Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Lewis El Roi RERA Details - PRM/KA/RERA/1251/446/PR/241024/007170 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Lewis El Roi under registration PRM/KA/RERA/1251/446/PR/241024/007170 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/241024/007170
  • Project Name EL ROI
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 31 March 2028
  • Documents 63 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 16 October 2024 Expected commencement of civil works and foundation on site.
Original Completion 31 March 2028 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

LEWIS INFRASTRUCTURE AND PROJECTS
Registered Address NO.18, Lewis Techpark, Millers Road,,Benson Town ,Bengaluru North ,Bengaluru Urban-560046
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address No.105/1-1, Wheeler Road, Cooke Town , BBMP Ward No.59 , Bengaluru East , Bengaluru Urban, Karnataka - 560005

RERA Coordinates

Latitude, Longitude 12.998464089582525, 77.62265119047723
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Addl.Dir/JDNORTH/0102/23-24
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 15 October 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
EL ROI 1 5 0 39 Residential 15.0 5 35

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 1
Inventory Type RESIDENTIAL
Configuration Distribution
3 BHK 0 units
  • EL ROI
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 131.6 001
GF 3 BHK 119.4 002
GF 3 BHK 131.4 003
GF 3 BHK 128.4 004
GF 3 BHK 125.8 005
GF 3 BHK 112.1 006
GF 3 BHK 115.5 007
1 3 BHK 131.6 101
1 3 BHK 119.4 102
1 3 BHK 131.4 103
1 3 BHK 128.4 104
1 3 BHK 125.8 105
1 3 BHK 135.1 106
1 3 BHK 135.1 107
2 3 BHK 131.7 201
2 3 BHK 119.9 202
2 3 BHK 131.4 203
2 3 BHK 128.4 204
2 3 BHK 125.8 205
2 3 BHK 135.1 206
2 3 BHK 135.1 207
3 3 BHK 131.7 301
3 3 BHK 119.9 302
3 3 BHK 131.4 303
3 3 BHK 128.4 304
3 3 BHK 125.8 305
3 3 BHK 135.1 306
3 3 BHK 135.1 307
4 3 BHK 131.7 401
4 3 BHK 119.9 402
4 3 BHK 131.4 403
4 3 BHK 128.4 404
4 3 BHK 125.8 405
4 3 BHK 135.1 406
4 3 BHK 135.1 407
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Affidavit
Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
1 Completion Certificate
2 Completion Certificate
3 Completion Certificate
Fd 1 Balance Sheet With Schedule For FY 2022-23.Pdf
Fd 2 Lewis Balance Sheet FY 2021-22 With Schedules.Pdf
Fd 3 Lewis Balance Sheet FY 20-21 With Schedules.Pdf
Fd 4 Profit And Loss With Schedules FY 2022-23.Pdf
Fd 5 Lewis Profit Loss FY 2021-22 With Schedules.Pdf
Fd 6 Lewis Profit Loss FY 20-21 With Schedules.Pdf
Fd 7 Computation FY 2022-23.Pdf
Fd 8 Computation FY 2021-22.Pdf
Fd 9 Computation FY 2020-21.Pdf
Fd 10 Not Applicable.Pdf
Fd 11 Not Applicable.Pdf
Fd 12 Not Applicable.Pdf
Fd 13 3CB And 3CD.Pdf
Fd 14 Form 3CB CD FY 2021-22.Pdf
Fd 15 Lewis 3CB And 3CD FY 2020-21.Pdf
Fd 16 ITR V 2022-23.Pdf
Fd 17 ITR V FY 2021-22.Pdf
Fd 18 ITR V FY 2020-21.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 7 KSPCB( Annexure - 99 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 Basement Plan With STP And UGD Demarcation.Pdf
Od 2 2 17 Kammanahalli CDP 2015.Pdf
Od 3 Location And Demarcation Satellite Image.Pdf
Od 4 Local Area Map 72 Cum Village Map Cooke Town.Pdf
Od 5 El Roi Project Co-Ordinates.Pdf
Od 6 Mother Document With Will And Probate Of The Will.Pdf
Od 7 BBMP Tax 2024-25.Pdf
Od 8 BUILDING LICENSE COPY.Pdf
Od 9 Guidance Value Of Wheeler Road.Pdf
Od 10 ABSOLUTE SALE DEED.Pdf
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 57500001518012
IFSC HDFC0002855
Branch Address Nandidurga Road
Country/City