Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.ka

S2 Violet RERA Details - PRM/KA/RERA/1251/446/PR/250523/005943 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for S2 Violet under registration PRM/KA/RERA/1251/446/PR/250523/005943 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/250523/005943
  • Project Name S2 VIOLET
  • Project Type Residential/Group Housing
  • Project Status Ready to Move
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 31 December 2024
  • Documents 56 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 January 2023 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2024 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

S2 DEVELOPERS
Registered Address Terrace Floor, No.3 and 4,Flat No.401, Primerose Apartment, Kalyannagar Post ,Bengaluru East ,Bengaluru Urban-560043
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Site Nos.14,15,16 & 17, Portion of Old BBMP Katha No.230/14/232/4, 230/15/232/4, 230/16/232/4 & 230/17/232/4 BBMP Khatha No.230/14,15,16,17/234/4 , HORAMAVU AGARA VILLAGE, K.R.PURAM HOBLI , Bengaluru East , Bengaluru Urban, Karnataka - 560043

RERA Coordinates

Latitude, Longitude 13.0411068, 77.6622027
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Ad.Com./MDP/0555/22-23
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 02 December 2022

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
S2 VIOLET 0 5 1 64 Residential 14.4 3 64

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • S2 VIOLET
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 92.34 G01
-1 3 BHK 105.07 G02
-1 2 BHK 73.11 G03
-1 2 BHK 71.16 G04
-1 2 BHK 71.16 G05
-1 2 BHK 71.72 G06
-1 2 BHK 70.33 G07
-1 3 BHK 100.71 G08
-1 3 BHK 87.24 G09
-1 3 BHK 93.83 G10
-1 2 BHK 66.98 G11
-1 2 BHK 65.40 G12
-1 3 BHK 82.96 G13
-1 3 BHK 84.45 G14
-1 3 BHK 79.99 G15
-1 3 BHK 86.03 G16
GF 3 BHK 92.34 101
GF 3 BHK 105.07 102
GF 2 BHK 73.11 103
GF 2 BHK 71.16 104
GF 2 BHK 71.16 105
GF 2 BHK 71.72 106
GF 2 BHK 70.33 107
GF 3 BHK 100.71 108
GF 3 BHK 87.24 109
GF 3 BHK 93.83 110
GF 2 BHK 66.98 111
GF 2 BHK 65.40 112
GF 3 BHK 82.96 113
GF 3 BHK 84.45 114
GF 3 BHK 79.99 115
GF 3 BHK 86.03 116
1 3 BHK 92.34 201
1 3 BHK 105.07 202
1 2 BHK 73.11 203
1 2 BHK 71.16 204
1 2 BHK 71.16 205
1 2 BHK 71.72 206
1 2 BHK 70.33 207
1 3 BHK 100.71 208
1 3 BHK 87.24 209
1 3 BHK 93.83 210
1 2 BHK 66.98 211
1 2 BHK 65.40 212
1 3 BHK 82.96 213
1 3 BHK 84.45 214
1 3 BHK 79.99 215
1 3 BHK 86.03 216
2 3 BHK 92.34 301
2 3 BHK 105.07 302
2 2 BHK 73.11 303
2 2 BHK 71.16 304
2 2 BHK 71.16 305
2 2 BHK 71.72 306
2 2 BHK 70.33 307
2 3 BHK 100.71 308
2 3 BHK 87.24 309
2 3 BHK 93.83 310
2 2 BHK 66.98 311
2 2 BHK 65.40 312
2 3 BHK 82.96 313
2 3 BHK 84.45 314
2 3 BHK 79.99 315
2 3 BHK 86.03 316
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 ITR AY 2021-22.Pdf
Fd 2 ITR AY 2021-22.Pdf
Fd 3 ITR AY 2021-22.Pdf
Fd 4 ITR AY 2021-22.Pdf
Fd 5 ITR AY 2021-22.Pdf
Fd 6 ITR AY 2021-22.Pdf
Fd 7 ITR AY 2021-22.Pdf
Fd 8 ITR AY 2021-22.Pdf
Fd 9 ITR AY 2021-22.Pdf
Fd 10 ITR AY 2021-22.Pdf
Fd 11 ITR AY 2021-22.Pdf
Fd 12 ITR AY 2021-22.Pdf
Fd 13 ITR AY 2021-22.Pdf
Fd 14 ITR AY 2021-22.Pdf
Fd 15 ITR AY 2021-22.Pdf
Fd 16 ITR AY 2021-22.Pdf
Fd 17 ITR AY 2021-22.Pdf
Fd 18 ITR AY 2021-22.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Photo 1 Project Photo
Ed 1 20-03-2023
Ed 2 20-03-2023
Ed 3 20-03-2023
Ed 4 20-03-2023
Ed 5 20-03-2023
Ed 6 20-03-2023
Ed 7 20-03-2023
Ed 8 17-05-2023
Ed 9 17-05-2023
Ed 10 17-05-2023
Ed 11 17-05-2023
Ed 12 17-05-2023
Ed 13 17-05-2023
Ed 14 17-05-2023
Ed 15 17-05-2023
Ed 16 17-05-2023
Ed 17 17-05-2023
Ed 18 17-05-2023
Ed 19 17-05-2023
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 50200077411761
IFSC HDFC0004367
Branch Address HRBR Layout Branch
Country/City