Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential New Launch Source: rera.ka

Raja Platino RERA Details - PRM/KA/RERA/1251/310/PR/291125/008288 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Raja Platino under registration PRM/KA/RERA/1251/310/PR/291125/008288 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/291125/008288
  • Project Name RAJA PLATINO
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 30 September 2028
  • Documents 87 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 October 2024 Expected commencement of civil works and foundation on site.
Original Completion 30 September 2028 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

RAJA HOUSING LIMITED
Registered Address Prestige Blue Chip Software Park, Block -2, Mezzanine Floor, Opp. Christ College, Next to Bangalore Dairy, Hosur Road, Bangalore ,Bengaluru South ,Bengaluru Urban-560029
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address BBMP Katha No. 41/3651/41/10/41/8/41/9, SY NO 41/8, 41/9 & 41/10 , KAMMANAHALLI VILLAGE, BEGUR HOBLI, BBMP WARD NO.192, Near Gottigere NICE Junction Off. Bannerghatta Road , Bengaluru South , Bengaluru Urban, Karnataka - 560083

RERA Coordinates

Latitude, Longitude 12.855871377608604, 77.6021198991346
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Addl.Dir/JD SOUTH/0053/21-22
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 06 September 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Raja Platino 1 5 0 105 Residential 14.95 4 120

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 4
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
  • Raja Platino
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 2 BHK 72.14 1
-1 2 BHK 74.43 2
-1 2 BHK 74.46 3
-1 3 BHK 92.96 4
-1 3 BHK 91.3 5
-1 3 BHK 92.19 6
-1 3 BHK 92.96 7
-1 3 BHK 93.03 8
-1 2 BHK 76.34 9
-1 1 BHK 31.56 10
-1 2 BHK 76.72 11
-1 3 BHK 94.22 12
-1 3 BHK 92.97 13
-1 3 BHK 93.01 14
-1 3 BHK 95.12 15
-1 2 BHK 76.08 16
-1 3 BHK 93.19 17
-1 2 BHK 78.64 18
-1 3 BHK 99.65 19
-1 2 BHK 64.63 20
-1 3 BHK 90.38 21
-1 2 BHK 74 22
-1 2 BHK 72.14 23
GF 2 BHK 79.3 101
GF 2 BHK 81.07 102
GF 2 BHK 81.1 103
GF 3 BHK 99.81 104
GF 3 BHK 96.04 105
GF 3 BHK 92.19 106
GF 3 BHK 93.03 107
GF 3 BHK 97.44 108
GF 2 BHK 78.5 109
GF 1 BHK 31.56 110
GF 2 BHK 76.72 111
GF 3 BHK 94.22 112
GF 3 BHK 92.97 113
GF 3 BHK 93.01 114
GF 3 BHK 95.12 115
GF 2 BHK 76.08 116
GF 3 BHK 93.19 117
GF 2 BHK 78.64 118
GF 3 BHK 99.65 119
GF 2 BHK 64.63 120
GF 3 BHK 90.38 121
GF 2 BHK 74 122
GF 2 BHK 78.51 123
GF 2 BHK 79.31 124
1 2 BHK 79.29 201
1 2 BHK 81.07 202
1 2 BHK 81.1 203
1 3 BHK 99.81 204
1 3 BHK 96.04 205
1 3 BHK 92.19 206
1 3 BHK 93.03 207
1 3 BHK 97.44 208
1 2 BHK 78.5 209
1 1 BHK 31.56 210
1 2 BHK 76.72 211
1 3 BHK 94.22 212
1 3 BHK 92.97 213
1 3 BHK 93.01 214
1 3 BHK 95.12 215
1 2 BHK 76.08 216
1 3 BHK 93.19 217
1 2 BHK 78.64 218
1 3 BHK 99.65 219
1 2 BHK 64.63 220
1 3 BHK 90.38 221
1 2 BHK 74 222
1 2 BHK 78.48 223
1 2 BHK 79.31 224
2 2 BHK 79.29 301
2 2 BHK 81.07 302
2 2 BHK 81.1 303
2 3 BHK 99.81 304
2 3 BHK 96.04 305
2 3 BHK 92.19 306
2 3 BHK 93.03 307
2 3 BHK 97.44 308
2 2 BHK 78.5 309
2 1 BHK 31.56 310
2 2 BHK 76.72 311
2 3 BHK 94.22 312
2 3 BHK 92.97 313
2 3 BHK 93.01 314
2 3 BHK 95.12 315
2 2 BHK 76.08 316
2 3 BHK 93.19 317
2 2 BHK 78.64 318
2 3 BHK 96.27 319
2 2 BHK 64.63 320
2 3 BHK 90.38 321
2 2 BHK 74 322
2 2 BHK 78.48 323
2 2 BHK 79.31 324
2 4BHK -DUPLEX 193.98 325
3 2 BHK 79.29 401
3 2 BHK 81.07 402
3 2 BHK 81.1 403
3 3 BHK 99.81 404
3 3 BHK 96.04 405
3 3 BHK 92.19 406
3 3 BHK 93.03 407
3 3 BHK 97.44 408
3 2 BHK 78.5 409
3 1 BHK 31.56 410
3 2 BHK 76.72 411
3 3 BHK 94.22 412
3 3 BHK 92.97 413
3 3 BHK 93.01 414
3 3 BHK 95.12 415
3 2 BHK 76.08 416
3 3 BHK 93.19 417
3 2 BHK 78.64 418
3 3 BHK 96.27 419
3 2 BHK 64.63 420
3 3 BHK 90.38 421
3 2 BHK 74 422
3 2 BHK 78.48 423
3 2 BHK 79.31 424
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
1 Completion Certificate
2 Completion Certificate
3 Completion Certificate
4 Completion Certificate
Fd 1 RHL BALANCE SHEET 2024.Pdf
Fd 2 RHL BALANCE SHEET 2023.Pdf
Fd 3 RHL BALANCE SHEET 2022.Pdf
Fd 4 RHL BALANCE SHEET 2024.Pdf
Fd 5 RHL BALANCE SHEET 2023.Pdf
Fd 6 RHL BALANCE SHEET 2022.Pdf
Fd 7 RHL BALANCE SHEET 2024.Pdf
Fd 8 RHL BALANCE SHEET 2023.Pdf
Fd 9 RHL BALANCE SHEET 2022.Pdf
Fd 10 RHL BALANCE SHEET 2024.Pdf
Fd 11 RHL BALANCE SHEET 2023.Pdf
Fd 12 RHL BALANCE SHEET 2022.Pdf
Fd 13 RHL BALANCE SHEET 2024.Pdf
Fd 14 RHL BALANCE SHEET 2023.Pdf
Fd 15 RHL BALANCE SHEET 2022.Pdf
Fd 16 RHL BALANCE SHEET 2024.Pdf
Fd 17 RHL BALANCE SHEET 2023.Pdf
Fd 18 RHL BALANCE SHEET 2022.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Noc 8 Lift Authorities( Annexure - 102 )
Noc 9 BMRCL( Annexure - 103 )
Noc 10 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 11 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 12 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 13 Coastal Regulation Zone Authority( Annexure - 107 )
Photo 1 Project Photo
Od 1 BWSSB NOC RECEIPT.Pdf
Od 2 Amenities.Pdf
Od 3 Carpet Area Calculations.Pdf
Od 4 CDP.Pdf
Od 5 Declaration Of Commencement Certificate.Pdf
Od 6 Declaration Of Water Sources.Pdf
Od 7 PCB Sanction Dwg.Pdf
Od 8 GPA.Pdf
Od 9 JDA.Pdf
Od 10 Village Map.Pdf
Ed 1 12-09-2025
Ed 2 12-09-2025
Ed 3 12-09-2025
Ed 6 12-09-2025
Ed 7 12-09-2025
Ed 8 12-09-2025
Ed 9 12-09-2025
Ed 10 12-09-2025
Ed 12 12-09-2025
Ed 13 12-09-2025
Ed 14 17-09-2025
Ed 15 26-11-2025
Ed 16 26-11-2025
Ed 17 26-11-2025
Ed 18 26-11-2025
Ed 19 26-11-2025
Ed 20 26-11-2025
Ed 21 26-11-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI Bank
Account Number (RERA) 000205039130
IFSC ICIC0003436
Branch Address WILSON GARDEN
Country/City