Sanjeevini Heliconia RERA Details - PRM/KA/RERA/1250/304/PR/180726/008826 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sanjeevini Heliconia under registration PRM/KA/RERA/1250/304/PR/180726/008826 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1250/304/PR/180726/008826
  • Project Name SANJEEVINI HELICONIA
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Rural
  • Taluka Hosakote
  • Original Completion 31 December 2029
  • Documents 84 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 July 2026 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2029 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Sanjeevini Projects
Registered Address Building No. 182, First Floor,,Ramagondanahalli Village, Opp to Gove School, Whitefield ,Bengaluru East ,Bengaluru Urban-560066
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy No. 183, Soukya Main Road, , Near Soukya Health Centre, Nadavathi, , Hosakote , Bengaluru Rural, Karnataka - 560067

RERA Coordinates

Latitude, Longitude 12.994634, 77.800968
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. STRRPA/TP/CC/686/2025-26
Authority Satellite Town Ring Road Planning Authority
Approved Date 09 June 2026

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
A Block 1 16 0 100 Residential 44.95 14 95
B Block 1 16 0 159 Residential 44.95 14 126

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
5 BHK 0 units
  • A Block
  • B Block
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 2 BHK 71.52 101
GF 3 BHK 97.52 102
GF 3 BHK 97.52 103
GF 2 BHK 71.52 104
1 2.5 BHK 85.13 201
1 2 BHK 71.52 202
1 2 BHK 71.52 203
1 3 BHK 97.52 204
1 3 BHK 97.52 205
1 2 BHK 71.52 206
1 2.5 BHK 85.13 207
2 2.5 BHK 85.13 301
2 2 BHK 71.52 302
2 2 BHK 71.52 303
2 3 BHK 97.52 304
2 3 BHK 97.52 305
2 2 BHK 71.52 306
2 2.5 BHK 85.13 307
3 2.5 BHK 85.13 401
3 2 BHK 71.52 402
3 2 BHK 71.52 403
3 3 BHK 97.52 404
3 3 BHK 97.52 405
3 2 BHK 71.52 406
3 2.5 BHK 85.13 407
4 2.5 BHK 85.13 501
4 2 BHK 71.52 502
4 2 BHK 71.52 503
4 3 BHK 97.52 504
4 3 BHK 97.52 505
4 2 BHK 71.52 506
4 2.5 BHK 85.13 507
5 2.5 BHK 85.13 601
5 2 BHK 71.52 602
5 2 BHK 71.52 603
5 3 BHK 97.52 604
5 3 BHK 97.52 605
5 2 BHK 71.52 606
5 2.5 BHK 85.13 607
6 2.5 BHK 85.13 701
6 2 BHK 71.52 702
6 2 BHK 71.52 703
6 3 BHK 97.52 704
6 3 BHK 97.52 705
6 2 BHK 71.52 706
6 2.5 BHK 85.13 707
7 2.5 BHK 85.13 801
7 2 BHK 71.52 802
7 2 BHK 71.52 803
7 3 BHK 97.52 804
7 3 BHK 97.52 805
7 2 BHK 71.52 806
7 2.5 BHK 85.13 807
8 2.5 BHK 85.13 901
8 2 BHK 71.52 902
8 2 BHK 71.52 903
8 3 BHK 97.52 904
8 3 BHK 97.52 905
8 2 BHK 71.52 906
8 2.5 BHK 85.13 907
9 2.5 BHK 85.13 1001
9 2 BHK 71.52 1002
9 2 BHK 71.52 1003
9 3 BHK 97.52 1004
9 3 BHK 97.52 1005
9 2 BHK 71.52 1006
9 2.5 BHK 85.13 1007
10 2.5 BHK 85.13 1101
10 2 BHK 71.52 1102
10 2 BHK 71.52 1103
10 3 BHK 97.52 1104
10 3 BHK 97.52 1105
10 2 BHK 71.52 1106
10 2.5 BHK 85.13 1107
11 2.5 BHK 85.13 1201
11 2 BHK 71.52 1202
11 2 BHK 71.52 1203
11 3 BHK 97.52 1204
11 3 BHK 97.52 1205
11 2 BHK 71.52 1206
11 2.5 BHK 85.13 1207
12 2.5 BHK 85.13 1301
12 2 BHK 71.52 1302
12 2 BHK 71.52 1303
12 3 BHK 97.52 1304
12 3 BHK 97.52 1305
12 2 BHK 71.52 1306
12 2.5 BHK 85.13 1307
13 2.5 BHK 85.13 1401
13 2 BHK 71.52 1402
13 2 BHK 71.52 1403
13 3 BHK 97.52 1404
13 3 BHK 97.52 1405
13 2 BHK 71.52 1406
13 2.5 BHK 85.13 1407
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
2 Completion Certificate
Fd 1 Balance Sheet 2024-25 Compressed (4).Pdf
Fd 2 SP IT Return 2023-24 UDIN Signed Compressed.Pdf
Fd 3 Financials 22-23 UDIN.Pdf
Fd 4 Profit And Loss 2024-25.Pdf
Fd 5 SP IT Return 2023-24 UDIN Signed Compressed.Pdf
Fd 6 Financials 22-23 UDIN.Pdf
Fd 7 ITR Of FY - 2024-25.Pdf
Fd 8 SP IT Return 2023-24 UDIN Signed Compressed.Pdf
Fd 9 ITR Of FY - 2022-23.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Od 1 1 Compressed.Pdf
Od 2 2 Compressed.Pdf
Od 3 3 Compressed.Pdf
Od 4 4 Compressed.Pdf
Od 5 5 Compressed.Pdf
Od 6 Absolute Saledeed 3238-2012-13 Compressed.Pdf
Od 7 Change Of Land Use.Pdf
Od 8 Confirmation Deed Compressed.Pdf
Od 9 Family Tree & Death Certificate Compressed.Pdf
Od 10 General Power Of Attorney.Pdf
Od 11 Joint Development Agreement Compressed.Pdf
Od 12 Old Saledeed.Pdf
Od 13 Podi Document 206-2009-10.Pdf
Od 14 Village Map Naduvathi Final.Pdf
Od 15 Z R Copy.Pdf
Od 16 STRR Approval.Pdf
Od 17 Survey Sketch.Pdf
Od 18 Final Rera Brochure Compressed.Pdf
Od 19 Single Plot Layout.Pdf
Od 20 STRR Single Plot Work Order.Pdf
Od 21 STP Map With Engineer Signature.Pdf
Od 22 Conversion Order.Pdf
Od 23 BW1.Jpeg
Od 24 BW2.Jpeg
Od 25 BW3.Jpeg
Od 26 BW4.Jpeg
Od 27 BW5.Jpeg
Od 28 Sanjeevini Sanctuary Form -7.Pdf
Od 29 Form 4 100%.Pdf
Ed 1 13-07-2026
Ed 2 13-07-2026
Ed 3 13-07-2026
Ed 4 13-07-2026
Ed 5 13-07-2026
Ed 6 13-07-2026
Ed 7 13-07-2026
Ed 8 13-07-2026
Ed 9 13-07-2026
Ed 10 13-07-2026
Ed 11 13-07-2026
Ed 12 13-07-2026
Ed 13 13-07-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank AU Small Finance Bank
Account Number (RERA) 2602261913207466
IFSC AUBL0002619
Branch Address Marathahalli
Country/City