Perlite Premier RERA Details - PRM/KA/RERA/1251/308/PR/220526/008673 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Perlite Premier under registration PRM/KA/RERA/1251/308/PR/220526/008673 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/220526/008673
  • Project Name PERLITE PREMIER
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 31 December 2031
  • Documents 95 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 May 2026 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2031 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

M/s. PERLITE DEVELOPERS
Registered Address No. 1, Behind SVR College, Samasandarapalya, HSR Layout Bengaluru ,Bengaluru South ,Bengaluru Urban-560102
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address 82/3, 82/6, 82/7, 82/10, 82/11, 82/13, 82/14, & 82/15 to an extend of 8169.52 , Situated at Singena Agrahara Village, Sarjapura Hobli, Anekal Taluk, Bangalore , Anekal , Bengaluru Urban, Karnataka - 562125

RERA Coordinates

Latitude, Longitude 12.839274, 77.709644
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. 52/2025-26
Authority BDA - Bangalore Development Authority
Approved Date 05 November 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
BLOCK A & B 1 10 0 126 Residential 29.95 9 126

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • BLOCK A & B
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 2 BHK 73.87285278 101
GF 3 BHK 99.99535484 102
GF 3 BHK 99.99535484 103
GF 3 BHK 99.99535484 104
GF 3 BHK 99.99535484 105
GF 3 BHK 99.99535484 106
GF 3 BHK 99.99535484 107
GF 3 BHK 99.99535484 108
GF 3 BHK 103.6780349 109
GF 2 BHK 76.04585698 110
GF 2 BHK 84.87629948 111
GF 2 BHK 76.94980444 112
GF 2 BHK 78.4148868 113
GF 2 BHK 76.94980444 114
1 2 BHK 73.87 201
1 3 BHK 100.01 202
1 3 BHK 100.01 203
1 3 BHK 100.01 204
1 3 BHK 100.01 205
1 3 BHK 100.01 206
1 3 BHK 100.01 207
1 3 BHK 100.01 208
1 3 BHK 103.67 209
1 2 BHK 76.05 210
1 2 BHK 84.88 211
1 2 BHK 76.94 212
1 2 BHK 78.41 213
1 2 BHK 76.94 214
2 2 BHK 73.87 301
2 3 BHK 100.01 302
2 3 BHK 100.01 303
2 3 BHK 100.01 304
2 3 BHK 100.01 305
2 3 BHK 100.01 306
2 3 BHK 100.01 307
2 3 BHK 100.01 308
2 3 BHK 103.67 309
2 2 BHK 76.05 310
2 2 BHK 84.88 311
2 2 BHK 76.94 312
2 2 BHK 78.41 313
2 2 BHK 76.94 314
3 3 BHK 100.01 403
3 2 BHK 73.87 401
3 3 BHK 100.01 402
3 3 BHK 100.01 404
3 3 BHK 100.01 405
3 3 BHK 100.01 406
3 3 BHK 100.01 407
3 3 BHK 100.01 408
3 3 BHK 103.67 409
3 2 BHK 76.05 410
3 2 BHK 84.88 411
3 2 BHK 76.94 412
3 2 BHK 78.41 413
3 2 BHK 76.94 414
4 2 BHK 73.87 501
4 3 BHK 100.01 502
4 3 BHK 100.01 503
4 3 BHK 100.01 504
4 3 BHK 100.01 505
4 3 BHK 100.01 506
4 3 BHK 100.01 507
4 3 BHK 100.01 508
4 3 BHK 103.67 509
4 2 BHK 76.05 510
4 2 BHK 84.88 511
4 2 BHK 76.94 512
4 2 BHK 78.41 513
4 2 BHK 76.94 514
5 2 BHK 73.87 601
5 3 BHK 100.01 602
5 3 BHK 100.01 603
5 3 BHK 100.01 604
5 3 BHK 100.01 605
5 3 BHK 100.01 606
5 3 BHK 100.01 607
5 3 BHK 100.01 608
5 3 BHK 103.67 609
5 2 BHK 76.05 610
5 2 BHK 84.88 611
5 2 BHK 76.94 612
5 2 BHK 78.41 613
5 2 BHK 76.94 614
6 2 BHK 73.87 701
6 3 BHK 100.01 702
6 3 BHK 100.01 703
6 3 BHK 100.01 704
6 3 BHK 100.01 705
6 3 BHK 100.01 706
6 3 BHK 100.01 707
6 3 BHK 100.01 708
6 3 BHK 103.67 709
6 2 BHK 76.05 710
6 2 BHK 84.88 711
6 2 BHK 76.94 712
6 2 BHK 78.41 713
6 2 BHK 76.94 714
7 2 BHK 73.87 801
7 3 BHK 100.01 802
7 3 BHK 100.01 803
7 3 BHK 100.01 804
7 3 BHK 100.01 805
7 3 BHK 100.01 806
7 3 BHK 100.01 807
7 3 BHK 100.01 808
7 3 BHK 103.67 809
7 2 BHK 76.05 810
7 2 BHK 84.88 811
7 2 BHK 76.94 812
7 2 BHK 78.41 813
7 2 BHK 76.94 814
8 2 BHK 73.87 901
8 3 BHK 100.01 902
8 3 BHK 100.01 903
8 3 BHK 100.01 904
8 3 BHK 100.01 905
8 3 BHK 100.01 906
8 3 BHK 100.01 907
8 3 BHK 100.01 908
8 3 BHK 103.67 909
8 2 BHK 76.05 910
8 2 BHK 84.88 911
8 2 BHK 76.94 912
8 2 BHK 78.41 913
8 2 BHK 76.94 914
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Not Applicable.Pdf
Fd 2 Not Applicable.Pdf
Fd 3 Not Applicable.Pdf
Fd 4 Perlite Financial Statements FY24 25.Pdf
Fd 5 Not Applicable.Pdf
Fd 6 Not Applicable.Pdf
Fd 7 ITR.Pdf
Fd 8 Not Applicable.Pdf
Fd 9 Not Applicable.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 3 KSPCB( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Photo 1 Project Photo
Od 1 82 6 SALE DEED SRIDHAR.Pdf
Od 2 82 7 SALE DEED RAJAPPAREDDY.Pdf
Od 3 82-10 SALE DEED MANJUNATH.Pdf
Od 4 SALE DEED SHIRLY JOSHY.Pdf
Od 5 Single Layout Plan And Order.Pdf
Od 6 1 And 2 Floor Plan.Pdf
Od 7 BASEMENT FLOOR PLAN.Pdf
Od 8 CDP PLAN.Pdf
Od 9 FLOOR PLAN.Pdf
Od 10 GROUND FLOOR PLAN.Pdf
Od 11 Land Cost Calculation.Pdf
Od 12 PERLITE DEVELOPERS ESTIMATION.Pdf
Od 13 STP Concept Civil Drawing.Pdf
Od 14 Legal Opinion 82 3.Pdf
Od 15 Legal Opinion 82 6.Pdf
Od 16 Legal Opinion 82 11.Pdf
Od 17 Legal Opinion 82 14.Pdf
Od 18 Legal Opinion 82 15.Pdf
Od 19 AKARBAND And SURVEY SKETCH.Pdf
Od 20 82-11 SALE DEED MANJUNATH.Pdf
Od 21 Legal Opinion 82 11.Pdf
Od 22 GPA 82 3.Pdf
Od 23 GPA 82 6.Pdf
Od 24 GPA 82 7 15.Pdf
Od 25 GPA 82 10 11.Pdf
Od 26 GPA 82 13 14.Pdf
Ed 1 27-04-2026
Ed 2 27-04-2026
Ed 3 27-04-2026
Ed 4 27-04-2026
Ed 5 27-04-2026
Ed 6 27-04-2026
Ed 7 27-04-2026
Ed 8 27-04-2026
Ed 9 27-04-2026
Ed 10 27-04-2026
Ed 11 27-04-2026
Ed 12 27-04-2026
Ed 13 27-04-2026
Ed 14 27-04-2026
Ed 15 27-04-2026
Ed 16 27-04-2026
Ed 17 27-04-2026
Ed 18 27-04-2026
Ed 19 27-04-2026
Ed 20 27-04-2026
Ed 21 27-04-2026
Ed 22 27-04-2026
Ed 23 27-04-2026
Ed 24 27-04-2026
Ed 25 27-04-2026
Ed 26 27-04-2026
Ed 27 27-04-2026
Ed 28 27-04-2026
Ed 29 27-04-2026
Ed 30 27-04-2026
Ed 31 27-04-2026
Ed 32 27-04-2026
Ed 33 27-04-2026
Ed 34 12-05-2026
Ed 35 12-05-2026
Ed 36 12-05-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Karnataka Bank Ltd.
Account Number (RERA) 0910202600000501
IFSC KARB0000910
Branch Address Bellandur
Country/City