77.745783
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BDA/N M/A S/A .A-5/TP-4/P/70/2025-26
Authority BDA - Bangalore Development Authority
Approved Date 16 February 2026

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
1 2 28 1 216 Residential 90.0 27 216
2 2 18 1 136 Residential 90.0 17 136

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
  • 1
  • 2
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 100.1334 T1-0101
GF 4 BHK 139.6464 T1-0102
GF 3 BHK 99.69515 T1-0103
GF 2 BHK 71.066 T1-0104
GF 2 BHK 75.7681 T1-0105
GF 3 BHK 100.9579 T1-0106
GF 3 BHK 98.837 T1-0107
GF 3 BHK 98.87885 T1-0108
1 3 BHK 100.1334 T1-0201
1 4 BHK 139.6464 T1-0202
1 3 BHK 99.69515 T1-0203
1 2 BHK 71.066 T1-0204
1 2 BHK 75.7681 T1-0205
1 3 BHK 100.9579 T1-0206
1 3 BHK 98.837 T1-0207
1 3 BHK 98.87885 T1-0208
2 3 BHK 100.1334 T1-0301
2 4 BHK 139.6464 T1-0302
2 3 BHK 99.69515 T1-0303
2 2 BHK 71.066 T1-0304
2 2 BHK 75.7681 T1-0305
2 3 BHK 100.9579 T1-0306
2 3 BHK 98.837 T1-0307
2 3 BHK 98.87885 T1-0308
3 3 BHK 100.1334 T1-0401
3 4 BHK 139.6464 T1-0402
3 3 BHK 99.69515 T1-0403
3 2 BHK 71.066 T1-0404
3 2 BHK 75.7681 T1-0405
3 3 BHK 100.9579 T1-0406
3 3 BHK 98.837 T1-0407
3 3 BHK 98.87885 T1-0408
4 3 BHK 100.1334 T1-0501
4 4 BHK 139.6464 T1-0502
4 3 BHK 99.69515 T1-0503
4 2 BHK 71.066 T1-0504
4 2 BHK 75.7681 T1-0505
4 3 BHK 100.9579 T1-0506
4 3 BHK 98.837 T1-0507
4 3 BHK 98.87885 T1-0508
5 3 BHK 100.1334 T1-0601
5 4 BHK 139.6464 T1-0602
5 3 BHK 99.69515 T1-0603
5 2 BHK 71.066 T1-0604
5 2 BHK 75.7681 T1-0605
5 3 BHK 100.9579 T1-0606
5 3 BHK 98.837 T1-0607
5 3 BHK 98.87885 T1-0608
6 3 BHK 100.1334 T1-0701
6 4 BHK 139.6464 T1-0702
6 3 BHK 99.69515 T1-0703
6 2 BHK 71.066 T1-0704
6 2 BHK 75.7681 T1-0705
6 3 BHK 100.9579 T1-0706
6 3 BHK 98.837 T1-0707
6 3 BHK 98.87885 T1-0708
7 3 BHK 100.1334 T1-0801
7 4 BHK 139.6464 T1-0802
7 3 BHK 99.69515 T1-0803
7 2 BHK 71.066 T1-0804
7 2 BHK 75.7681 T1-0805
7 3 BHK 100.9579 T1-0806
7 3 BHK 98.837 T1-0807
7 3 BHK 98.87885 T1-0808
8 3 BHK 100.1334 T1-0901
8 4 BHK 139.6464 T1-0902
8 3 BHK 99.69515 T1-0903
8 2 BHK 71.066 T1-0904
8 2 BHK 75.7681 T1-0905
8 3 BHK 100.9579 T1-0906
8 3 BHK 98.837 T1-0907
8 3 BHK 98.87885 T1-0908
9 3 BHK 100.1334 T1-1001
9 4 BHK 139.6464 T1-1002
9 3 BHK 99.69515 T1-1003
9 2 BHK 71.066 T1-1004
9 2 BHK 75.7681 T1-1005
9 3 BHK 100.9579 T1-1006
9 3 BHK 98.837 T1-1007
9 3 BHK 98.87885 T1-1008
10 3 BHK 100.1334 T1-1101
10 4 BHK 139.6464 T1-1102
10 3 BHK 99.69515 T1-1103
10 2 BHK 71.066 T1-1104
10 2 BHK 75.7681 T1-1105
10 3 BHK 100.9579 T1-1106
10 3 BHK 98.837 T1-1107
10 3 BHK 98.87885 T1-1108
11 3 BHK 100.1334 T1-12A-01
11 4 BHK 139.6464 T1-12A-02
11 3 BHK 99.69515 T1-12A-03
11 2 BHK 71.066 T1-12A-04
11 2 BHK 75.7681 T1-12A-05
11 3 BHK 100.9579 T1-12A-06
11 3 BHK 98.837 T1-12A-07
11 3 BHK 98.87885 T1-12A-08
12 3 BHK 100.1334 T1-12B-01
12 4 BHK 139.6464 T1-12B-02
12 3 BHK 99.69515 T1-12B-03
12 2 BHK 71.066 T1-12B-04
12 2 BHK 75.7681 T1-12B-05
12 3 BHK 100.9579 T1-12B-06
12 3 BHK 98.837 T1-12B-07
12 3 BHK 98.87885 T1-12B-08
13 3 BHK 100.1334 T1-1401
13 4 BHK 139.6464 T1-1402
13 3 BHK 99.69515 T1-1403
13 2 BHK 71.066 T1-1404
13 2 BHK 75.7681 T1-1405
13 3 BHK 100.9579 T1-1406
13 3 BHK 98.837 T1-1407
13 3 BHK 98.87885 T1-1408
14 3 BHK 100.1334 T1-1501
14 4 BHK 139.6464 T1-1502
14 3 BHK 99.69515 T1-1503
14 2 BHK 71.066 T1-1504
14 2 BHK 75.7681 T1-1505
14 3 BHK 100.9579 T1-1506
14 3 BHK 98.837 T1-1507
14 3 BHK 98.87885 T1-1508
15 3 BHK 100.1334 T1-1601
15 4 BHK 139.6464 T1-1602
15 3 BHK 99.69515 T1-1603
15 2 BHK 71.066 T1-1604
15 2 BHK 75.7681 T1-1605
15 3 BHK 100.9579 T1-1606
15 3 BHK 98.837 T1-1607
15 3 BHK 98.87885 T1-1608
16 3 BHK 100.1334 T1-1701
16 4 BHK 139.6464 T1-1702
16 3 BHK 99.69515 T1-1703
16 2 BHK 71.066 T1-1704
16 2 BHK 75.7681 T1-1705
16 3 BHK 100.9579 T1-1706
16 3 BHK 98.837 T1-1707
16 3 BHK 98.87885 T1-1708
17 3 BHK 100.1334 T1-1801
17 4 BHK 139.6464 T1-1802
17 3 BHK 99.69515 T1-1803
17 2 BHK 71.066 T1-1804
17 2 BHK 75.7681 T1-1805
17 3 BHK 100.9579 T1-1806
17 3 BHK 98.837 T1-1807
17 3 BHK 98.87885 T1-1808
18 3 BHK 100.1334 T1-1901
18 4 BHK 139.6464 T1-1902
18 3 BHK 99.69515 T1-1903
18 2 BHK 71.066 T1-1904
18 2 BHK 75.7681 T1-1905
18 3 BHK 100.9579 T1-1906
18 3 BHK 98.837 T1-1907
18 3 BHK 98.87885 T1-1908
19 3 BHK 100.1334 T1-2001
19 4 BHK 139.6464 T1-2002
19 3 BHK 99.69515 T1-2003
19 2 BHK 71.066 T1-2004
19 2 BHK 75.7681 T1-2005
19 3 BHK 100.9579 T1-2006
19 3 BHK 98.837 T1-2007
19 3 BHK 98.87885 T1-2008
20 3 BHK 100.1334 T1-2101
20 4 BHK 139.6464 T1-2102
20 3 BHK 99.69515 T1-2103
20 2 BHK 71.066 T1-2104
20 2 BHK 75.7681 T1-2105
20 3 BHK 100.9579 T1-2106
20 3 BHK 98.837 T1-2107
20 3 BHK 98.87885 T1-2108
21 3 BHK 100.1334 T1-2201
21 4 BHK 139.6464 T1-2202
21 3 BHK 99.69515 T1-2203
21 2 BHK 71.066 T1-2204
21 2 BHK 75.7681 T1-2205
21 3 BHK 100.9579 T1-2206
21 3 BHK 98.837 T1-2207
21 3 BHK 98.87885 T1-2208
22 3 BHK 100.1334 T1-2301
22 4 BHK 139.6464 T1-2302
22 3 BHK 99.69515 T1-2303
22 2 BHK 71.066 T1-2304
22 2 BHK 75.7681 T1-2305
22 3 BHK 100.9579 T1-2306
22 3 BHK 98.837 T1-2307
22 3 BHK 98.87885 T1-2308
23 3 BHK 100.1334 T1-2401
23 4 BHK 139.6464 T1-2402
23 3 BHK 99.69515 T1-2403
23 2 BHK 71.066 T1-2404
23 2 BHK 75.7681 T1-2405
23 3 BHK 100.9579 T1-2406
23 3 BHK 98.837 T1-2407
23 3 BHK 98.87885 T1-2408
24 3 BHK 100.1334 T1-2501
24 4 BHK 139.6464 T1-2502
24 3 BHK 99.69515 T1-2503
24 2 BHK 71.066 T1-2504
24 2 BHK 75.7681 T1-2505
24 3 BHK 100.9579 T1-2506
24 3 BHK 98.837 T1-2507
24 3 BHK 98.87885 T1-2508
25 3 BHK 100.1334 T1-2601
25 4 BHK 139.6464 T1-2602
25 3 BHK 99.69515 T1-2603
25 2 BHK 71.066 T1-2604
25 2 BHK 75.7681 T1-2605
25 3 BHK 100.9579 T1-2606
25 3 BHK 98.837 T1-2607
25 3 BHK 98.87885 T1-2608
26 3 BHK 100.1334 T1-2701
26 4 BHK 139.6464 T1-2702
26 3 BHK 99.69515 T1-2703
26 2 BHK 71.066 T1-2704
26 2 BHK 75.7681 T1-2705
26 3 BHK 100.9579 T1-2706
26 3 BHK 98.837 T1-2707
26 3 BHK 98.87885 T1-2708
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Clar For No Financials.Pdf
Fd 2 Clar For No Financials.Pdf
Fd 3 Clar For No Financials.Pdf
Fd 4 Clar For No Financials.Pdf
Fd 5 Clar For No Financials.Pdf
Fd 6 Clar For No Financials.Pdf
Fd 7 Clar For No Financials.Pdf
Fd 8 Clar For No Financials.Pdf
Fd 9 Clar For No Financials.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Noc 8 Lift Authorities( Annexure - 102 )
Noc 9 BMRCL( Annexure - 103 )
Noc 10 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 11 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 12 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 13 Coastal Regulation Zone Authority( Annexure - 107 )
Photo 1 Project Photo
Od 1 Project Photo 2.Jpeg
Od 2 Project Photo 15.Jpeg
Od 3 Project Photo 18.Jpeg
Od 4 Project Photo 2.Jpeg
Od 5 Project Photo 6.Jpeg
Od 6 Project Photo 7.Jpeg
Ed 1 20-05-2026
Ed 2 20-05-2026
Ed 3 20-05-2026
Ed 4 20-05-2026
Ed 5 20-05-2026
Ed 6 20-05-2026
Ed 7 20-05-2026
Ed 8 20-05-2026
Ed 9 20-05-2026
Ed 10 20-05-2026
Ed 11 20-05-2026
Ed 12 20-05-2026
Ed 13 20-05-2026
Ed 14 20-05-2026
Ed 15 20-05-2026
Ed 16 20-05-2026
Ed 17 20-05-2026
Ed 18 20-05-2026
Ed 19 20-05-2026
Ed 20 20-05-2026
Ed 21 20-05-2026
Ed 22 20-05-2026
Ed 23 20-05-2026
Ed 24 20-05-2026
Ed 25 20-05-2026
Ed 26 20-05-2026
Ed 27 20-05-2026
Ed 28 20-05-2026
Ed 29 20-05-2026
Ed 30 20-05-2026
Ed 31 20-05-2026
Ed 32 20-05-2026
Ed 33 20-05-2026
Ed 34 20-05-2026
Ed 35 20-05-2026
Ed 36 20-05-2026
Ed 37 20-05-2026
Ed 38 25-05-2026
Ed 39 25-05-2026
Ed 40 25-05-2026
Ed 41 25-05-2026
Ed 42 25-05-2026
Ed 43 25-05-2026
Ed 44 25-05-2026
Ed 45 25-05-2026
Ed 46 25-05-2026
Ed 47 25-05-2026
Ed 48 25-05-2026
Ed 49 25-05-2026
Ed 50 25-05-2026
Ed 51 25-05-2026
Ed 52 25-05-2026
Ed 53 25-05-2026
Ed 54 25-05-2026
Ed 55 25-05-2026
Ed 56 25-05-2026
Ed 57 25-05-2026
Ed 58 25-05-2026
Ed 59 25-05-2026
Ed 60 25-05-2026
Ed 61 25-05-2026
Ed 62 25-05-2026
Ed 63 25-05-2026
Ed 64 25-05-2026
Ed 65 25-05-2026
Ed 66 25-05-2026
Ed 67 25-05-2026
Ed 68 25-05-2026
Ed 69 25-05-2026
Ed 70 25-05-2026
Ed 71 25-05-2026
Ed 72 25-05-2026
Ed 73 25-05-2026
Ed 74 25-05-2026
Ed 75 05-06-2026
Ed 76 05-06-2026
Ed 77 05-06-2026
Ed 78 05-06-2026
Ed 79 05-06-2026
Ed 80 05-06-2026
Ed 81 05-06-2026
Ed 82 05-06-2026
Ed 83 05-06-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Bank of Baroda
Account Number (RERA) 89340200001989
IFSC BARB0VJSNGR
Branch Address SANJAY NAGAR
Country/City