Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Provident Deansgate RERA Details - PRM/KA/RERA/1250/303/PR/170325/007590 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Provident Deansgate under registration PRM/KA/RERA/1250/303/PR/170325/007590 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1250/303/PR/170325/007590
  • Project Name Provident Deansgate Phase 2
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Rural
  • Taluka Devanahalli
  • Original Completion 31 March 2028
  • Documents 97 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 April 2025 Expected commencement of civil works and foundation on site.
Original Completion 31 March 2028 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Puravankara Limited
Registered Address 130/1 Yellappa chetty Layout,Ulsoor Road Bangalore ,Bengaluru East ,Bengaluru Urban-560042
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy Nos. 41/1, 37/2, 37/4 (Old Sy No 37-1), 43/3, 36/4 (Old SY No 36/3) & 36/1 (Old SY No 36) , UGANAVADI VILLAGE, KASABA HOBLI, DEVANAHALLI TALUK, BENGALURU RURAL DISTRICT , Devanahalli , Bengaluru Rural, Karnataka - 562110

RERA Coordinates

Latitude, Longitude 13.2318437, 77.6518708
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BIAPPA/TP/CC/335/2024-25
Authority BIAPPA - Bangalore Airport Area Planning Authority
Approved Date 01 February 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Provident Deansgate Phase 2 0 3 0 141 Residential 9.95 2 141

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 1
Inventory Type RESIDENTIAL
Configuration Distribution
3 BHK 0 units
  • Provident Deansgate Phase 2
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 120.2 F1-01
-1 3 BHK 120.2 F2-01
-1 3 BHK 120.2 F3-01
-1 3 BHK 120.2 F4-01
-1 3 BHK 120.2 F5-01
-1 3 BHK 120.2 F6-01
-1 3 BHK 120.2 F7-01
-1 3 BHK 120.2 H1-01
-1 3 BHK 120.2 H2-01
-1 3 BHK 120.2 H3-01
-1 3 BHK 120.2 H4-01
-1 3 BHK 120.2 H5-01
-1 3 BHK 120.2 H6-01
-1 3 BHK 112.55 F14-01
-1 3 BHK 112.55 F13-01
-1 3 BHK 112.55 F12-01
-1 3 BHK 112.55 F11-01
-1 3 BHK 112.55 F10-01
-1 3 BHK 112.55 F9-01
-1 3 BHK 112.55 F8-01
-1 3 BHK 112.55 H12-01
-1 3 BHK 112.55 H11-01
-1 3 BHK 112.55 H10-01
-1 3 BHK 112.55 H9-01
-1 3 BHK 112.55 H8-01
-1 3 BHK 112.55 H7-01
-1 3 BHK 112.55 J21-01
-1 3 BHK 112.55 J20-01
-1 3 BHK 112.55 J19-01
-1 3 BHK 112.55 J18-01
-1 3 BHK 112.55 J17-01
-1 3 BHK 112.55 J16-01
-1 3 BHK 112.55 J15-01
-1 3 BHK 112.55 J14-01
-1 3 BHK 112.55 J13-01
-1 3 BHK 112.55 J12-01
-1 3 BHK 112.55 J11-01
-1 3 BHK 112.55 J10-01
-1 3 BHK 112.55 J9-01
-1 3 BHK 112.55 J8-01
-1 3 BHK 112.55 J7-01
-1 3 BHK 112.55 J6-01
-1 3 BHK 112.55 J5-01
-1 3 BHK 112.55 J4-01
-1 3 BHK 112.55 J3-01
-1 3 BHK 112.55 J2-01
-1 3 BHK 112.55 J1-01
GF 3 BHK 133.33 F1-02
GF 3 BHK 132.23 F1-03
GF 3 BHK 133.33 F2-02
GF 3 BHK 132.23 F2-03
GF 3 BHK 133.33 F3-02
GF 3 BHK 132.23 F3-03
GF 3 BHK 133.33 F4-02
GF 3 BHK 132.23 F4-03
GF 3 BHK 133.33 F5-02
GF 3 BHK 132.23 F5-03
GF 3 BHK 133.33 F6-02
GF 3 BHK 132.23 F6-03
GF 3 BHK 133.33 F7-02
GF 3 BHK 132.23 F7-03
GF 3 BHK 133.33 H1-02
GF 3 BHK 132.23 H1-03
GF 3 BHK 133.33 H2-02
GF 3 BHK 132.23 H2-03
GF 3 BHK 133.33 H3-02
GF 3 BHK 132.23 H3-03
GF 3 BHK 133.33 H4-02
GF 3 BHK 132.23 H4-03
GF 3 BHK 133.33 H5-02
GF 3 BHK 132.23 H5-03
GF 3 BHK 133.33 H6-02
GF 3 BHK 132.23 H6-03
GF 3 BHK 128.31 F14-02
GF 3 BHK 123.1 F14-03
GF 3 BHK 128.31 F13-02
GF 3 BHK 123.1 F13-03
GF 3 BHK 128.31 F12-02
GF 3 BHK 123.1 F12-03
GF 3 BHK 128.31 F11-02
GF 3 BHK 123.1 F11-03
GF 3 BHK 128.31 F10-02
GF 3 BHK 123.1 F10-03
GF 3 BHK 128.31 F9-02
GF 3 BHK 123.1 F9-03
GF 3 BHK 128.31 F8-02
GF 3 BHK 123.1 F8-03
GF 3 BHK 128.31 H12-02
GF 3 BHK 123.1 H12-03
GF 3 BHK 128.31 H11-02
GF 3 BHK 123.1 H11-03
GF 3 BHK 128.31 C10-02
GF 3 BHK 123.1 C10-03
GF 3 BHK 128.31 C11-02
GF 3 BHK 123.1 C11-03
GF 3 BHK 128.31 C12-02
GF 3 BHK 123.1 C12-03
GF 3 BHK 128.31 C13-02
GF 3 BHK 123.1 C13-03
GF 3 BHK 128.31 C14-02
GF 3 BHK 123.1 C14-03
GF 3 BHK 128.31 A6-02
GF 3 BHK 123.1 A6-03
GF 3 BHK 128.31 A7-02
GF 3 BHK 123.1 A7-03
GF 3 BHK 128.31 A8-02
GF 3 BHK 123.1 A8-03
GF 3 BHK 128.31 A9-02
GF 3 BHK 123.1 A9-03
GF 3 BHK 128.31 A10-02
GF 3 BHK 123.1 A10-03
GF 3 BHK 128.31 A11-02
GF 3 BHK 123.1 A11-03
GF 3 BHK 128.31 A12-02
GF 3 BHK 123.1 A12-03
GF 3 BHK 132.23 B8-02
GF 3 BHK 133.33 B8-03
GF 3 BHK 132.23 B7-02
GF 3 BHK 133.33 B7-03
GF 3 BHK 132.23 B6-02
GF 3 BHK 133.33 B6-03
GF 3 BHK 132.23 B5-02
GF 3 BHK 133.33 B5-03
GF 3 BHK 132.23 B4-02
GF 3 BHK 133.33 B4-03
GF 3 BHK 132.23 B3-02
GF 3 BHK 133.33 B3-03
GF 3 BHK 132.23 B2-02
GF 3 BHK 133.33 B2-03
GF 3 BHK 123.1 B1-02
GF 3 BHK 128.31 B1-03
GF 3 BHK 128.31 J5-02
GF 3 BHK 123.1 J5-03
GF 3 BHK 128.31 J4-02
GF 3 BHK 123.1 J4-03
GF 3 BHK 128.31 J3-02
GF 3 BHK 123.1 J3-03
GF 3 BHK 128.31 J2-02
GF 3 BHK 123.1 J2-03
GF 3 BHK 128.31 J1-02
GF 3 BHK 123.1 J1-03
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sup Structure Railing And Grill Fixing % not reported Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported
Sub Structure Upto Plinth Level % not reported Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported
Sup Structure Rcc Or Ms Framed Structure % not reported Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported
Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Fd 2 22 Balance Sheet.Pdf
Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
1 Completion Certificate
Fd 1 23 Balance Sheet.Pdf
Fd 3 21 Balance Sheet.Pdf
Fd 4 23 Statement Of P & L.Pdf
Fd 5 22 Statement Of P & L.Pdf
Fd 6 21 Statement Of P & L.Pdf
Fd 7 AY 23 ITR.Pdf
Fd 8 AY 22 ITR.Pdf
Fd 9 AY 21 ITR.Pdf
Fd 10 Directors Report 23.Pdf
Fd 11 Directors'S Report 22 (1).Pdf
Fd 12 Director'S Report 21.Pdf
Fd 13 23 Cash Flow Statement.Pdf
Fd 14 22 Cash Flow Statement.Pdf
Fd 15 21 Cash Flow Statment.Pdf
Fd 16 23 Independent Auditors Report.Pdf
Fd 17 22 Independent Auditors Report.Pdf
Fd 18 21 Independent Auditors Report.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Noc 8 Lift Authorities( Annexure - 102 )
Noc 9 BMRCL( Annexure - 103 )
Noc 10 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 11 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 12 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 13 Coastal Regulation Zone Authority( Annexure - 107 )
Photo 1 Project Photo
Od 1 9 - Village Map.Pdf
Od 2 DEANSGATE- CDP.JPG
Od 3 DEANSGATE LOCATION IN CDP.JPG
Od 4 Block Wise Demarcated.Pdf
Od 5 CLU.Pdf
Od 6 Phase Wise Demarcation.Pdf
Od 7 STP PLAN.Pdf
Od 8 Power NOC Attested.Pdf
Od 9 Area Details.Pdf
Od 10 Block 8 Floor Plan.Jpg
Od 11 Block 8 Section And Elevation.Jpg
Od 12 Block 9 Floor Plan.Jpg
Od 13 Block 9 Section And Elevation.Jpg
Od 14 Block 10 Floor Plan.Jpg
Od 15 Block 10 Section And Elevation.Jpg
Od 16 Block 11 Floor Plan.Jpg
Od 17 Block 11 Section And Elevation.Jpg
Od 18 Block 12 Floor Plan.Jpg
Od 19 Block 12 Section And Elevation.Jpg
Od 20 Block 13 Floor Plan.Jpg
Od 21 Block 13 Section And Elevation.Jpg
Od 22 Site Approved Plan.Jpg
Od 23 Budget Signed Estimated Cost.Pdf
Od 24 Carpet Area Details.Pdf
Od 25 Guildine Value Self Attested.Pdf
Ed 1 12-03-2025
Ed 2 12-03-2025
Ed 3 12-03-2025
Ed 4 12-03-2025
Ed 5 12-03-2025
Ed 6 12-03-2025
Ed 7 12-03-2025
Ed 8 12-03-2025
Ed 9 12-03-2025
Ed 10 12-03-2025
Ed 11 12-03-2025
Ed 12 12-03-2025
Ed 13 12-03-2025
Ed 14 12-03-2025
Ed 15 12-03-2025
Ed 16 12-03-2025
Ed 17 12-03-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Axis Bank
Account Number (RERA) 926020010825001
IFSC UTIB0001541
Branch Address Corporate Branch Bangalore
Country/City