residential Under Construction Source: rera.ka

Goyal Orchid Life RERA Details - PRM/KA/RERA/1251/446/PR/151223/006487 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Goyal Orchid Life under registration PRM/KA/RERA/1251/446/PR/151223/006487 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/151223/006487
  • Project Name ORCHID LIFE
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 28 February 2030
  • Documents 114 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 March 2024 Expected commencement of civil works and foundation on site.
Original Completion 28 February 2030 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

GOYAL HARIYANA ASSOCIATES
Registered Address NO.206, 2ND FLOOR, BARTON CENTRE,84, M.G.ROAD ,Bengaluru South ,Bengaluru Urban-560001
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address SY. NOs. 20,21,125/4,125/5,126/1,126/5,126/6 and 127/3 OF GUNJUR VILLAGE , VARTHUR HOBLI, WARD NO 149 , Bengaluru East , Bengaluru Urban, Karnataka - 560087

RERA Coordinates

Latitude, Longitude 12.92590041, 77.72701832
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Addl.Dir/JDNORTH/0033/23-24
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 07 November 2023

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
TOWER A 2 26 0 180 Residential 78.15 25 180
TOWER B 2 25 0 148 Residential 75.15 24 148
TOWER C 2 25 0 148 Residential 75.15 24 148
TOWER D 2 25 0 148 Residential 75.15 24 148
TOWER E 2 25 0 148 Residential 75.15 24 148

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • TOWER A
  • TOWER B
  • TOWER C
  • TOWER D
  • TOWER E
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK+2T 89.48 A002
-1 3 BHK 103.69 A003
-1 2 BHK 72.4 A004
-1 2 BHK COMPACT 50.53 A005
-1 3 BHK 110.17 A006
-1 3 BHK 110.17 A007
GF 3 BHK+2T 91.49 A101
GF 3 BHK+2T 89.48 A102
GF 3 BHK 103.69 A103
GF 2 BHK 72.4 A104
GF 2 BHK COMPACT 50.53 A105
GF 3 BHK 110.17 A106
GF 3 BHK 110.17 A107
1 3 BHK+2T 91.49 A201
1 3 BHK+2T 89.48 A202
1 3 BHK 103.69 A203
1 2 BHK 72.4 A204
1 2 BHK COMPACT 50.53 A205
1 3 BHK 110.17 A206
1 3 BHK 110.17 A207
2 3 BHK+2T 91.49 A301
2 3 BHK+2T 89.48 A302
2 3 BHK 103.69 A303
2 2 BHK 72.4 A304
2 2 BHK COMPACT 50.53 A305
2 3 BHK 110.17 A306
2 3 BHK 110.17 A307
3 3 BHK+2T 91.49 A401
3 3 BHK+2T 89.48 A402
3 3 BHK 103.69 A403
3 2 BHK 72.4 A404
3 2 BHK COMPACT 50.53 A405
3 3 BHK 110.17 A406
3 3 BHK 110.17 A407
4 3 BHK+2T 91.49 A501
4 3 BHK+2T 89.48 A502
4 3 BHK 103.69 A503
4 2 BHK 72.4 A504
4 2 BHK COMPACT 50.53 A505
4 3 BHK 110.17 A506
4 3 BHK 110.17 A507
5 3 BHK+2T 91.49 A601
5 3 BHK+2T 89.48 A602
5 3 BHK 103.69 A603
5 2 BHK 72.4 A604
5 2 BHK COMPACT 50.53 A605
5 3 BHK 110.17 A606
5 3 BHK 110.17 A607
6 3 BHK+2T 91.49 A701
6 3 BHK+2T 89.48 A702
6 3 BHK 103.69 A703
6 2 BHK 72.4 A704
6 2 BHK COMPACT 50.53 A705
6 3 BHK 110.17 A706
6 3 BHK 110.17 A707
7 3 BHK+2T 91.49 A801
7 3 BHK+2T 89.48 A802
7 3 BHK 103.69 A803
7 2 BHK 72.4 A804
7 2 BHK COMPACT 50.53 A805
7 3 BHK 110.17 A806
7 3 BHK 110.17 A807
8 3 BHK+2T 91.49 A901
8 3 BHK+2T 89.48 A902
8 3 BHK 103.69 A903
8 2 BHK 72.4 A904
8 2 BHK COMPACT 50.53 A905
8 3 BHK 110.17 A906
8 3 BHK 110.17 A907
9 3 BHK+2T 91.49 A1001
9 3 BHK+2T 89.48 A1002
9 3 BHK 103.69 A1003
9 2 BHK 72.4 A1004
9 2 BHK COMPACT 50.53 A1005
9 3 BHK 110.17 A1006
9 3 BHK 110.17 A1007
10 3 BHK+2T 91.49 A1101
10 3 BHK+2T 89.48 A1102
10 3 BHK 103.69 A1103
10 2 BHK 72.4 A1104
10 2 BHK COMPACT 50.53 A1105
10 3 BHK 110.17 A1106
10 3 BHK 110.17 A1107
11 3 BHK+2T 91.49 A1201
11 3 BHK+2T 89.48 A1202
11 3 BHK 103.69 A1203
11 2 BHK 72.4 A1204
11 2 BHK COMPACT 50.53 A1205
11 3 BHK 110.17 A1206
11 3 BHK 110.17 A1207
12 3 BHK+2T 91.49 A1301
12 3 BHK+2T 89.48 A1302
12 3 BHK 103.69 A1303
12 2 BHK 72.4 A1304
12 2 BHK COMPACT 50.53 A1305
12 3 BHK 110.17 A1306
12 3 BHK 110.17 A1307
13 3 BHK+2T 91.49 A1401
13 3 BHK+2T 89.48 A1402
13 3 BHK 103.69 A1403
13 2 BHK 72.4 A1404
13 2 BHK COMPACT 50.53 A1405
13 3 BHK 110.17 A1406
13 3 BHK 110.17 A1407
14 3 BHK+2T 91.49 A1501
14 3 BHK+2T 89.48 A1502
14 3 BHK 103.69 A1503
14 2 BHK 72.4 A1504
14 2 BHK COMPACT 50.53 A1505
14 3 BHK 110.17 A1506
14 3 BHK 110.17 A1507
15 3 BHK+2T 91.49 A1601
15 3 BHK+2T 89.48 A1602
15 3 BHK 103.69 A1603
15 2 BHK 72.4 A1604
15 2 BHK COMPACT 50.53 A1605
15 3 BHK 110.17 A1606
15 3 BHK 110.17 A1607
16 3 BHK+2T 91.49 A1701
16 3 BHK+2T 89.48 A1702
16 3 BHK 103.69 A1703
16 2 BHK 72.4 A1704
16 2 BHK COMPACT 50.53 A1705
16 3 BHK 110.17 A1706
16 3 BHK 110.17 A1707
17 3 BHK+2T 91.49 A1801
17 3 BHK+2T 89.48 A1802
17 3 BHK 103.69 A1803
17 2 BHK 72.4 A1804
17 2 BHK COMPACT 50.53 A1805
17 3 BHK 110.17 A1806
17 3 BHK 110.17 A1807
18 3 BHK+2T 89.48 A1902
18 3 BHK 103.69 A1903
18 2 BHK 72.4 A1904
18 2 BHK COMPACT 50.53 A1905
18 3 BHK 110.17 A1906
18 3 BHK 110.17 A1907
19 3 BHK+2T 91.49 A2001
19 3 BHK+2T 89.48 A2002
19 3 BHK 103.69 A2003
19 2 BHK 72.4 A2004
19 2 BHK COMPACT 50.53 A2005
19 3 BHK 110.17 A2006
19 3 BHK 110.17 A2007
20 3 BHK+2T 91.49 A2101
20 3 BHK+2T 89.48 A2102
20 3 BHK 103.69 A2103
20 2 BHK 72.4 A2104
20 2 BHK COMPACT 50.53 A2105
20 3 BHK 110.17 A2106
20 3 BHK 110.17 A2107
21 3 BHK+2T 91.49 A2201
21 3 BHK+2T 89.48 A2202
21 3 BHK 103.69 A2203
21 2 BHK 72.4 A2204
21 2 BHK COMPACT 50.53 A2205
21 3 BHK 110.17 A2206
21 3 BHK 110.17 A2207
22 3 BHK+2T 91.49 A2301
22 3 BHK+2T 89.48 A2302
22 3 BHK 103.69 A2303
22 2 BHK 72.4 A2304
22 2 BHK COMPACT 50.53 A2305
22 3 BHK 110.17 A2306
22 3 BHK 110.17 A2307
23 3 BHK+2T 91.49 A2401
23 3 BHK+2T 89.48 A2402
23 3 BHK 103.69 A2403
23 2 BHK 72.4 A2404
23 2 BHK COMPACT 50.53 A2405
23 3 BHK 110.17 A2406
23 3 BHK 110.17 A2407
24 3 BHK+2T 91.49 A2501
24 3 BHK+2T 89.48 A2502
24 3 BHK 103.69 A2503
24 2 BHK 72.4 A2504
24 2 BHK COMPACT 50.53 A2505
24 3 BHK 110.17 A2506
24 3 BHK 110.17 A2507
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Financials GHA 2022-23.Pdf
Fd 2 Balance Sheet And P&L 2021-22.Pdf
Fd 3 Not Available.Pdf
Fd 4 Financials GHA 2022-23.Pdf
Fd 5 Balance Sheet And P&L 2021-22.Pdf
Fd 6 Not Available.Pdf
Fd 7 Financials GHA 2022-23.Pdf
Fd 8 Not Available.Pdf
Fd 9 Not Available.Pdf
Fd 10 Financials GHA 2022-23.Pdf
Fd 11 Not Available.Pdf
Fd 12 Not Available.Pdf
Fd 13 Financials GHA 2022-23.Pdf
Fd 14 Not Available.Pdf
Fd 15 Not Available.Pdf
Fd 16 ITR 2022-23.Pdf
Fd 17 ITR 2021-22.Pdf
Fd 18 Not Available.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 ORCHID LIFE STP Plan.Pdf
Od 2 Location And Demarcation.Png
Od 3 STP Demarcation.Pdf
Od 4 VILLAGE MAP DEMARCATION.Pdf
Od 5 DP Work Order.Pdf
Od 6 DP Plan.PDF
Od 7 BDA Sketch.Pdf
Od 8 Hindustan Aeronautics Limited NOC.PDF
Od 9 Clarification On Commencement Certificate.Pdf
Od 10 Orchid Life Construction Estimation Summary Breakup.Pdf
Od 11 SRO Guideline Notification.Pdf
Od 12 Clarification On Water Supply With Borewell Photos.Pdf
Od 13 Clarification On Change In Units In KSPCB And SEIAA NOC.Pdf
Od 14 Area Statement.Pdf
Od 15 CDP Master Extract.Pdf
Od 16 Revenue Sketch.Pdf
Od 17 126 TIPPANI.Pdf
Od 18 125 TIPPANI.Pdf
Od 19 127 TIPPANI.Pdf
Od 20 20 Tippani.Pdf
Od 21 21 Tippani.Pdf
Od 22 Sy No 126-1-5-6 Akarband.Pdf
Od 23 Sy No 125-4-5 Akarband.Pdf
Od 24 Sy No 127-3 Akarband.Pdf
Od 25 Sy No 125 Akarband.Pdf
Od 26 Sy No 20 21 Akarband.Pdf
Od 27 1 Sale Deed Dt 22-4-1938 Doc No 3764-37-38 0001.Pdf
Od 28 2 Partition Deed By And Between Venkatagiriyamma & Children 0001.Pdf
Od 29 3 GPA By Rajakumari Favouring Hagadoorappa 0001.Pdf
Od 30 3 GPA By Rajakumari Favouring Hagadoorappa 0001.Pdf
Od 31 5 Sale Deed By Hagadoorappa Favouring Leelavathi Doc 4669-05-06 0001.Pdf
Od 32 6 Sale Deed By Devakumar Favouring Leelavathi 4668-05-06 0001.Pdf
Od 33 7 Sale Deed Dated 25-11-1961 Doc No 4639-61-62 Executed By Chinnappa Favouring Siddalingappa 0001.Pdf
Od 34 8 Sale Deed Dt 11-8-1969 Doc No 2284-69-70 Executed By Siddalingappa Favouring Yellamma 0001.Pdf
Od 35 9 Sale Deed Doc No 4054 Dt 26-11-1979 By Yellamma Favouring Lakshmamma 0001.Pdf
Od 36 10 Sale Deed Doc 3572 Dt 3-2-84 By Lakshmamma Favouring Yellamma 0001.Pdf
Od 37 11 Partition Deed By And Between Yellamma & Children 0001.Pdf
Od 38 12 Sale Deed 14229-05-06 Favouring B S Leelavathi 0001.Pdf
Od 39 13 Confirmation Deed 5096-07-08.Pdf
Od 40 14 Sale Deed 1269-67-68 By Maramma Favouring Nanjundappa 0001 (1).Pdf
Od 41 15 Sale Deed 6195-72-73 By Nanjundappa Favouring Muniyappa 0001.Pdf
Od 42 16 Sale Deed 704-75-76 By Muniyappa Favouring Kaverappa 0001.Pdf
Od 43 17 Sale Deed By Muniyappa Favouring Leelavathi 4604-05-06 0001.Pdf
Od 44 18 JDA 5834-08-09- MANTRI DEVELOPERS 0001.Pdf
Od 45 19 POA 275-08-09 - MANTRI DEVELOPERS 0001.Pdf
Od 46 20 Gift Deed Leelavathi Favouring BSN HARI Doc 6710-10-11 0001.Pdf
Od 47 21 Amendment Agreement To JDA 668-12-13 - Mantri 0001.Pdf
Od 48 22 Amendment Agreement 9051-13-14 0001.Pdf
Od 49 23 Amandment Agreeement Gunjur.Pdf
Ed 1 14-12-2023
Ed 2 14-12-2023
Ed 3 14-12-2023
Ed 4 14-12-2023
Ed 5 14-12-2023
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI Bank
Account Number (RERA) 777705251100
IFSC ICIC0000002
Branch Address Commissariat Road Bengaluru
Country/City