Udbhav Gokulam RERA Details - PRM/KA/RERA/1251/446/PR/040524/006861 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Udbhav Gokulam under registration PRM/KA/RERA/1251/446/PR/040524/006861 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/040524/006861
  • Project Name UDBHAV GOKULAM
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 31 March 2027
  • Documents 88 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 25 April 2024 Expected commencement of civil works and foundation on site.
Original Completion 31 March 2027 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

UDBHAV BUILDERS AND DEVELOPERS
Registered Address NO. 32, RENUKA NILAYA, RAMAPURA MAIN ROAD, ,VIRGONAGAR POST, BANGALORE ,Bengaluru East ,Bengaluru Urban-560049
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address KHATHA NO. 3639, SY. NOS. 73/6 AND 73/9, BALAGERE VILLAGE , VARTHUR HOBLI, WARD NO. 149, BANGALORE EAST TALUK , Bengaluru East , Bengaluru Urban, Karnataka - 560087

RERA Coordinates

Latitude, Longitude 12.939828953712276, 77.72604544427166
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/ADDL.DIR/JDNORTH/0097/23-24
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 02 April 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
WING 2 1 6 0 97 Residential 14.95 4 90
WING 1 1 6 0 100 Residential 14.95 4 89

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • WING 2
  • WING 1
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 91.60163508 001
-1 3 BHK 86.30620587 002
-1 2 BHK 71.34894091 003
-1 2 BHK 71.34894091 004
-1 3 BHK 91.60163508 005
-1 3 BHK 91.41583055 006
-1 3 BHK 86.12040134 007
-1 3 BHK 85.3771832 008
-1 3 BHK 85.3771832 009
-1 3 BHK 81.01077666 010
-1 3 BHK 81.475288 011
-1 3 BHK 81.475288 012
-1 3 BHK 81.66109253 013
-1 3 BHK 93.92419175 014
-1 2 BHK 75.62244519 015
-1 2 BHK 75.62244519 016
-1 2 BHK 75.62244519 017
-1 3 BHK 91.23002601 018
GF 3 BHK 91.60163508 101
GF 3 BHK 86.30620587 102
GF 2 BHK 71.34894091 103
GF 2 BHK 71.34894091 104
GF 3 BHK 91.60163508 105
GF 3 BHK 91.41583055 106
GF 3 BHK 86.12040134 107
GF 3 BHK 85.3771832 108
GF 3 BHK 85.3771832 109
GF 3 BHK 81.01077666 110
GF 3 BHK 81.475288 111
GF 3 BHK 81.475288 112
GF 3 BHK 81.66109253 113
GF 3 BHK 93.92419175 114
GF 2 BHK 75.62244519 115
GF 2 BHK 75.62244519 116
GF 2 BHK 75.62244519 117
GF 3 BHK 91.23002601 118
1 3 BHK 91.60163508 201
1 3 BHK 86.30620587 202
1 2 BHK 71.34894091 203
1 2 BHK 71.34894091 204
1 3 BHK 91.60163508 205
1 3 BHK 91.41583055 206
1 3 BHK 86.12040134 207
1 3 BHK 85.3771832 208
1 3 BHK 85.3771832 209
1 3 BHK 81.01077666 210
1 3 BHK 81.475288 211
1 3 BHK 81.475288 212
1 3 BHK 81.66109253 213
1 3 BHK 93.92419175 214
1 2 BHK 75.62244519 215
1 2 BHK 75.62244519 216
1 2 BHK 75.62244519 217
1 3 BHK 91.23002601 218
2 3 BHK 91.60163508 301
2 3 BHK 86.30620587 302
2 2 BHK 71.34894091 303
2 2 BHK 71.34894091 304
2 3 BHK 91.60163508 305
2 3 BHK 91.41583055 306
2 3 BHK 86.12040134 307
2 3 BHK 85.3771832 308
2 3 BHK 85.3771832 309
2 3 BHK 81.01077666 310
2 3 BHK 81.475288 311
2 3 BHK 81.475288 312
2 3 BHK 81.66109253 313
2 3 BHK 93.92419175 314
2 2 BHK 75.62244519 315
2 2 BHK 75.62244519 316
2 2 BHK 75.62244519 317
2 3 BHK 91.23002601 318
3 3 BHK 91.60163508 401
3 3 BHK 86.30620587 402
3 2 BHK 71.34894091 403
3 2 BHK 71.34894091 404
3 3 BHK 91.60163508 405
3 3 BHK 91.41583055 406
3 3 BHK 86.12040134 407
3 3 BHK 85.3771832 408
3 3 BHK 85.3771832 409
3 3 BHK 81.01077666 410
3 3 BHK 81.475288 411
3 3 BHK 81.475288 412
3 3 BHK 81.66109253 413
3 3 BHK 93.92419175 414
3 2 BHK 75.62244519 415
3 2 BHK 75.62244519 416
3 2 BHK 75.62244519 417
3 3 BHK 91.23002601 418
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Will Upload Later.Pdf
Fd 2 UDBHAV BUILDERS AND DEVELOPERS AY 23-24.Pdf
Fd 3 NOT APPLICABLE.Pdf
Fd 4 Will Upload Later.Pdf
Fd 5 UDBHAV BUILDERS AND DEVELOPERS AY 23-24.Pdf
Fd 6 NOT APPLICABLE.Pdf
Fd 7 Will Upload Later.Pdf
Fd 8 UDBHAV BUILDERS AND DEVELOPERS AY 23-24.Pdf
Fd 9 NOT APPLICABLE.Pdf
Fd 10 Will Upload Later.Pdf
Fd 11 UDBHAV BUILDERS AND DEVELOPERS AY 23-24.Pdf
Fd 12 NOT APPLICABLE.Pdf
Fd 13 Will Upload Later.Pdf
Fd 14 UDBHAV BUILDERS AND DEVELOPERS AY 23-24.Pdf
Fd 15 NOT APPLICABLE.Pdf
Fd 16 Will Upload Later.Pdf
Fd 17 UDBHAV BUILDERS AND DEVELOPERS AY 23-24.Pdf
Fd 18 NOT APPLICABLE.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 3 Approval NOC Under Section 109 Of KLR Act 1961( Annexure - 95 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 73 6 Podi Document.Pdf
Od 2 D RAMSWAMY REDDY & SARASWATHAMMA SHARING AGREMENT.Pdf
Od 3 B R SRINIVAS REDDY SHARING AGREMENT.Pdf
Od 4 BHAGYAMMA SHARING AGREMENT.Pdf
Od 5 GIRIJAMMA AND SAMPANGI REDDY SHARING AGREMENT.Pdf
Od 6 MANJUNATH REDDY SHARING AGREMENT.Pdf
Od 7 Balagere Syno 73,.Pdf
Od 8 Bal 73-9.Pdf
Od 9 RTC 2023 24 73 6.Pdf
Od 10 RTC 2023 24 73 9.Pdf
Od 11 RTC 2023 24 73 11.Pdf
Od 12 Tax Paid 2023 24 73 6.Pdf
Od 13 Tax Paid 2023 24 73 9.Pdf
Od 14 STP Drawing.Pdf
Od 15 UDBHAVA BUILDERS AND DEVELOPERS Rera Area Confirmation.Pdf
Od 16 UDBHAVA BUILDERS AND DEVELOPERS Abstract.Pdf
Od 17 Project Specifications.Pdf
Ed 1 01-05-2024
Ed 2 01-05-2024
Ed 3 01-05-2024
Ed 4 01-05-2024
Ed 5 01-05-2024
Ed 6 01-05-2024
Ed 7 01-05-2024
Ed 8 01-05-2024
Ed 9 01-05-2024
Ed 10 01-05-2024
Ed 11 01-05-2024
Ed 12 01-05-2024
Ed 13 03-05-2024
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Axis Bank
Account Number (RERA) 924020019925977
IFSC UTIB0002928
Branch Address PANATHUR
Country/City