residential Under Construction Source: rera.ka

GRC Sapphire Spring RERA Details - PRM/KA/RERA/1251/310/PR/030225/007478 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for GRC Sapphire Spring under registration PRM/KA/RERA/1251/310/PR/030225/007478 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/030225/007478
  • Project Name GRC SAPPHIRE SPRING - PHASE -1
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 31 December 2030
  • Documents 105 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 06 December 2024 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2030 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

GRC Infra Pvt. Ltd.
Registered Address No.161/A,7th Cross, Teachers Colony,1st stage, Kumaraswamy Layout ,Bengaluru South ,Bengaluru Urban-560078
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy.No.63/4, 63/5, 63/6, 63/7, 63/8, 63/9, 63/10, 63/11, 63/12 & 63/13 Situated at Gottigere village , Uttarahalli Hobli , Bengaluru South , Bengaluru Urban, Karnataka - 560083

RERA Coordinates

Latitude, Longitude 12.853604, 77.59299
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Addl.Dir/JDSouth/PRJ 3029/23-24
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 25 October 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower-A 2 14 0 60 Residential 42.25 13 56
Tower-B 2 15 1 93 Residential 44.95 14 84
Tower-C 2 15 1 93 Residential 44.95 14 84
Tower-D 2 15 1 93 Residential 44.95 14 84

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 8
Inventory Type RESIDENTIAL
Configuration Distribution
2.5B-2T 0 units
2.5B – 2T 0 units
2B – 2T 0 units
2.5B - 2T 0 units
3B-2T 0 units
3B – 3T 0 units
3B – 2T 0 units
3B - 2T 0 units
  • Tower-A
  • Tower-B
  • Tower-C
  • Tower-D
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3B-2T 93.83 A001
-1 2.5B-2T 89.19 A002
-1 2.5B-2T 90.77 A003
-1 3B-2T 91.14 A004
GF 3B-2T 93.83 A101
GF 2.5B-2T 89.19 A102
GF 2.5B-2T 90.77 A103
GF 3B-2T 91.14 A104
1 3B-2T 93.83 A201
1 2.5B-2T 89.19 A202
1 2.5B-2T 90.77 A203
1 3B-2T 91.14 A204
2 3B-2T 93.83 A301
2 2.5B-2T 89.19 A302
2 2.5B-2T 90.77 A303
2 3B-2T 91.14 A304
3 3B-2T 93.83 A401
3 2.5B-2T 89.19 A402
3 2.5B-2T 90.77 A403
3 3B-2T 91.14 A404
4 3B-2T 93.83 A501
4 2.5B-2T 89.19 A502
4 2.5B-2T 90.77 A503
4 3B-2T 91.14 A504
5 3B-2T 93.83 A601
5 2.5B-2T 89.19 A602
5 2.5B-2T 90.77 A603
5 3B-2T 91.14 A604
6 3B-2T 93.83 A701
6 2.5B-2T 89.19 A702
6 2.5B-2T 90.77 A703
6 3B-2T 91.14 A704
7 3B-2T 93.83 A801
7 2.5B-2T 89.19 A802
7 2.5B-2T 90.77 A803
7 3B-2T 91.14 A804
8 3B-2T 93.83 A901
8 2.5B-2T 89.19 A902
8 2.5B-2T 90.77 A903
8 3B-2T 91.14 A904
9 3B-2T 93.83 A1001
9 2.5B-2T 89.19 A1002
9 2.5B-2T 90.77 A1003
9 3B-2T 91.14 A1004
10 3B-2T 93.83 A1101
10 2.5B-2T 89.19 A1102
10 2.5B-2T 90.77 A1103
10 3B-2T 91.14 A1104
11 3B-2T 93.83 A1201
11 2.5B-2T 89.19 A1202
11 2.5B-2T 90.77 A1203
11 3B-2T 91.14 A1204
12 3B-2T 93.83 A1301
12 2.5B-2T 89.19 A1302
12 2.5B-2T 90.77 A1303
12 3B-2T 91.14 A1304
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
1 Completion Certificate
2 Completion Certificate
Fd 1 GRC Infra Pvt Ltd FY 2023-24.Pdf
Fd 2 GRC Infra Pvt Ltd FY 2022-23.Pdf
Fd 3 GRC Infra Pvt Ltd FY 2021-22.Pdf
Fd 4 GRC Infra Pvt Ltd FY 2023-24.Pdf
Fd 5 GRC Infra Pvt Ltd FY 2022-23.Pdf
Fd 6 GRC Infra Pvt Ltd FY 2021-22.Pdf
Fd 7 GRC Infra Pvt Ltd FY 2023-24.Pdf
Fd 8 GRC Infra Pvt Ltd FY 2022-23.Pdf
Fd 9 GRC Infra Pvt Ltd FY 2021-22.Pdf
Fd 10 GRC Infra Pvt Ltd FY 2023-24.Pdf
Fd 11 GRC Infra Pvt Ltd FY 2022-23.Pdf
Fd 12 GRC Infra Pvt Ltd FY 2021-22.Pdf
Fd 13 GRC Infra Pvt Ltd FY 2023-24.Pdf
Fd 14 GRC Infra Pvt Ltd FY 2022-23.Pdf
Fd 15 GRC Infra Pvt Ltd FY 2021-22.Pdf
Fd 16 GRC Infra Pvt Ltd FY 2023-24.Pdf
Fd 17 GRC Infra Pvt Ltd FY 2022-23.Pdf
Fd 18 GRC Infra Pvt Ltd FY 2021-22.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Photo 4 Project Photo
Od 1 GRC Infra Pvt Ltd FY 2021-22.Pdf
Od 2 GRC Infra Pvt Ltd FY 2022-23.Pdf
Od 3 GRC Infra Pvt Ltd FY 2023-24.Pdf
Od 4 Survey Sketch.Pdf
Od 5 Partition Deed.Pdf
Od 6 Akaraband.Pdf
Od 7 GPA - LAKSHMIKANTH.Pdf
Od 8 Certified- Guideline-Value-Gottigere.Pdf
Od 9 1 Site Plan.Pdf
Od 10 2 Lower And Upper Floor Basement Plan.Pdf
Od 11 3 Ground And 1st Floor Plan.Pdf
Od 12 4 2nd And 3rd Floor Plan.Pdf
Od 13 5 4th And 5th Floor Plan.Pdf
Od 14 6 6th And 7th Floor Plan.Pdf
Od 15 7 8th And 9th Floor Plan.Pdf
Od 16 8 10th And 11th Floor Plan.Pdf
Od 17 9 12th And 13th Floor Plan.Pdf
Od 18 10 14th And Terrace Floor Plan.Pdf
Od 19 11 Elevation And Section.Pdf
Od 20 CDP-DEMARCATION.Pdf
Od 21 Google Map DEMARCATION.Pdf
Od 22 Location-Demarcation.Pdf
Od 23 STP DEMARCATION SAPPHIRESPRINGS All Phases.Pdf
Od 24 Village Map Demarcation.Pdf
Od 25 Single Layout Approved Letter From BMICAPA.Pdf
Od 26 Area Stmt With Seal And Sign.Pdf
Od 27 Phasewise-Demarcation- Sapphire-Spring.Pdf
Od 28 Common Area And Amenities Facilities - Ph -1.Pdf
Od 29 Abstract-Estimation-Ph-1.Pdf
Od 30 Land-Calculationsheet-Ph-1.Pdf
Ed 1 26-12-2024
Ed 2 26-12-2024
Ed 3 26-12-2024
Ed 4 26-12-2024
Ed 5 26-12-2024
Ed 6 26-12-2024
Ed 7 26-12-2024
Ed 8 26-12-2024
Ed 9 26-12-2024
Ed 10 26-12-2024
Ed 11 26-12-2024
Ed 12 26-12-2024
Ed 13 13-01-2025
Ed 14 13-01-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Karnataka Bank Ltd.
Account Number (RERA) 0062202600001401
IFSC KARB0000062
Branch Address Minerva Circle
Country/City