Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Abhee Celestial City RERA Details - PRM/KA/RERA/1251/308/PR/071123/006380 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Abhee Celestial City under registration PRM/KA/RERA/1251/308/PR/071123/006380 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/071123/006380
  • Project Name ABHEE CELESTIAL CITY
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 30 June 2029
  • Documents 79 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 18 October 2023 Expected commencement of civil works and foundation on site.
Original Completion 30 June 2029 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

NEXPLACE INFRASTRUCTURE
Registered Address Regisgered Office No. 393, 15th cross,5th Main, Sector -6, HSR Layout ,Bengaluru South ,Bengaluru Urban-560102
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address SY NO.24/2, 24/6, 24/8, 24/11, CHIKKAVADERAPURA VILLAGE, SARJAPURA HOBLI , ANEKAL TALUK, BANGALORE , Anekal , Bengaluru Urban, Karnataka - 560087

RERA Coordinates

Latitude, Longitude 12.898694822499328, 77.74925052444307
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BDA/PA/ME/AA-1/TA-4/E/31/2023-24
Authority BDA - Bangalore Development Authority
Approved Date 10 October 2023

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
ABHEE CELESTIAL CITY 2 27 0 470 Residential 81.3 26 399

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 4
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
5 BHK 0 units
NA 0 units
  • ABHEE CELESTIAL CITY
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 108 AG01
-1 2.5 BHK 93 AG02
-1 3 BHK 107 ABG03
-1 NA 0 AG04
-1 2.5 BHK 94 BG05
-1 2 BHK 75 BG06
-1 2.5 BHK 93 BG07
-1 3 BHK 107 CG08
-1 3 BHK 108 CG12
-1 2.5 BHK 93 CG11
-1 2 BHK 75 CG10
-1 2.5 BHK 94 CG9
GF 3 BHK 108 A101
GF 2.5 BHK 93 A102
GF 3 BHK 107 AB103
GF NA 0 A104
GF 2.5 BHK 94 B108
GF 2 BHK 75 B109
GF 2.5 BHK 93 B110
GF 3 BHK 107 C111
GF 3 BHK 108 C112
GF 2.5 BHK 93 C113
GF 2 BHK 75 C114
GF 2.5 BHK 94 C115
1 3 BHK 111 A201
1 2.5 BHK 93 A202
1 3 BHK 107 A203
1 2.5 BHK 94 A204
1 2 BHK 75 A205
1 3 BHK 111 B206
1 3 BHK 107 B207
1 2.5 BHK 94 B208
1 2 BHK 75 B209
1 2.5 BHK 93 B210
1 3 BHK 107 C211
1 3 BHK 111 C212
1 2.5 BHK 93 C213
1 2 BHK 75 C214
1 2.5 BHK 94 C215
2 3 BHK 111 A301
2 2.5 BHK 93 A302
2 3 BHK 107 A303
2 2.5 BHK 94 A304
2 2 BHK 75 A305
2 3 BHK 111 B306
2 3 BHK 107 B307
2 2.5 BHK 94 B308
2 2 BHK 75 B309
2 2.5 BHK 93 B310
2 3 BHK 107 C311
2 3 BHK 111 C312
2 2.5 BHK 93 C313
2 2 BHK 75 C314
2 2.5 BHK 94 C315
3 3 BHK 111 A401
3 2.5 BHK 93 A402
3 3 BHK 107 A403
3 2.5 BHK 94 A404
3 2 BHK 75 A405
3 3 BHK 111 B406
3 3 BHK 107 B407
3 2.5 BHK 94 B408
3 2 BHK 75 B409
3 2.5 BHK 93 B410
3 3 BHK 107 C411
3 3 BHK 111 C412
3 2.5 BHK 93 C413
3 2 BHK 75 C414
3 2.5 BHK 94 C415
4 3 BHK 111 A501
4 2.5 BHK 93 A502
4 3 BHK 107 A503
4 2.5 BHK 94 A504
4 2 BHK 75 A505
4 3 BHK 111 B506
4 3 BHK 107 B507
4 2.5 BHK 94 B508
4 2 BHK 75 B509
4 2.5 BHK 93 B510
4 3 BHK 107 C511
4 3 BHK 111 C512
4 2.5 BHK 93 C513
4 2 BHK 75 C514
4 2.5 BHK 94 C515
5 3 BHK 111 A601
5 2.5 BHK 93 A602
5 3 BHK 107 A603
5 2.5 BHK 94 A604
5 2 BHK 75 A605
5 3 BHK 111 B606
5 3 BHK 107 B607
5 2.5 BHK 94 B608
5 2 BHK 75 B609
5 2.5 BHK 93 B610
5 3 BHK 107 C611
5 3 BHK 111 C612
5 2.5 BHK 93 C613
5 2 BHK 75 C614
5 2.5 BHK 94 C615
6 3 BHK 111 A701
6 2.5 BHK 93 A702
6 3 BHK 107 A703
6 2.5 BHK 94 A704
6 2 BHK 75 A705
6 3 BHK 111 B706
6 3 BHK 107 B707
6 2.5 BHK 94 B708
6 2 BHK 75 B709
6 2.5 BHK 93 B710
6 3 BHK 107 C711
6 3 BHK 111 C712
6 2.5 BHK 93 C713
6 2 BHK 75 C714
6 2.5 BHK 94 C715
7 3 BHK 111 A801
7 2.5 BHK 93 A802
7 3 BHK 107 A803
7 2.5 BHK 94 A804
7 2 BHK 75 A805
7 3 BHK 111 B806
7 3 BHK 107 B807
7 2.5 BHK 94 B808
7 2 BHK 75 B809
7 2.5 BHK 93 B810
7 3 BHK 107 C811
7 3 BHK 111 C812
7 2.5 BHK 93 C813
7 2 BHK 75 C814
7 2.5 BHK 94 C815
8 3 BHK 111 A901
8 2.5 BHK 93 A902
8 3 BHK 107 A903
8 2.5 BHK 94 A904
8 2 BHK 75 A905
8 3 BHK 111 B906
8 3 BHK 107 B907
8 2.5 BHK 94 B908
8 2 BHK 75 B909
8 2.5 BHK 93 B910
8 3 BHK 107 C911
8 3 BHK 111 C912
8 2.5 BHK 93 C913
8 2 BHK 75 C914
8 2.5 BHK 94 C915
9 3 BHK 111 A1001
9 2.5 BHK 93 A1002
9 3 BHK 107 A1003
9 2.5 BHK 94 A1004
9 2 BHK 75 A1005
9 3 BHK 111 B1006
9 3 BHK 107 B1007
9 2.5 BHK 94 B1008
9 2 BHK 75 B1009
9 2.5 BHK 93 B1010
9 3 BHK 107 C1011
9 3 BHK 111 C1012
9 2.5 BHK 93 C1013
9 2 BHK 75 C1014
9 2.5 BHK 94 C1015
10 3 BHK 111 A1101
10 2.5 BHK 93 A1102
10 3 BHK 107 A1103
10 2.5 BHK 94 A1104
10 2 BHK 75 A1105
10 3 BHK 111 B1106
10 3 BHK 107 B1107
10 2.5 BHK 94 B1108
10 2 BHK 75 B1109
10 2.5 BHK 93 B1110
10 3 BHK 107 C1111
10 3 BHK 111 C1112
10 2.5 BHK 93 C1113
10 2 BHK 75 C1114
10 2.5 BHK 94 C1115
11 3 BHK 111 A1201
11 2.5 BHK 93 A1202
11 3 BHK 107 A1203
11 2.5 BHK 94 A1204
11 2 BHK 75 A1205
11 3 BHK 111 B1206
11 3 BHK 107 B1207
11 2.5 BHK 94 B1208
11 2 BHK 75 B1209
11 2.5 BHK 93 B1210
11 3 BHK 107 C1211
11 3 BHK 111 C1212
11 2.5 BHK 93 C1213
11 2 BHK 75 C1214
11 2.5 BHK 94 C1215
12 3 BHK 111 A1301
12 2.5 BHK 93 A1302
12 3 BHK 107 A1303
12 2.5 BHK 94 A1304
12 2 BHK 75 A1305
12 3 BHK 111 B1306
12 3 BHK 107 B1307
12 2.5 BHK 94 B1308
12 2 BHK 75 B1309
12 2.5 BHK 93 B1310
12 3 BHK 107 C1311
12 3 BHK 111 C1312
12 2.5 BHK 93 C1313
12 2 BHK 75 C1314
12 2.5 BHK 94 C1315
13 3 BHK 111 A1401
13 2.5 BHK 93 A1402
13 3 BHK 107 A1403
13 2.5 BHK 94 A1404
13 2 BHK 75 A1405
13 3 BHK 111 B1406
13 3 BHK 107 B1407
13 2.5 BHK 94 B1408
13 2 BHK 75 B1409
13 2.5 BHK 93 B1410
13 3 BHK 107 C1411
13 3 BHK 111 C1412
13 2.5 BHK 93 C1413
13 2 BHK 75 C1414
13 2.5 BHK 94 C1415
14 3 BHK 111 A1501
14 2.5 BHK 93 A1502
14 3 BHK 107 A1503
14 2.5 BHK 94 A1504
14 2 BHK 75 A1505
14 3 BHK 111 B1506
14 3 BHK 107 B1507
14 2.5 BHK 94 B1508
14 2 BHK 75 B1509
14 2.5 BHK 93 B1510
14 3 BHK 107 C1511
14 3 BHK 111 C1512
14 2.5 BHK 93 C1513
14 2 BHK 75 C1514
14 2.5 BHK 94 C1515
15 3 BHK 111 A1601
15 2.5 BHK 93 A1602
15 3 BHK 107 A1603
15 2.5 BHK 94 A1604
15 2 BHK 75 A1605
15 3 BHK 111 B1606
15 3 BHK 107 B1607
15 2.5 BHK 94 B1608
15 2 BHK 75 B1609
15 2.5 BHK 93 B1610
15 3 BHK 107 C1611
15 3 BHK 111 C1612
15 2.5 BHK 93 C1613
15 2 BHK 75 C1614
15 2.5 BHK 94 C1615
16 3 BHK 111 A1701
16 2.5 BHK 93 A1702
16 3 BHK 107 A1703
16 2.5 BHK 94 A1704
16 2 BHK 75 A1705
16 3 BHK 111 B1706
16 3 BHK 107 B1707
16 2.5 BHK 94 B1708
16 2 BHK 75 B1709
16 2.5 BHK 93 B1710
16 3 BHK 107 C1711
16 3 BHK 111 C1712
16 2.5 BHK 93 C1713
16 2 BHK 75 C1714
16 2.5 BHK 94 C1715
17 3 BHK 111 A1801
17 2.5 BHK 93 A1802
17 3 BHK 107 A1803
17 2.5 BHK 94 A1804
17 2 BHK 75 A1805
17 3 BHK 111 B1806
17 3 BHK 107 B1807
17 2.5 BHK 94 B1808
17 2 BHK 75 B1809
17 2.5 BHK 93 B1810
17 3 BHK 107 C1811
17 3 BHK 111 C1812
17 2.5 BHK 93 C1813
17 2 BHK 75 C1814
17 2.5 BHK 94 C1815
18 3 BHK 111 A1901
18 2.5 BHK 93 A1902
18 3 BHK 107 A1903
18 2.5 BHK 94 A1904
18 2 BHK 75 A1905
18 3 BHK 111 B1906
18 3 BHK 107 B1907
18 2.5 BHK 94 B1908
18 2 BHK 75 B1909
18 2.5 BHK 93 B1910
18 3 BHK 107 C1911
18 3 BHK 111 C1912
18 2.5 BHK 93 C1913
18 2 BHK 75 C1914
18 2.5 BHK 94 C1915
19 3 BHK 111 A2001
19 2.5 BHK 93 A2002
19 3 BHK 107 A2003
19 2.5 BHK 94 A2004
19 2 BHK 75 A2005
19 3 BHK 111 B2006
19 3 BHK 107 B2007
19 2.5 BHK 94 B2008
19 2 BHK 75 B2009
19 2.5 BHK 93 B2010
19 3 BHK 107 C2011
19 3 BHK 111 C2012
19 2.5 BHK 93 C2013
19 2 BHK 75 C2014
19 2.5 BHK 94 C2015
20 3 BHK 111 A2201
20 2.5 BHK 93 A2202
20 3 BHK 107 A2203
20 2.5 BHK 94 A2204
20 2 BHK 75 A2205
20 3 BHK 111 B2206
20 3 BHK 107 B2207
20 2.5 BHK 94 B2208
20 2 BHK 75 B2209
20 2.5 BHK 93 B2210
20 3 BHK 107 C2211
20 3 BHK 111 C2212
20 2.5 BHK 93 C2213
20 2 BHK 75 C2214
20 2.5 BHK 94 C2215
21 3 BHK 111 A2201
21 2.5 BHK 93 A2202
21 3 BHK 107 A2203
21 2.5 BHK 94 A2204
21 2 BHK 75 A2205
21 3 BHK 111 B2206
21 3 BHK 107 B2207
21 2.5 BHK 94 B2208
21 2 BHK 75 B2209
21 2.5 BHK 93 B2210
21 3 BHK 107 C2211
21 3 BHK 111 C2212
21 2.5 BHK 93 C2213
21 2 BHK 75 C2214
21 2.5 BHK 94 C2215
22 3 BHK 111 A2301
22 2.5 BHK 93 A2302
22 3 BHK 107 A2303
22 2.5 BHK 94 A2304
22 2 BHK 75 A2305
22 3 BHK 111 B2306
22 3 BHK 107 B2307
22 2.5 BHK 94 B2308
22 2 BHK 75 B2309
22 2.5 BHK 93 B2310
22 3 BHK 107 C2311
22 3 BHK 111 C2312
22 2.5 BHK 93 C2313
22 2 BHK 75 C2314
22 2.5 BHK 94 C2315
23 3 BHK 111 A2401
23 2.5 BHK 93 A2402
23 3 BHK 107 A2403
23 2.5 BHK 94 A2404
23 2 BHK 75 A2405
23 3 BHK 111 B2406
23 3 BHK 107 B2407
23 2.5 BHK 94 B2408
23 2 BHK 75 B2409
23 2.5 BHK 93 B2410
23 3 BHK 107 C2411
23 3 BHK 111 C2412
23 2.5 BHK 93 C2413
23 2 BHK 75 C2414
23 2.5 BHK 94 C2415
24 3 BHK 111 A2501
24 2.5 BHK 93 A2502
24 3 BHK 107 A2503
24 2.5 BHK 94 A2504
24 2 BHK 75 A2505
24 3 BHK 111 B2506
24 3 BHK 107 B2507
24 2.5 BHK 94 B2508
24 2 BHK 75 B2509
24 2.5 BHK 93 B2510
24 3 BHK 107 C2511
24 3 BHK 111 C2512
24 2.5 BHK 93 C2513
24 2 BHK 75 C2514
24 2.5 BHK 94 C2515
25 3 BHK 111 A2601
25 2.5 BHK 93 A2602
25 3 BHK 107 A2603
25 2.5 BHK 94 A2604
25 2 BHK 75 A2605
25 3 BHK 111 B2606
25 3 BHK 107 B2607
25 2.5 BHK 94 B2608
25 2 BHK 75 B2609
25 2.5 BHK 93 B2610
25 3 BHK 107 C2611
25 3 BHK 111 C2612
25 2.5 BHK 93 C2613
25 2 BHK 75 C2614
25 2.5 BHK 94 C2615
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 BALANCESHEET.Pdf
Fd 2 Balance Sheet.Pdf
Fd 3 Balancesheet.Pdf
Fd 4 P L.Pdf
Fd 5 P L.Pdf
Fd 6 P L.Pdf
Fd 7 Not Applicable.Pdf
Fd 8 Not Applicable.Pdf
Fd 9 Not Applicable.Pdf
Fd 10 Not Applicable.Pdf
Fd 11 Not Applicable.Pdf
Fd 12 Not Applicable.Pdf
Fd 13 Not Applicable.Pdf
Fd 14 Not Applicable.Pdf
Fd 15 Not Applicable.Pdf
Fd 16 Ack.Pdf
Fd 17 ACK.Pdf
Fd 18 ACK.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Noc 10 Lift Authorities( Annexure - 102 )
Photo 1 Project Photo
Od 1 Not Applicable.Pdf
Ed 1 31-10-2023
Ed 2 31-10-2023
Ed 3 31-10-2023
Ed 4 31-10-2023
Ed 5 31-10-2023
Ed 6 31-10-2023
Ed 7 31-10-2023
Ed 8 31-10-2023
Ed 9 31-10-2023
Ed 10 31-10-2023
Ed 11 31-10-2023
Ed 12 31-10-2023
Ed 13 03-11-2023
Ed 14 03-11-2023
Ed 15 03-11-2023
Ed 16 03-11-2023
Ed 17 03-11-2023
Ed 18 03-11-2023
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank INDUSIND BANK
Account Number (RERA) 251213141980
IFSC INDB0000008
Branch Address MG Road, Bangalore
Country/City