Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

GRC Sapphire Spring RERA Details - PRM/KA/RERA/1251/310/PR/030225/007479 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for GRC Sapphire Spring under registration PRM/KA/RERA/1251/310/PR/030225/007479 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/030225/007479
  • Project Name GRC SAPPHIRE SPRING - PHASE -3
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 31 July 2030
  • Documents 91 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 10 June 2026 Expected commencement of civil works and foundation on site.
Original Completion 31 July 2030 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

GRC Infra Pvt. Ltd.
Registered Address No.161/A,7th Cross, Teachers Colony,1st stage, Kumaraswamy Layout ,Bengaluru South ,Bengaluru Urban-560078
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy.No.63/4, 63/5, 63/6, 63/7, 63/8, 63/9, 63/ 10, 63/11, 63/12 & 63/13 Situated at Gottigere village , Uttarahalli Hobli , Bengaluru South , Bengaluru Urban, Karnataka - 560083

RERA Coordinates

Latitude, Longitude 12.853384, 77.592923
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Addl.Dir/JDSouth/PRJ 3029/23-24
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 25 October 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Facilities centre 2 8 0 110 Residential 26.0 7 52

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
Facility centre 0 units
Studio 0 units
  • Facilities centre
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 Facility centre 448 Facility centre
GF Facility centre 394 Facility centre
1 Facility centre 459 Facility centre
2 Facility centre 277 Facility centre
3 Studio 24 FC 401
3 Studio 24 FC 402
3 Studio 24 FC 403
3 Studio 24 FC 404
3 Studio 23 FC 405
3 Studio 27 FC 406
3 Studio 24 FC 407
3 Studio 24 FC 408
3 Studio 24 FC 409
4 Studio 24 FC 501
4 Studio 24 FC 502
4 Studio 24 FC 503
4 Studio 24 FC 504
4 Studio 24 FC 505
4 Studio 24 FC 506
4 Studio 24 FC 507
4 Studio 24 FC 508
4 Studio 24 FC 509
4 Studio 24 FC 510
4 Studio 24 FC 511
4 Studio 24 FC 512
4 Studio 24 FC 513
4 Studio 24 FC 514
5 Studio 24 FC 601
5 Studio 24 FC 602
5 Studio 24 FC 603
5 Studio 24 FC 604
5 Studio 24 FC 605
5 Studio 24 FC 606
5 Studio 24 FC 607
5 Studio 24 FC 608
5 Studio 24 FC 609
5 Studio 24 FC 610
5 Studio 24 FC 611
5 Studio 24 FC 612
5 Studio 24 FC 613
5 Studio 24 FC 614
6 Studio 24 FC 701
6 Studio 24 FC 702
6 Studio 24 FC 703
6 Studio 24 FC 704
6 Studio 24 FC 705
6 Studio 24 FC 706
6 Studio 24 FC 707
6 Studio 24 FC 708
6 Studio 24 FC 709
6 Studio 24 FC 710
6 Studio 24 FC 711
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Amenities Hall % not reported
Common Areas Staircases % not reported Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported
Common Areas Fire Escapes % not reported Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported
Common Areas Terrace % not reported Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported
Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
1 Completion Certificate
2 Completion Certificate
Fd 1 GRC Infra Pvt Ltd FY 202324.Pdf
Fd 2 GRC Infra Pvt Ltd FY 202223.Pdf
Fd 3 GRC Infra Pvt Ltd FY 202122.Pdf
Fd 4 GRC Infra Pvt Ltd FY 202324.Pdf
Fd 5 GRC Infra Pvt Ltd FY 202223.Pdf
Fd 6 GRC Infra Pvt Ltd FY 202122.Pdf
Fd 7 GRC Infra Pvt Ltd FY 202324.Pdf
Fd 8 GRC Infra Pvt Ltd FY 202223.Pdf
Fd 9 GRC Infra Pvt Ltd FY 202122.Pdf
Fd 10 GRC Infra Pvt Ltd FY 202324.Pdf
Fd 11 GRC Infra Pvt Ltd FY 202223.Pdf
Fd 12 GRC Infra Pvt Ltd FY 202122.Pdf
Fd 13 GRC Infra Pvt Ltd FY 202324.Pdf
Fd 14 GRC Infra Pvt Ltd FY 202223.Pdf
Fd 15 GRC Infra Pvt Ltd FY 202122.Pdf
Fd 16 GRC Infra Pvt Ltd FY 202324.Pdf
Fd 17 GRC Infra Pvt Ltd FY 202223.Pdf
Fd 18 GRC Infra Pvt Ltd FY 202122.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Photo 4 Project Photo
Od 1 GRC Infra Pvt Ltd FY 202122.Pdf
Od 2 GRC Infra Pvt Ltd FY 202223.Pdf
Od 3 GRC Infra Pvt Ltd FY 202324.Pdf
Od 4 1 Site Plan.Pdf
Od 5 2 Lower And Upper Floor Basement Plan.Pdf
Od 6 3 Ground And 1st Floor Plan.Pdf
Od 7 4 2nd And 3rd Floor Plan.Pdf
Od 8 5 4th And 5th Floor Plan.Pdf
Od 9 6 6th And 7th Floor Plan.Pdf
Od 10 7 8th And 9th Floor Plan.Pdf
Od 11 8 10th And 11th Floor Plan.Pdf
Od 12 9 12th And 13th Floor Plan.Pdf
Od 13 10 14th And Terrace Floor Plan.Pdf
Od 14 11 Elevation And Section.Pdf
Od 15 CDP-DEMARCATION.Pdf
Od 16 Phasewise-Demarcation- Sapphire-Spring.Pdf
Od 17 Google Map DEMARCATION.Pdf
Od 18 Certified- Guideline-Value-Gottigere.Pdf
Od 19 Location-Demarcation.Pdf
Od 20 Single Layout Approved Letter From BMICAPA.Pdf
Od 21 Single Plot Layout.Jpeg
Od 22 STP DEMARCATION SAPPHIRESPRINGS All Phases.Pdf
Od 23 Village Map Demarcation.Pdf
Od 24 HAL NOC.Pdf
Od 25 Akaraband 63-7,8,9,1,11,12,13.Pdf
Od 26 Partition Deed.Pdf
Od 27 Podi Document 63-7.Pdf
Od 28 Phodidocuments.Pdf
Od 29 Survey Sketch 63-7.Pdf
Od 30 Survey Sketch.Pdf
Od 31 Phase 3 Valuvation Abstract.Pdf
Od 32 Phase 3 Land Cost Calculation.Pdf
Od 33 Area Statement Architect - Ph 3.Pdf
Od 34 Common Amenites - Ph 3.Pdf
Ed 1 26-12-2024
Ed 2 26-12-2024
Ed 3 26-12-2024
Ed 4 29-01-2025
Ed 5 29-01-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Karnataka Bank Ltd.
Account Number (RERA) 0062202600002001
IFSC KARB0000062
Branch Address Minerva Circle
Country/City