Squareyards Logo
Blogs
Download App Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Lorven Cascade Garden RERA Details - PRM/KA/RERA/1251/446/PR/311224/007332 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Lorven Cascade Garden under registration PRM/KA/RERA/1251/446/PR/311224/007332 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/311224/007332
  • Project Name LORVEN CASCADE GARDEN
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 28 December 2028
  • Documents 87 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 November 2024 Expected commencement of civil works and foundation on site.
Original Completion 28 December 2028 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

LORVEN VENTURES
Registered Address Sy no 116/10, Nagondanahalli,Krishnarajapura Hobli ,Bengaluru East ,Bengaluru Urban-560066
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

RERA Coordinates

Latitude, Longitude 12.973957, 77.763150
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Addl.Dir/JDNORTH/0036/24-25
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 16 October 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Wing A 1 12 0 139 Residential 29.95 9 80
Wing B 1 12 0 151 Residential 29.95 9 76
Wing C 1 12 0 151 Residential 29.95 9 76
Wing D 2 12 0 139 Residential 29.95 9 80

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Configurations 2
Inventory Type RESIDENTIAL
  • Wing A
  • Wing B
  • Wing C
  • Wing D
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 105.45 A-001
-1 3 BHK 105.45 A-002
-1 3 BHK 82.16 A-003
-1 2 BHK 72.61 A-004
-1 3 BHK 100.79 A-005
-1 3 BHK 100.79 A-006
-1 3 BHK 103.87 A-007
-1 3 BHK 103.87 A-008
GF 3 BHK 105.45 A-101
GF 3 BHK 105.45 A-102
GF 3 BHK 82.16 A-103
GF 3 BHK 82.16 A-104
GF 3 BHK 100.79 A-105
GF 3 BHK 100.79 A-106
GF 3 BHK 103.87 A-107
GF 3 BHK 103.87 A-108
1 3 BHK 105.45 A-201
1 3 BHK 105.45 A-202
1 3 BHK 82.16 A-203
1 3 BHK 82.16 A-204
1 3 BHK 100.79 A-205
1 3 BHK 100.79 A-206
1 3 BHK 103.87 A-207
1 3 BHK 103.87 A-208
2 3 BHK 105.45 A-301
2 3 BHK 105.45 A-302
2 3 BHK 82.16 A-303
2 3 BHK 82.16 A-304
2 3 BHK 100.79 A-305
2 3 BHK 100.79 A-306
2 3 BHK 103.87 A307
2 3 BHK 103.87 A-308
3 3 BHK 105.45 A-401
3 3 BHK 105.45 A-402
3 3 BHK 82.16 A-403
3 3 BHK 82.16 A-404
3 3 BHK 100.79 A-405
3 3 BHK 100.79 A-406
3 3 BHK 103.87 A-407
3 3 BHK 103.87 A-408
4 3 BHK 105.45 A-501
4 3 BHK 105.45 A-502
4 3 BHK 82.16 A-503
4 3 BHK 82.16 A-504
4 3 BHK 100.79 A-505
4 3 BHK 100.79 A-506
4 3 BHK 103.87 A-507
4 3 BHK 103.87 A-508
5 3 BHK 105.45 A-601
5 3 BHK 105.45 A-602
5 3 BHK 82.16 A-603
5 3 BHK 82.16 A-604
5 3 BHK 100.79 A-605
5 3 BHK 100.79 A-606
5 3 BHK 103.87 A-607
5 3 BHK 103.87 A-608
6 3 BHK 105.45 A-701
6 3 BHK 105.45 A-702
6 3 BHK 82.16 A-703
6 3 BHK 82.16 A-704
6 3 BHK 100.79 A-705
6 3 BHK 100.79 A-706
6 3 BHK 103.87 A-707
6 3 BHK 103.87 A-708
7 3 BHK 105.45 A-801
7 3 BHK 105.45 A-802
7 3 BHK 82.16 A-803
7 3 BHK 82.16 A-804
7 3 BHK 100.79 A-805
7 3 BHK 100.79 A-806
7 3 BHK 103.87 A-807
7 3 BHK 103.87 A-808
8 3 BHK 105.45 A-901
8 3 BHK 105.45 A-902
8 3 BHK 82.16 A-903
8 3 BHK 82.16 A-904
8 3 BHK 100.79 A-905
8 3 BHK 100.79 A-906
8 3 BHK 103.87 A-907
8 3 BHK 103.87 A-908
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
External Infrastructure Electricity Supply Transformer % not reported Amenities Electricity % not reported Amenities Smart Home Automation % not reported
Amenities Cctv Surveillance % not reported Amenities Club House % not reported Amenities Community Hall % not reported
Amenities Outdoor Sports Facility % not reported Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported
Amenities Gym % not reported Amenities Parks % not reported Amenities Power Backup % not reported
Amenities Piped Gas % not reported Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported
Amenities Transformer Yard % not reported Amenities Dg Yard % not reported Amenities Organic Waste Converter % not reported
Amenities Garbage Disposal % not reported Amenities Gas Bank % not reported Amenities Swimming Pool % not reported
Amenities Gym % not reported Amenities Creche % not reported Amenities Table Tennis Room % not reported
Amenities Association Room % not reported Amenities Aerobic % not reported Amenities Games Room % not reported
Amenities Party Hall % not reported Common Areas Staircases % not reported Common Areas Lifts % not reported
Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported
Common Areas Basement % not reported Common Areas Terrace % not reported Common Areas Outer Wall % not reported
Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported Common Areas Water Conservation And Renewable Energy % not reported
Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Financials FY 2023-24.Pdf
Fd 2 Financials FY 2022-23.Pdf
Fd 3 Financials FY 2021-22.Pdf
Fd 4 Financials FY 2023-24.Pdf
Fd 5 Financials FY 2022-23.Pdf
Fd 6 Financials FY 2021-22.Pdf
Fd 7 Financials FY 2023-24.Pdf
Fd 8 Financials FY 2022-23.Pdf
Fd 9 Financials FY 2021-22.Pdf
Fd 10 Financials FY 2023-24.Pdf
Fd 11 Financials FY 2022-23.Pdf
Fd 12 Financials FY 2021-22.Pdf
Fd 13 Financials FY 2023-24.Pdf
Fd 14 Financials FY 2022-23.Pdf
Fd 15 Financials FY 2021-22.Pdf
Fd 16 Financials FY 2023-24.Pdf
Fd 17 Financials FY 2022-23.Pdf
Fd 18 Financials FY 2021-22.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Photo 1 Project Photo
Od 1 Guidlines Values-Nagondanahalli.Pdf
Od 2 HAL NOC With Fees Receipt.Pdf
Od 3 Abstract Estimation.Pdf
Od 4 RERA UNIT AREA DETAILS.Pdf
Od 5 STP-FEASIBILITY-REPORT.Pdf
Od 6 STP-LOCATION-10B-24.Pdf
Od 7 Google Map Demarcation.Pdf
Od 8 CDP Demarcation.Pdf
Od 9 Village Map Demarcation.Pdf
Od 10 Partition Deed 116,4.Pdf
Od 11 Sale Deed 116-5 - 3345.Pdf
Od 12 Sale Deed 116-6 - 30701.Pdf
Od 13 Sale Deed 116-7 - 25661.Pdf
Od 14 Title Flow And Sale Deed Sy No 116-8 & 9.Pdf
Od 15 Sale Deed 116-10 -7999.Pdf
Od 16 Amalgamation Deed.Pdf
Od 17 GPA REC.Pdf
Od 18 GPA.Pdf
Od 19 JDA REC And JDA.Pdf
Od 20 Sale Deed - DOC No 8352.Pdf
Od 21 ADLR Sketch.Pdf
Od 22 Akarbandh, Survey Sketch, Village Map Hissa.Pdf
Od 23 Land Cost Calculation Sheet.Pdf
Od 24 Common Area And Amenities.Pdf
Ed 1 30-11-2024
Ed 2 30-11-2024
Ed 3 30-11-2024
Ed 4 30-11-2024
Ed 5 30-11-2024
Ed 6 30-11-2024
Ed 7 30-11-2024
Ed 8 30-11-2024
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Karnataka Bank Ltd.
Account Number (RERA) 0916202400001601
IFSC KARB0000916
Branch Address Rajarajeshwari Nagar
Country/City