residential Partially Ready To Move Source: rera.ka

Shapoorji Pallonji ParkWest RERA Details - PRM/KA/RERA/1251/310/PR/180122/004645 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Shapoorji Pallonji ParkWest under registration PRM/KA/RERA/1251/310/PR/180122/004645 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/180122/004645
  • Project Name Parkwest - Cedar - Tower 8
  • Project Type Residential/Group Housing
  • Project Status Partially Ready To Move
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 31 December 2026
  • Documents 104 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 March 2022 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2026 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Relationship Properties Private Limited
Registered Address No 1/1, Binnymill road,Binnypet ,Bengaluru South ,Bengaluru Urban-560023
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Municipal No 1/1, Binnymill Road, , Binnypet , Bengaluru South , Bengaluru Urban, Karnataka - 560023

RERA Coordinates

Latitude, Longitude 12.96619, 77.56044
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. LP31/10-11
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 12 March 2020

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
CEDAR 2 33 0 273 Residential 101.05 32 225

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 4
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
5 BHK 0 units
  • CEDAR
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 109.43 1
-1 3 BHK 111.21 2
-1 2.5 BHK 89.53 3
-1 1 BHK 43.63 4
-1 2 BHK 70.37 5
GF 3 BHK 109.43 101
GF 3 BHK 111.21 102
GF 2.5 BHK 89.53 103
GF 1 BHK 43.63 104
GF 2 BHK 70.37 105
1 3 BHK 109.43 201
1 3 BHK 111.21 202
1 2.5 BHK 89.53 203
1 1 BHK 43.63 204
1 2 BHK 70.37 205
1 2.5 BHK 90.02 206
1 3 BHK 109.06 207
2 3 BHK 109.43 301
2 3 BHK 111.21 302
2 2.5 BHK 89.53 303
2 1 BHK 43.63 304
2 2 BHK 70.37 305
2 2.5 BHK 90.02 306
2 3 BHK 109.06 307
3 3 BHK 109.43 401
3 3 BHK 111.21 402
3 2.5 BHK 89.53 403
3 1 BHK 43.63 404
3 2 BHK 70.37 405
3 2.5 BHK 90.02 406
3 3 BHK 109.06 407
4 3 BHK 109.43 501
4 3 BHK 111.21 502
4 2.5 BHK 89.53 503
4 1 BHK 43.63 504
4 2 BHK 70.37 505
4 2.5 BHK 90.02 506
4 3 BHK 109.06 507
5 3 BHK 109.43 601
5 3 BHK 111.21 602
5 2.5 BHK 89.53 603
5 1 BHK 43.63 604
5 2 BHK 70.37 605
5 2.5 BHK 90.02 606
5 3 BHK 109.06 607
6 3 BHK 109.43 701
6 3 BHK 111.21 702
6 2.5 BHK 89.53 703
6 1 BHK 43.63 704
6 2 BHK 70.37 705
6 2.5 BHK 90.02 706
6 3 BHK 109.06 707
7 3 BHK 109.43 801
7 3 BHK 111.21 802
7 2.5 BHK 89.53 803
7 1 BHK 43.63 804
7 2 BHK 70.37 805
7 2.5 BHK 90.02 806
7 3 BHK 109.06 807
8 3 BHK 109.43 901
8 3 BHK 111.21 902
8 2.5 BHK 89.53 903
8 1 BHK 43.63 904
8 2 BHK 70.37 905
8 2.5 BHK 90.02 906
8 3 BHK 109.06 907
9 3 BHK 109.43 1001
9 3 BHK 111.21 1002
9 2.5 BHK 89.53 1003
9 1 BHK 43.63 1004
9 2 BHK 70.37 1005
9 2.5 BHK 90.02 1006
9 3 BHK 109.06 1007
10 3 BHK 109.43 1101
10 3 BHK 111.21 1102
10 2.5 BHK 89.53 1103
10 1 BHK 43.63 1104
10 2 BHK 70.37 1105
10 2.5 BHK 90.02 1106
10 3 BHK 109.06 1107
11 3 BHK 109.43 1201
11 3 BHK 111.21 1202
11 2.5 BHK 89.53 1203
11 1 BHK 43.63 1204
11 2 BHK 70.37 1205
11 2.5 BHK 90.02 1206
11 3 BHK 109.06 1207
12 3 BHK 109.43 1301
12 3 BHK 111.21 1302
12 2.5 BHK 89.53 1303
12 1 BHK 43.63 1304
12 2 BHK 70.37 1305
12 2.5 BHK 90.02 1306
12 3 BHK 109.06 1307
13 3 BHK 109.43 1401
13 3 BHK 111.21 1402
13 2.5 BHK 89.53 1403
13 1 BHK 43.63 1404
13 2 BHK 70.37 1405
13 2.5 BHK 90.02 1406
13 3 BHK 109.06 1407
14 3 BHK 109.43 1501
14 3 BHK 111.21 1502
14 2.5 BHK 89.53 1503
14 1 BHK 43.63 1504
14 2 BHK 70.37 1505
14 2.5 BHK 90.02 1506
14 3 BHK 109.06 1507
15 3 BHK 109.43 1601
15 3 BHK 111.21 1602
15 2.5 BHK 89.53 1603
15 1 BHK 43.63 1604
15 2 BHK 70.37 1605
15 2.5 BHK 90.02 1606
15 3 BHK 109.06 1607
16 3 BHK 109.43 1701
16 3 BHK 111.21 1702
16 2.5 BHK 89.53 1703
16 1 BHK 43.63 1704
16 2 BHK 70.37 1705
16 2.5 BHK 90.02 1706
16 3 BHK 109.06 1707
17 3 BHK 109.43 1801
17 3 BHK 111.21 1802
17 2.5 BHK 89.53 1803
17 2 BHK 70.37 1805
17 2.5 BHK 90.02 1806
17 3 BHK 109.06 1807
18 3 BHK 109.43 1901
18 3 BHK 111.21 1902
18 2.5 BHK 89.53 1903
18 1 BHK 43.63 1904
18 2 BHK 70.37 1905
18 2.5 BHK 90.02 1906
18 3 BHK 109.06 1907
19 3 BHK 109.43 2001
19 3 BHK 111.21 2002
19 2.5 BHK 89.53 2003
19 1 BHK 43.63 2004
19 2 BHK 70.37 2005
19 2.5 BHK 90.02 2006
19 3 BHK 109.06 2007
20 3 BHK 109.43 2101
20 3 BHK 111.21 2102
20 2.5 BHK 89.53 2103
20 1 BHK 43.63 2104
20 2 BHK 70.37 2105
20 2.5 BHK 90.02 2106
20 3 BHK 109.06 2107
21 3 BHK 109.43 2201
21 3 BHK 111.21 2202
21 2.5 BHK 89.53 2203
21 1 BHK 43.63 2204
21 2 BHK 70.37 2205
21 2.5 BHK 90.02 2206
21 3 BHK 109.06 2207
22 3 BHK 109.43 2301
22 3 BHK 111.21 2302
22 2.5 BHK 89.53 2303
22 1 BHK 43.63 2304
22 2 BHK 70.37 2305
22 2.5 BHK 90.02 2306
22 3 BHK 109.06 2307
23 3 BHK 109.43 2401
23 3 BHK 111.21 2402
23 2.5 BHK 89.53 2403
23 1 BHK 43.63 2404
23 2 BHK 70.37 2405
23 2.5 BHK 90.02 2406
23 3 BHK 109.06 2407
24 3 BHK 109.43 2501
24 3 BHK 111.21 2502
24 2.5 BHK 89.53 2503
24 1 BHK 43.63 2504
24 2 BHK 70.37 2505
24 2.5 BHK 90.02 2506
24 3 BHK 109.06 2507
25 3 BHK 109.43 2601
25 3 BHK 111.21 2602
25 2.5 BHK 89.53 2603
25 1 BHK 43.63 2604
25 2 BHK 70.37 2605
25 2.5 BHK 90.02 2606
25 3 BHK 109.06 2607
26 3 BHK 109.43 2701
26 3 BHK 111.21 2702
26 2.5 BHK 89.53 2703
26 1 BHK 43.63 2704
26 2 BHK 70.37 2705
26 2.5 BHK 90.02 2706
26 3 BHK 109.06 2707
27 3 BHK 109.43 2801
27 3 BHK 111.21 2802
27 2.5 BHK 89.53 2803
27 2 BHK 70.37 2805
27 2.5 BHK 90.02 2806
27 3 BHK 109.06 2807
28 3 BHK 109.43 2901
28 3 BHK 111.21 2902
28 2.5 BHK 89.53 2903
28 1 BHK 43.63 2904
28 2 BHK 70.37 2905
28 2.5 BHK 90.02 2906
28 3 BHK 109.06 2907
29 3 BHK 109.43 3001
29 3 BHK 111.21 3002
29 2.5 BHK 89.53 3003
29 1 BHK 43.63 3004
29 2 BHK 70.37 3005
29 2.5 BHK 90.02 3006
29 3 BHK 109.06 3007
30 3 BHK 109.43 3101
30 3 BHK 111.21 3102
30 2.5 BHK 89.53 3103
30 1 BHK 43.63 3104
30 2 BHK 70.37 3105
30 2.5 BHK 90.02 3106
30 3 BHK 109.06 3107
31 3 BHK 109.43 3201
31 3 BHK 111.21 3202
31 2.5 BHK 89.53 3203
31 1 BHK 43.63 3204
31 2 BHK 70.37 3205
31 2.5 BHK 90.02 3206
31 3 BHK 109.06 3207
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
1 Completion Certificate
2 Completion Certificate
6 Completion Certificate
Fd 1 Balanc Sheet 2020-21.Pdf
Fd 2 Balance Sheet 2019 - 20.Pdf
Fd 3 Balance Sheet 2018 - 19.Pdf
Fd 4 Profit And Loss 2020-21.Pdf
Fd 5 Profit And Loss 2019-20.Pdf
Fd 6 Profit And Loss 2018-19.Pdf
Fd 7 Not Available.Pdf
Fd 8 Director Report 2019-20.Pdf
Fd 9 Directors Report 2018-19.Pdf
Fd 10 Cash Flow 2020-21.Pdf
Fd 11 Cash Flow 2019 - 20.Pdf
Fd 12 Cash Flow 2018 - 19.Pdf
Fd 13 Auditor Report 2020-21.Pdf
Fd 14 Auditors Report 2019-20.Pdf
Fd 15 Auditors Report 2018-19.Pdf
Fd 16 Not Available.Pdf
Fd 17 IT Return 2019-20.Pdf
Fd 18 IT Return 2018-19.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 23 Proforma For Sale Deed*( Annexure - 88 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 Clarification About Installation Of STP.Pdf
Od 2 Clarification About Sold And Unsold Units.Pdf
Od 3 4 Site Plan BBMP.Pdf
Od 4 Clarification About Non-Production Of Brochures.Pdf
Od 5 5 Demarcation Plan.Pdf
Od 6 9 Lower Basement Plan.Pdf
Od 7 8 T8 - Elevation Plan.Pdf
Od 8 12 T8 - 1 Floor Plan.Pdf
Od 9 20 T8 - 29 30 31 32 Floor Plan.Pdf
Od 10 6 T8 - Demarcation Site Plan.Pdf
Od 11 18 T8 - 18 Floor Plan.Pdf
Od 12 10 Upper Basement.Pdf
Od 13 3 BBMP Plan Approval Letter.Pdf
Od 14 1 BDA Work Order.Pdf
Od 15 17 T8 - 9 27 Floor Plan.Pdf
Od 16 21 T8 - Terrace Floor Plan.Pdf
Od 17 15 T8 - 5 6 7 14 15 16 23 24 25 Floor Plan.Pdf
Od 18 14 T8 - 3 4 10 11 12 13 19 20 21 22 Floor Plan.Pdf
Od 19 7 T8 - Section Plan.Pdf
Od 20 13 T8 - 2 Floor Plan.Pdf
Od 21 19 T8 - 28 Floor Plan.Pdf
Od 22 16 T8 - 8 17 26 Floor Plan.Pdf
Od 23 2 BDA Approved Plan.Pdf
Od 24 11 T8 - Ground Floor Plan.Pdf
Od 25 U G SUMP And STP LAYOUT PHE.Pdf
Od 26 Title Deed.Pdf
Ed 1 13-01-2022
Ed 2 13-01-2022
Ed 3 13-01-2022
Ed 4 13-01-2022
Ed 5 13-01-2022
Ed 6 13-01-2022
Ed 7 13-01-2022
Ed 8 13-01-2022
Ed 9 13-01-2022
Ed 10 13-01-2022
Ed 11 13-01-2022
Ed 12 13-01-2022
Ed 13 13-01-2022
Ed 14 13-01-2022
Ed 15 13-01-2022
Ed 16 13-01-2022
Ed 17 13-01-2022
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 57500000469020
IFSC HDFC0004000
Branch Address RAJAJINAGAR DR RAJKUMAR ROAD
Country/City