Sumadhura Aspire Amber RERA Details - PRM/KA/RERA/1251/446/PR/250222/004731 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sumadhura Aspire Amber under registration PRM/KA/RERA/1251/446/PR/250222/004731 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/250222/004731
  • Project Name ASPIRE AMBER
  • Project Type Residential/Group Housing
  • Project Status Ready to Move
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 31 December 2024
  • Documents 76 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 December 2021 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2024 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

SUMADHURA HOMES LLP
Registered Address NO 108/2 MILLENIA BUILDING 1st MAIN MSR LAYOUT,MUNNEKOLLALA VILLAGE MARATHAHALLI RING ROAD ,Bengaluru East ,Bengaluru Urban-560037
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Survey Number 114/5 Doddabanahalli Village , Bidarahalli Hobli Bangalore East Bangalore , Bengaluru East , Bengaluru Urban, Karnataka - 560067

RERA Coordinates

Latitude, Longitude 13.029746880639989, 77.75216002019043
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BDA/PS/EM/EO-1/TA-4/East/16/2021-21
Authority BDA - Bangalore Development Authority
Approved Date 10 November 2021

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
WING-A 1 8 0 90 Residential 24.0 7 90
WING-B 1 8 0 63 Residential 24.0 7 63
WING-C 1 8 0 63 Residential 24.0 7 63

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • WING-A
  • WING-B
  • WING-C
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 2 BHK 59 A002
-1 2 BHK 59 A003
-1 2 BHK 59 A004
-1 2 BHK 59 A005
-1 2 BHK 59 A006
-1 2 BHK 59 A007
-1 2 BHK 59 A008
-1 2 BHK 59 A009
-1 2 BHK 59 A010
GF 2 BHK 59 A102
GF 2 BHK 59 A103
GF 2 BHK 59 A104
GF 2 BHK 59 A105
GF 2 BHK 60 A106
GF 2 BHK 60 A107
GF 2 BHK 60 A108
GF 2 BHK 60 A109
GF 2 BHK 60 A110
1 2 BHK 58 A201
1 2 BHK 59 A202
1 2 BHK 59 A203
1 2 BHK 59 A204
1 2 BHK 59 A205
1 2 BHK 60 A206
1 2 BHK 60 A207
1 2 BHK 60 A208
1 2 BHK 60 A209
1 2 BHK 60 A210
1 3 BHK 59 A211
1 3 BHK 59 A212
2 2 BHK 58 A301
2 2 BHK 59 A302
2 2 BHK 59 A303
2 2 BHK 60 A304
2 2 BHK 59 A305
2 2 BHK 60 A306
2 2 BHK 60 A307
2 2 BHK 60 A308
2 2 BHK 60 A309
2 2 BHK 60 A310
2 3 BHK 59 A311
2 3 BHK 59 A312
3 2 BHK 58 A401
3 2 BHK 59 A402
3 2 BHK 59 A403
3 2 BHK 60 A404
3 2 BHK 59 A405
3 2 BHK 60 A406
3 2 BHK 60 A407
3 2 BHK 60 A408
3 2 BHK 60 A409
3 2 BHK 60 A410
3 3 BHK 59 A411
3 3 BHK 59 A412
4 2 BHK 58 A501
4 2 BHK 59 A502
4 2 BHK 59 A503
4 2 BHK 60 A504
4 2 BHK 59 A505
4 2 BHK 60 A506
4 2 BHK 60 A507
4 2 BHK 60 A508
4 2 BHK 60 A509
4 2 BHK 60 A510
4 3 BHK 59 A511
4 3 BHK 59 A512
5 2 BHK 58 A601
5 2 BHK 59 A602
5 2 BHK 59 A603
5 2 BHK 60 A604
5 2 BHK 59 A605
5 2 BHK 60 A606
5 2 BHK 60 A607
5 2 BHK 60 A608
5 2 BHK 60 A609
5 2 BHK 60 A610
5 3 BHK 59 A611
5 3 BHK 59 A612
6 2 BHK 58 A701
6 2 BHK 59 A702
6 2 BHK 59 A703
6 2 BHK 60 A704
6 2 BHK 59 A705
6 2 BHK 60 A706
6 2 BHK 60 A707
6 2 BHK 60 A708
6 2 BHK 60 A709
6 2 BHK 60 A710
6 3 BHK 59 A711
6 3 BHK 59 A712
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 NOT APPLICABLE.Pdf
Fd 2 Balance Sheet 2019-20.Pdf
Fd 3 NOT APPLICABLE.Pdf
Fd 4 NOT APPLICABLE.Pdf
Fd 5 Profit & Loss 2019-20.Pdf
Fd 6 NOT APPLICABLE.Pdf
Fd 7 NOT APPLICABLE.Pdf
Fd 8 NOT APPLICABLE.Pdf
Fd 9 NOT APPLICABLE.Pdf
Fd 10 NOT APPLICABLE.Pdf
Fd 11 NOT APPLICABLE.Pdf
Fd 12 NOT APPLICABLE.Pdf
Fd 13 NOT APPLICABLE.Pdf
Fd 14 NOT APPLICABLE.Pdf
Fd 15 NOT APPLICABLE.Pdf
Fd 16 NOT APPLICABLE.Pdf
Fd 17 IT Ack 2019-20.Pdf
Fd 18 NOT APPLICABLE.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 23 Proforma For Sale Deed*( Annexure - 88 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 3 Approval NOC Under Section 109 Of KLR Act 1961( Annexure - 95 )
Noc 4 Approval NOC Under Section 14 Of The KTCP Act( Annexure - 96 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Photo 1 Project Photo
Od 1 Deed Gift Of Shantha Kumari.Pdf
Ed 1 18-12-2021
Ed 2 18-12-2021
Ed 3 18-12-2021
Ed 4 18-12-2021
Ed 5 18-12-2021
Ed 6 18-12-2021
Ed 7 18-12-2021
Ed 8 18-12-2021
Ed 9 18-12-2021
Ed 10 03-01-2022
Ed 11 03-01-2022
Ed 12 03-01-2022
Ed 13 14-01-2022
Ed 14 28-01-2022
Ed 15 12-02-2022
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Axis Bank
Account Number (RERA) 921020049502035
IFSC UTIB0003411
Branch Address VICTORIA LAYOUT
Country/City