residential Partially Ready To Move Source: rera.ka

Shapoorji Pallonji ParkWest RERA Details - PRM/KA/RERA/1251/310/PR/220124/006569 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Shapoorji Pallonji ParkWest under registration PRM/KA/RERA/1251/310/PR/220124/006569 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/220124/006569
  • Project Name Parkwest - Sequoia - Tower 11
  • Project Type Residential/Group Housing
  • Project Status Partially Ready To Move
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 27 February 2029
  • Documents 87 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 April 2024 Expected commencement of civil works and foundation on site.
Original Completion 27 February 2029 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Relationship Properties Private Limited
Registered Address No 1/1, Binnymill Road,Binnypet ,Bengaluru South ,Bengaluru Urban-560023
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Municipal No 1/1, Binnymill Road , Binnypet , Bengaluru South , Bengaluru Urban, Karnataka - 560023

RERA Coordinates

Latitude, Longitude 12.964129, 77.560077
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. PRJ/0810/23-24
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 04 January 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Parkwest - Sequoia - Tower 11 1 32 0 201 Residential 101.2 30 182

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
3 BHK 0 units
4 BHK 0 units
  • Parkwest - Sequoia - Tower 11
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 116.08 001
-1 3 BHK 118.18 002
-1 3 BHK 117.95 003
-1 3 BHK 115.85 004
GF 3 BHK 116.08 101
GF 3 BHK 118.18 102
GF 3 BHK 117.95 103
GF 3 BHK 115.85 104
1 3 BHK 116.08 201
1 3 BHK 118.18 202
1 3 BHK 117.95 203
1 3 BHK 115.85 204
1 4 BHK 153.4 205
1 4 BHK 152.83 206
2 3 BHK 116.08 301
2 3 BHK 118.18 302
2 3 BHK 117.95 303
2 3 BHK 115.85 304
2 4 BHK 153.4 305
2 4 BHK 152.83 306
3 3 BHK 116.08 401
3 3 BHK 118.18 402
3 3 BHK 117.95 403
3 3 BHK 115.85 404
3 4 BHK 153.4 405
3 4 BHK 152.83 406
4 3 BHK 116.05 501
4 3 BHK 118.16 502
4 3 BHK 118.12 503
4 3 BHK 115.85 504
4 4 BHK 153.42 505
4 4 BHK 152.83 506
5 3 BHK 116.05 601
5 3 BHK 118.16 602
5 3 BHK 118.12 603
5 3 BHK 115.85 604
5 4 BHK 153.42 605
5 4 BHK 152.83 606
6 3 BHK 116.05 701
6 3 BHK 118.16 702
6 3 BHK 118.12 703
6 3 BHK 115.85 704
6 4 BHK 153.42 705
6 4 BHK 152.83 706
7 3 BHK 116.05 801
7 3 BHK 118.16 802
7 3 BHK 117.95 803
7 3 BHK 115.85 804
7 4 BHK 153.42 805
7 4 BHK 152.83 806
8 3 BHK 116.08 901
8 3 BHK 118.18 902
8 3 BHK 117.95 903
8 3 BHK 115.85 904
8 4 BHK 153.4 905
8 4 BHK 152.83 906
9 3 BHK 116.08 1001
9 3 BHK 118.18 1002
9 3 BHK 117.95 1003
9 3 BHK 115.85 1004
9 4 BHK 153.4 1005
9 4 BHK 152.83 1006
10 3 BHK 116.08 1101
10 3 BHK 118.18 1102
10 3 BHK 117.95 1103
10 3 BHK 115.85 1104
10 4 BHK 153.4 1105
10 4 BHK 152.83 1106
11 3 BHK 116.08 1201
11 3 BHK 118.18 1202
11 3 BHK 117.95 1203
11 3 BHK 115.85 1204
11 4 BHK 153.4 1205
11 4 BHK 152.83 1206
12 3 BHK 116.05 1301
12 3 BHK 118.16 1302
12 3 BHK 118.12 1303
12 3 BHK 115.85 1304
12 4 BHK 153.42 1305
12 4 BHK 152.83 1306
13 3 BHK 116.05 1401
13 3 BHK 118.16 1402
13 3 BHK 118.12 1403
13 3 BHK 115.85 1404
13 4 BHK 153.42 1405
13 4 BHK 152.83 1406
14 3 BHK 116.05 1501
14 3 BHK 118.16 1502
14 3 BHK 118.12 1503
14 3 BHK 115.85 1504
14 4 BHK 153.42 1505
14 4 BHK 152.83 1506
15 3 BHK 116.05 1601
15 3 BHK 118.16 1602
15 3 BHK 117.95 1603
15 3 BHK 115.85 1604
15 4 BHK 153.42 1605
15 4 BHK 152.83 1606
16 3 BHK 116.08 1701
16 3 BHK 118.18 1702
16 3 BHK 117.95 1703
16 3 BHK 115.85 1704
16 3 BHK 123.12 1705
16 3 BHK 130.36 1706
17 3 BHK 116.08 1801
17 3 BHK 118.18 1802
17 3 BHK 117.95 1803
17 3 BHK 115.85 1804
17 4 BHK 153.4 1805
17 4 BHK 152.83 1806
18 3 BHK 116.08 1901
18 3 BHK 118.18 1902
18 3 BHK 117.95 1903
18 3 BHK 115.85 1904
18 4 BHK 153.4 1905
18 4 BHK 152.83 1906
19 3 BHK 116.08 2001
19 3 BHK 118.18 2002
19 3 BHK 117.95 2003
19 3 BHK 115.85 2004
19 4 BHK 153.4 2005
19 4 BHK 152.83 2006
20 3 BHK 116.05 2101
20 3 BHK 118.16 2102
20 3 BHK 118.12 2103
20 3 BHK 115.85 2104
20 4 BHK 153.42 2105
20 4 BHK 152.83 2106
21 3 BHK 116.05 2201
21 3 BHK 118.16 2202
21 3 BHK 118.12 2203
21 3 BHK 115.85 2204
21 4 BHK 153.42 2205
21 4 BHK 152.83 2206
22 3 BHK 116.05 2301
22 3 BHK 118.16 2302
22 3 BHK 118.12 2303
22 3 BHK 115.85 2304
22 4 BHK 153.42 2305
22 4 BHK 152.83 2306
23 3 BHK 116.05 2401
23 3 BHK 118.16 2402
23 3 BHK 117.95 2403
23 3 BHK 115.85 2404
23 4 BHK 153.42 2405
23 4 BHK 152.83 2406
24 3 BHK 116.08 2501
24 3 BHK 118.18 2502
24 3 BHK 117.95 2503
24 3 BHK 115.85 2504
24 4 BHK 153.4 2505
24 4 BHK 152.83 2506
25 3 BHK 116.08 2601
25 3 BHK 118.18 2602
25 3 BHK 117.95 2603
25 3 BHK 115.85 2604
25 3 BHK 123.12 2605
25 3 BHK 130.36 2606
26 3 BHK 116.08 2701
26 3 BHK 118.34 2702
26 3 BHK 117.95 2703
26 3 BHK 115.85 2704
26 4 BHK 153.37 2705
26 4 BHK 152.83 2706
27 3 BHK 116.08 2801
27 3 BHK 118.34 2802
27 3 BHK 117.95 2803
27 3 BHK 115.85 2804
27 4 BHK 153.37 2805
27 4 BHK 152.83 2806
28 3 BHK 116.08 2901
28 3 BHK 118.34 2902
28 3 BHK 117.95 2903
28 3 BHK 115.85 2904
28 4 BHK 153.37 2905
28 4 BHK 152.83 2906
29 3 BHK 116.08 3001
29 3 BHK 118.34 3002
29 3 BHK 117.95 3003
29 3 BHK 115.85 3004
29 4 BHK 153.37 3005
29 4 BHK 152.83 3006
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 RPPL FINANCIALS 22-23.Pdf
Fd 2 RPPL Full Set Financials - March 2022.Pdf
Fd 3 Financial Statement 2020-21.Pdf
Fd 4 RPPL FINANCIALS 22-23.Pdf
Fd 5 RPPL Full Set Financials - March 2022.Pdf
Fd 6 Financial Statement 2020-21.Pdf
Fd 7 RPPL FINANCIALS 22-23.Pdf
Fd 8 RPPL Full Set Financials - March 2022.Pdf
Fd 9 Financial Statement 2020-21.Pdf
Fd 10 RPPL FINANCIALS 22-23.Pdf
Fd 11 RPPL Full Set Financials - March 2022.Pdf
Fd 12 Financial Statement 2020-21.Pdf
Fd 13 RPPL ANNUAL AUDIT REPORT 22-23.Pdf
Fd 14 RPPL Full Set Audit Report - March 2022.Pdf
Fd 15 Auditor Report 2020-21.Pdf
Fd 16 RPPL ITR Ackn FY 22-23.Pdf
Fd 17 RPPL Form ITR 6 AY 2022-23.Pdf
Fd 18 ITR Ack AY 2021-22.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 STP Demarcation.Pdf
Od 2 STP Design.Pdf
Od 3 Location Demarcation.Pdf
Od 4 CDP Demarcation.Pdf
Od 5 Village Map Demarcation.Pdf
Od 6 ENGINEER Estimation Summary.Pdf
Od 7 T11 RERA CARPET AREA FOR REGISTRATION.Pdf
Od 8 HAL NOC Dated 07-01-2023.Pdf
Od 9 Guidelines Value.Pdf
Od 10 MOA AOA And Incorporation Certificate.Pdf
Od 11 Ministry Of Corporate Affairs - MCA Services.Pdf
Od 12 2 T11-Ground Floor.Pdf
Od 13 3 T11- Basement Floor.Pdf
Od 14 4 T11-Section & Elevation.Pdf
Od 15 5 T11- Typ 2nd 4th To 20th Floor.Pdf
Od 16 6 T11- Typ 9th&25 Floor.Pdf
Od 17 7 T11- Typ Floor 27th To 30th.Pdf
Od 18 8 T11-Typ 5th To 23rd & 8th To 24th.Pdf
Od 19 9 T11-Terrace.Pdf
Od 20 10 T11-Site Plan.Pdf
Od 21 BDA Work Order.Pdf
Od 22 BBMP And BDA Approved Plan.Pdf
Od 23 BBMP And BDA Sanction Letter.Pdf
Od 24 HAL NOC Dated 07-01-2023.Pdf
Ed 1 18-01-2024
Ed 2 18-01-2024
Ed 3 18-01-2024
Ed 4 18-01-2024
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 57500001071293
IFSC HDFC0002710
Branch Address World Trade Centre, Bengaluru
Country/City