Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.mh

Ashar Maple Birch RERA Details - P51800023941, Mumbai

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Ashar Maple Birch under registration P51800023941 in Mumbai, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P51800023941
  • Project Name ASHAR MAPLE BIRCH
  • Project Type Residential / Group Housing
  • Project Status Ready to Move
  • State Maharashtra
  • District Thane
  • Taluka Thane
  • Original Completion 30 December 2025
  • Revised Completion 30 December 2025
  • Project Area (in Sq.mt.) 6,782.68
  • Total Buildings/Towers 1
  • Documents 13 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 14 January 2020 Expected commencement of civil works and foundation on site.
Original Completion 30 December 2025 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 December 2025 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Others
Individule Name Ms ASHAR REALTORS
Experience Details
Project NameAddressLand AreaProject StatusType of ProjectBuild Plot CountApartment countProposed Completion DateProject End DateLitigation PresentLitigation Details
ASHAR MONARCHGLEDY ALWARIS ROAD POKHRAN NO II THANE WEST 952.13CompletedResidential / Group Housing11332015-05-312015-05-05NoNA

Promoters, Co-promoters & Members

NameAddress
AJAY ASHAROayjRmfNVD0LlZQte1lhgW/tujAoZ13f3opDrUIJoecWKOLnW770mgOeP6lJvYOi, Thane, MAHARASHTRA
RUXMANI DAISARIAThane, MAHARASHTRA
ASHAR REALTY PRIVATE LIMITEDThane, MAHARASHTRA

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors No. of Habitable Floor No. of Sanctioned Apartment Wing Name
ASHAR MAPLE BIRCH ASHAR MAPLE BIRCH 11 247 41 0 0 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 245
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 96 units · avg area 42.10 Sq.mt.
2 BHK 149 units · avg area 56.16 Sq.mt.
  • ASHAR MAPLE BIRCH
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
GRAND B 2 BHK 63.76 16 16
SMART B 2 BHK 52.11 7 7
SMART 2 BHK 51.8 21 21
SMART 2 BHK 51.62 30 29
SMART B 2 BHK 48.96 7 6
1BHK TYPE 1 39.43 32 25
1 BHK TYPE 2 43.58 32 31
SMART 2 BHK 48.65 21 21
GRAND 2 BHK 63.45 47 46
1 BHK TYPE 3 43.29 32 30
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths % not reported Water Supply % not reported Sewerage (Chamber, Lines, Septic Tank , Stp) % not reported
Storm Water Drains % not reported Landscaping & Tree Planting % not reported Street Lighting % not reported
Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water % not reported Solid Waste Management And Disposal % not reported
Water Conservation /Rain Water Harvesting % not reported Energy Managemcnt % not reported Fire Protection And Fire Safety Requirements % not reported
Electrical Meter Room, Sub-station, Receiving Station % not reported Aggregate Area Of Recreational Open Space % not reported Open Parking % not reported
Sports Area With Multipurpose Court % not reported Skating Rink % not reported Seniors Corner % not reported
Swimming Pool % not reported Reflexologypath % not reported Paved Community Deck % not reported
Party Lawn % not reported Net Cricket % not reported Gymnasium And Aerobics Yoga Center % not reported
Free Play Area % not reported Cycling Trail % not reported Jogging Track % not reported
Meditation And Yoga Deck % not reported Tea Party Bay % not reported Toddler Play Area % not reported
Multipurpose Hall With Indoor Games % not reported Barbeque Area % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • ASHAR MAPLE BIRCH
ASHAR MAPLE BIRCH · Overall Progress 67%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Complete
% Work100%
Plinth
Complete
% Work100%
Stilt Floor
Complete
% Work100%
Slabs of Super Structure
In Progress
% Work85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
In Progress
% Work25%
Sanitary Fittings within the flats / premises
In Progress
% Work30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
In Progress
% Work60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
In Progress
% Work25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
In Progress
% Work10%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Details Html
1 IOD And Plans.Pdf.Pdf
2 Maple B Layout 1 MB 27 Dec.Pdf.Pdf
3 Maple Amendment Plan 22 06 2022.Pdf.Pdf
4 Ashar Realtors PAN.Pdf.Pdf
5 Disclosure Maple.Pdf.Pdf
6 Declaration About CC Maple Birch.Pdf.Pdf
7 Disclosure 2 Change In Nomenclature.Pdf.Pdf
8 Maple Birch.Pdf.Pdf
9 Ashar Maple B 1MB.Pdf.Pdf
10 Affidavit Cum Declaration 1MB.Pdf.Pdf
11 Agreement For Sale Maple .Pdf.Pdf
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI BANK LIMITED
IFSC ICIC0000151
Branch Address SHOP NO 14-15-16, SHRI GANESH CHS,SECTOR I, VASHI,NAVI MUMBAI, MAHARASHRTRA-400703
Country/City